Geology Reports⌕ Search

SEARCH · Geology Reports

Results for “Open File”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91Linked to original sources

Permissive tracts for sediment-hosted copper deposits in Mauritania (phase V, deliverable 74): Chapter K1 in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Permissive tracts for volcanogenic massive sulfide deposits in Mauritania (phase V, deliverable 76): Chapter L1 in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Permissive tracts for algoma-, superior-, and oolitic-type iron deposits in Mauritania (phase V, deliverable 82): Chapter O1 in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Permissive tracts for incompatible element deposits hosted in pegmatities, alkaline rocks, and carbonatities in Mauritania (phase V, deliverable 86), Chapter Q1 in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Geographic Information Systems (GIS) for la République Islamique de Mauritanie (PRISM-II) phase V (phase V, deliverable 92)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Mineral potential tracts for orogenic, Carlin-like, and epithermal gold deposits in the Islamic Republic of Mauritania, (phase V, deliverable 68): Chapter H1 in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Reported industrial minerals occurrences and permissive areas for other occurrences in the Islamic Republic of Mauritania (phase V deliverable 88): Chapter R1 in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Structure map of Mauritania (phase V, deliverables 52a and 52b)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Geologic map of Mauritania (phase V, deliverables 51a, 51b, and 51c)

In 1996, at the request of the Government of the Islamic Republic of Mauritania, a team of U.S. Geological Survey (USGS) scientists produced a strategic plan for the acquisition, improvement and modernization of multidisciplinary sets of data to support the growth of the Mauritanian minerals sector and to highlight the geological and mineral exploration potential of the country. In 1999, the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania implemented a program for the acquisition of the recommended basic geoscientific information, termed the first Projet de Renforcement Institutionnel du Secteur Minier (Project for Institutional Capacity Building in the Mining Sector, PRISM-I). As a result of the PRISM-I efforts, a great deal of new geological, geophysical, geochemical, remote sensing, and hydrological data became available for evaluation and synthesis. However, the Ministry of Petroleum, Energy, and Mines recognized that additional work was required to extract the full benefit of the data before it could be of greatest use to the international community and of benefit to the Mauritanian minerals and development sector. To achieve this benefit, the Ministry of Petroleum, Energy, and Mines implemented a second Projet de Renforcement Institutionnel du Secteur Minier (PRISM-II) in 2006 to consolidate, synthesize, and interpret all of the existing data, create a new 1:1,000,000 scale geologic map, and define the mineral resource potential of the country. A consortium in which the USGS was the lead scientific agency carried out the majority of the PRISM-II work. In 2008, the USGS Mauritania Minerals Project was interrupted due to political changes in Mauritania. PRISM-II work resumed in 2011, and was completed in 2013 with the delivery of over 40 separate written reports and plates, an access file containing the Mauritanian National Mineral Deposits Database, and an interactive GIS containing all of the multi-disciplinary data and interpretive areas of mineral resource potential in Mauritania. This report contains the USGS results of the PRISM-II Mauritania Minerals Project and is presented in cooperation with the Ministry of Petroleum, Energy, and Mines of the Islamic Republic of Mauritania. The Report is composed of separate chapters consisting of multidisciplinary interpretive reports with accompanying plates on the geology, structure, geochronology, geophysics, hydrogeology, geochemistry, remote sensing (Landsat TM and ASTER), and SRTM and ASTER digital elevation models of Mauritania. The syntheses of these multidisciplinary data formed the basis for additional chapters containing interpretive reports on 12 different commodities and deposit types known to occur in Mauritania, accompanied by countrywide mineral resource potential maps of each commodity/deposit type. The commodities and deposit types represented include: (1) Ni, Cu, PGE, and Cr deposits hosted in ultramafic rocks; (2) orogenic, Carlin-like, and epithermal gold deposits; (3) polymetallic Pb-Zn-Cu vein deposits; (4) sediment-hosted Pb-Zn-Ag deposits of the SEDEX and Mississippi Valley-type; (5) sediment-hosted copper deposits; ( 6) volcanogenic massive sulfide deposits; (7) iron oxide copper-gold deposits; (8) uranium deposits; (9) Algoma-, Superior-, and oolitic-type iron deposits; (10) shoreline Ti-Zr placer deposits; (11) incompatible element deposits hosted in pegmatites, alkaline rocks, and carbonatites, and; (12) industrial mineral deposits. Additional chapters include the Mauritanian National Mineral Deposits Database are accompanied by an explanatory text and the Mauritania Minerals Project GIS that contains all of the interpretive layers created by USGS scientists. Raw data not in the public domain may be obtained from the Ministry of Petroleum, Energy, and Mines in Nouakchott, Mauritania.

Open-File Report↗

Daily values flow comparison and estimates using program HYCOMP, version 1.0

A method used by the U.S. Geological Survey for quality control in computing daily value flow records is to compare hydrographs of computed flows at a station under review to hydrographs of computed flows at a selected index station. The hydrographs are placed on top of each other (as hydrograph overlays) on a light table, compared, and missing daily flow data estimated. This method, however, is subjective and can produce inconsistent results, because hydrographers can differ when calculating acceptable limits of deviation between observed and estimated flows. Selection of appropriate index stations also is judgemental, giving no consideration to the mathematical correlation between the review station and the index station(s). To address the limitation of the hydrograph overlay method, a set of software programs, written in the SAS macrolanguage, was developed and designated Program HYDCOMP. The program automatically selects statistically comparable index stations by correlation and regression, and performs hydrographic comparisons and estimates of missing data by regressing daily mean flows at the review station against -8 to +8 lagged flows at one or two index stations and day-of-week. Another advantage that HYDCOMP has over the graphical method is that estimated flows, the criteria for determining the quality of the data, and the selection of index stations are determined statistically, and are reproducible from one user to another. HYDCOMP will load the most-correlated index stations into another file containing the ?best index stations,? but will not overwrite stations already in the file. A knowledgeable user should delete unsuitable index stations from this file based on standard error of estimate, hydrologic similarity of candidate index stations to the review station, and knowledge of the individual station characteristics. Also, the user can add index stations not selected by HYDCOMP, if desired. Once the file of best-index stations is created, a user may do hydrographic comparison and data estimates by entering the number of the review station, selecting an index station, and specifying the periods to be used for regression and plotting. For example, the user can restrict the regression to ice-free periods of the year to exclude flows estimated during iced conditions. However, the regression could still be used to estimate flow during iced conditions. HYDCOMP produces the standard error of estimate as a measure of the central scatter of the regression and R-square (coefficient of determination) for evaluating the accuracy of the regression. Output from HYDCOMP includes plots of percent residuals against (1) time within the regression and plot periods, (2) month and day of the year for evaluating seasonal bias in the regression, and (3) the magnitude of flow. For hydrographic comparisons, it plots 2-month segments of hydrographs over the selected plot period showing the observed flows, the regressed flows, the 95 percent confidence limit flows, flow measurements, and regression limits. If the observed flows at the review station remain outside the 95 percent confidence limits for a prolonged period, there may be some error in the flows at the review station or at the index station(s). In addition, daily minimum and maximum temperatures and daily rainfall are shown on the hydrographs, if available, to help indicate whether an apparent change in flow may result from rainfall or from changes in backwater from melting ice or freezing water. HYDCOMP statistically smooths estimated flows from non-missing flows at the edges of the gaps in data into regressed flows at the center of the gaps using the Kalman smoothing algorithm. Missing flows are automatically estimated by HYDCOMP, but the user also can specify that periods of erroneous, but nonmissing flows, be estimated by the program.

Open-File Report↗

Clay deposits of the Connecticut River Valley, Connecticut: a special problem in land management

When man first settled the United States, two natural features favored settlement; flat land that was easy to build on and to farm, and a nearby river that could act as a source of water, transportation, and power. The Connecticut River Valley from Middletown, Ct. north past the Connecticut-Massachusetts state line satisfied these two needs, and was favored by many early Americans in New England. This area remains an area of rapid urbanization, partly because of the broad flat lowlands. The subdued topography of this area is due in large part to deposition of fine-grained materials into glacial Lake Hitchcock. This lake was formed during the Wisconsinan age when southward drainage in the Triassic valley of Connecticut was dammed by glacial drift in the area of Rocky Hill, Connecticut. Lake Hitchcock grew to and beyond St. Johnsbury, Vt. with much of the lake being filled with cyclical lake-bottom deposits during the 2,290 to 2,350 years of its life. Aside from the relative flatness inherent in the deposition of fine-grained lake-bottom deposits, these deposits present very few characteristics that are favorable for urbanization. Favorable characteristics are possible sources of clay for manufacturing and possible sources for waste storage sites. Unfavorable characteristics include low water yields resulting in poor urban water-supply sources, and very low flows in streams during dry periods; low percolation rates resulting In drainage and septic problems; and low or uneven bearing strength which create problems in construction. Fine-grained lake-bottom deposits have been mapped for six quadrangles in the Connecticut Valley lowlands; the quadrangles of Windsor Locks, Broad Brook, Hartford North, Manchester, Hartford South, and Glastonbury (all located in Connecticut). All the maps were prepared from existing information including well and test hole data on file at the Water Resources Division in Hartford, surficial geologic quadrangle maps, and bedrock contour maps. The maps also reflect geologic interpretations of the history of glacial Lake Hitchcock. The Hartford North maps were prepared as test maps to determine if the project was feasible. They were prepared using the previously described information plus additional subsurface data obtained from engineering firms and the State Highway Department. During preparation of the maps, an arcuate-shaped, ice-contact deposit composed of coarse sand and gravel was delineated in the Broad Brook and Windsor Locks quadrangles. This feature marks the location of a zone of stagnant ice In front of and marginal to active ice to the north. Two types of maps were prepared for the area in study; Thickness of the Principal Clay Deposit, and Thickness of Material Overlying the Principal Clay Deposit. The term "principal clay deposit" refers to the fine-grained lake-bottom deposits of Glacial Lake Hitchcock. These maps define the distribution of the deposit, and show the thickness of the deposit in 50 foot intervals and the thickness of the material overlying the deposit In 20 foot intervals. The maps indicate that much of the area is underlain with substantial thicknesses of finegrained lake-bottom deposits (50 feet thick or greater), and that much of the deposit is within 20 feet of the surface. The maps included in this report can be used for land-use planning. Uses include location of favorable sites for specific uses such as landfills, utility corridors, heavy construction, etc; location of problem areas for specific land uses; identification of possible problems for specific areas; design and construction cost estimates; and prospecting for exploitable clay deposits. It Is suggested that, for effective planning, these maps be used together or in conjunction with other maps such as maps showing surface materials, depth to bedrock, depth to water table, and flood prone areas.

Connecticut↗

Water quality and discharge data for St. Joseph Bay, Florida, 1997-98

Historical data were compiled on water quality and water levels for the St. Joseph Bay area to assess quality of possible sources of land-derived water into the Bay. Ground-water quality data were compiled from Florida Department of Environmental Protection and surface-water quality data were compiled from U.S.Geological Survey files. Water-quality and water-level data were measured during two sample collection periods in October 1997 and March 1998 to determine water-quality and discharge rates in St. Joseph Bay under two sets of flow conditions. Measurements in the Bay included water level, temperature, pH, specific conductance, dissolved oxygen, and turbidity. Median pH in water from the surficial, intermediate and Floridan aquifer systems ranged from 4.8 to 7.8, and median specific conductance values were less than 500 microsiemens per centimeter. Median nutrient concentrations-- nitrate plus nitrite, ammonia and phosphorus--in the three aquifers were less than 0.5 milligrams per liter. The median pH was 7.0 and the median specific conductance was 81 microsiemens per centimeter for two samples from the Chipola River distribution canal. Water level data were obtained for several wells near St. Joseph Bay but only two wells yielded sufficient data to plot hydrographs. Measurements in St. Joseph Bay during the October and March collection periods were similar for pH and turbidity but differed for temperature, specific conductance and dissolved oxygen. The median temperature was 20.6 degrees Celsius in October and 15.4 degrees Celsius in March, median specific conductance was 39,500 microsiemens per centimeter in October and 43,300 microsiemens per centimeter in March, and median dissolved oxygen was 7.6 milligrams per liter in October and 8.3 milligrams per liter in March. The range in water levels over a tidal cycle in St. Joseph Bay on October 29, 1997 was about 1 foot. During a 24-hour tidal cycle on October 29, 1997, estimated hourly discharge varied from about -116,000 cubic feet per second (ft3/s) (into the Bay) to about +110,000 ft3/s (out of the Bay). During a 24-hour tidal cycle on March 3, 1998, the water level change was about 1.3 feet and estimated hourly discharge varied from about -132,000 ft3/s (into the Bay) to about +121,000 ft3/s (out of the Bay).

Florida↗

Digital data sets that describe aquifer characteristics of the High Plains aquifer in western Oklahoma

ARC/INFO export files This diskette contains digitized aquifer boundaries and maps of hydraulic conductivity, recharge, and ground-water level elevation contours for the High Plains aquifer in western Oklahoma. This area encompasses the panhandle counties of Cimarron, Texas, and Beaver, and the western counties of Harper, Ellis, Woodward, Dewey, and Roger Mills. The High Plains aquifer underlies approximately 7,000 square miles of Oklahoma and is used extensively for irrigation. The High Plains aquifer is a water-table aquifer and consists predominately of the Tertiary-age Ogallala Formation and overlying Quaternary-age alluvial and terrace deposits. In some areas the aquifer is absent and the underlying Triassic, Jurassic, or Cretaceous-age rocks are exposed at the surface. These rocks are hydraulically connected with the aquifer in some areas. The High Plains aquifer is composed of interbedded sand, siltstone, clay, gravel, thin limestones, and caliche. The proportion of various lithological materials changes rapidly from place to place, but poorly sorted sand and gravel predominate. The rocks are poorly to moderately well cemented by calcium carbonate. The aquifer boundaries, hydraulic conductivity, and recharge data sets were created by extracting geologic contact lines from published digital surficial geology maps based on a scale of 1:125,000 for the panhandle counties and 1:250,000 for the western counties. The water-level elevation contours and some boundary lines were digitized from maps in a published water-level elevation map for 1980 based on a scale of 1:250,000. The hydraulic conductivity and recharge values in this report were used as input to the ground-water flow model on the High Plains aquifer. Ground-water flow models are numerical representations that simplify and aggregate natural systems. Models are not unique; different combinations of aquifer characteristics may produce similar results. Therefore, values of hydraulic conductivity and recharge used in the model and presented in this data set are not precise, but are within a reasonable range when compared to independently collected data.

Oklahoma↗

Use of microcomputer in mapping depth of stratigraphic horizons in National Petroleum Reserve in Alaska

REGIONAL MAPPER is a menu-driven system in the BASIC language for computing and plotting (1) time, depth, and average velocity to geologic horizons, (2) interval time, thickness, and interval velocity of stratigraphic intervals, and (3) subcropping and onlapping intervals at unconformities. The system consists of three programs: FILER, TRAVERSER, and PLOTTER. A control point is a shot point with velocity analysis or a shot point at or near a well with velocity check-shot survey. Reflection time to and code number of seismic horizons are filed by digitizing tablet from record sections. TRAVERSER starts at a point of geologic control and, in traversing to another, parallels seismic events, records loss of horizons by onlap and truncation, and stores reflection time for geologic horizons at traversed shot points. TRAVERSER is basically a phantoming procedure. Permafrost thickness and velocity variations, buried canyons with low-velocity fill, and error in seismically derived velocity cause velocity anomalies that complicate depth mapping. Two depths to the top of the pebble is based shale are computed for each control point. One depth, designated Zs on seismically derived velocity. The other (Zw) is based on interval velocity interpolated linearly between wells and multiplied by interval time (isochron) to give interval thickness. Z w is computed for all geologic horizons by downward summation of interval thickness. Unknown true depth (Z) to the pebble shale may be expressed as Z = Zs + es and Z = Zw + ew where the e terms represent error. Equating the two expressions gives the depth difference D = Zs + Zw = ew + es A plot of D for the top of the pebble shale is readily contourable but smoothing is required to produce a reasonably simple surface. Seismically derived velocity used in computing Zs includes the effect of velocity anomalies but is subject to some large randomly distributed errors resulting in depth errors (es). Well-derived velocity used in computing Zw does not include the effect of velocity anomalies, but the error (ew) should reflect these anomalies and should be contourable (non-random). The D surface as contoured with smoothing is assumed to represent ew, that is, the depth effect of variations in permafrost thickness and velocity and buried canyon depth. Estimated depth (Zest) to each geologic horizon is the sum of Z w for that horizon and a constant e w as contoured for the pebble shale, which is the first highly continuous seismic horizon below the zone of anomalous velocity. Results of this 'depthing' procedure are compared with those of Tetra Tech, Inc., the subcontractor responsible for geologic and geophysical interpretation and mapping.

Open-File Report↗

Level II scour analysis for Bridge 22 (WODSTH00180022) on Town Highway 18, crossing north Bridgewater Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00180022 on town highway 18 crossing North Bridgewater Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont. The 4.34-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left bank is forested and the right bank is covered by shrub and brush and is adjacent to woods. The right bank of North Bridgewater Brook is parallel to town highway 18 upstream of the bridge. In the study area, North Bridgewater Brook has a sinuous channel with a slope of approximately 0.038 ft/ft, an average channel top width of 48 ft and an average channel depth of 7 ft. The predominant channel bed materials are gravel and cobbles (D 50 is 63.2 mm or 0.207 ft). Due to cut banks and other channel features the geomorphic assessment at the time of the Level I and Level II site visit on August 16, 1994, indicated that the reach was laterally unstable. In addition, the stream approach to the bridge has a high gradient. However, near the upstream face of the bridge the gradient shallows. Approximately 100 feet downstream of the bridge the gradient steepens again. The town highway 18 crossing of North Bridgewater Brook is a 40-ft-long, two-lane bridge consisting of one 35-foot concrete span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The left and right abutments are not protected by stone fill. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Review of the Lake Washington Ship Canal and Ballard Locks model, Seattle, Washington, 2014–20

Executive Summary The Hiram M. Chittenden (Ballard) Locks and Lake Washington Ship Canal connect freshwater Lake Washington and saline Shilshole Bay of Puget Sound in Seattle, Washington. The locks and canal allow for ships to traverse this reach. Anadromous salmonids also migrate through, transitioning between saline and freshwater environments, and making use of a fish ladder at the locks when traveling upstream. WEST Consultants, Inc., constructed a two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) simulating flow, water temperature, and salinity for the Ballard Locks and the Lake Washington Ship Canal. An initial model was built for calendar years 2014–15, and the model was updated using a more recent and modern dataset for calendar years 2016–20. The U.S. Army Corps of Engineers requested that the U.S. Geological Survey review this model and its documentation to evaluate the technical aspects of its development and calibration. Findings from this review include the following: Overall, the Lake Washington Ship Canal CE-QUAL-W2 model was well-documented and constructed largely following typical model-development methods. The Lake Washington Ship Canal model was built with CE-QUAL-W2 model version 4.5, compiled and released by Portland State University in April 2021. CE-QUAL-W2 updates and improvements are regularly released with bug fixes and new features, so any model updates would benefit from the use of the most-recent software release. The model grid that represents the Lake Washington Ship Canal bathymetry was 9.2 kilometers (5.7 miles) long, matching the expected length of the waterway. The deepest model segments were near sampling site LLLW (Large Locks site) near the locks. Lake Union is reported to constitute most of the volume of the Lake Washington Ship Canal and is depicted as such in the model grid. The model includes several water outflows at Ballard Locks, including the large and small locks, a saltwater drain, a spillway, smolt flumes, and a fish ladder. Flows from the spillway, smolt flumes, and fish ladder were combined into one structure outflow in the model and assigned one withdrawal elevation from the Lake Washington Ship Canal. The smolt flume and spillway withdraw from the same elevation, but the fish ladder flow withdraws from a higher elevation in Lake Washington Ship Canal, and that flow could be separated into its own withdrawal. The model input files were created using the Coordinated Universal Time standard instead of the more typical choice of using local standard time. This is not incorrect, but sub-daily results would need to be converted to local time for science-communication purposes. The meteorological dataset had some unexpected anomalies, such as a baseline shift in the wind-speed dataset. Other nearby meteorological datasets could be used instead or used to correct the current meteorological inputs. The upstream boundary was configured with water-temperature data from a continuous monitor buoy in Lake Washington. The boundary salinity was set at 0 parts per thousand for the duration of the model simulation. A more realistic estimate of salinity at the upstream boundary could be constructed using data from the same buoy. Saline inflow at the downstream boundary of the Lake Washington Ship Canal model through lock exchanges at the large lock was included as a tributary in the model. Salinity and temperature inputs in this tributary at the large locks were set as constant values for the entire simulation. Saline inflow through the small lock was not included in the model because few data were available, and the input was likely to be small because of the smaller surface area and volume of the small lock relative to the large lock. The model did not include any flow, water temperature, or salinity inputs to the Lake Washington Ship Canal other than at the locks and at the upstream boundary. Any point sources, small tributaries, or stormwater inputs were omitted from the model. It is unclear whether this is a substantial omission relative to model results. Most model parameters were set as defaults or to reasonable values. However, the value of the WINDH parameter, the height of the wind speed measurement, was different than the height of the meteorological site. Compared to measured data, the model simulated water-surface elevations and water temperatures with reasonable accuracy. Differences in the modeled and measured salinities revealed some opportunities to improve the simulation of salinity, both baseline salinity and the salinity maxima in summer and autumn.

Washington↗

ERF1_2 -- Enhanced River Reach File 2.0

The digital segmented network based on watershed boundaries, ERF1_2, includes enhancements to the U.S. Environmental Protection Agency's River Reach File 1 (RF1) (USEPA, 1996; DeWald and others, 1985) to support national and regional-scale surface water-quality modeling. Alexander and others (1999) developed ERF1, which assessed the hydrologic integrity of the digital reach traces and calculated the mean water time-of-travel in river reaches and reservoirs. ERF1_2 serves as the foundation for SPARROW (Spatially Referenced Regressions (of nutrient transport) on Watershed) modeling. Within the context of a Geographic Information System, SPARROW estimates the proportion of watersheds in the conterminous U.S. with outflow concentrations of several nutrients, including total nitrogen and total phosphorus, (Smith, R.A., Schwarz, G.E., and Alexander, R.B., 1997). This version of the network expands on ERF1 (Version 1.2; Alexander, et al., 1999) and includes the incremental and total drainage area derived from 1-kilometer (km) elevation data for North America. Previous estimates of the water time-of-travel were recomputed for reaches with water-quality monitoring sites that included two reaches. The mean flow and velocity estimates for these split reaches are based on previous estimation methods (Alexander et al., 1999) and are unchanged in ERF1_2. Drainage area calculations provide data used to estimate the contribution of a given nutrient to the outflow. Data estimates depend on the accuracy of node connectivity. Reaches split at water-quality or pesticide-monitoring sites indicate the source point for estimating the contribution and transport of nutrients and their loads throughout the watersheds. The ERF1_2 coverage extends the earlier drainage area founded on the 1-kilometer data for North America (Verdin, 1996; Verdin and Jenson, 1996). A 1-kilometer raster grid of ERF1_2 projected to Lambert Azimuthal Equal Area, NAD 27 Datum (Snyder, 1987), was merged with the HYDRO1K flow direction data set (Verdin and Jenson, 1996) to generate a DEM-based watershed grid, ERF1_2WS_LG. The watershed boundaries are maintained in a raster (grid cell) format as well as a vector (polygon) format for subsequent model analysis. Both the coverage, ERF1_2, and the grid, ERF1_2WS_LG, are available at: URL:http://water.usgs.gov/lookup/getspatial?erf1_2

Open-File Report↗

The New Albany Shale petroleum system, Illinois basin - Data and map image archive from the material-balance assessment

The data files and explanations presented in this report were used to generate published material-balance approach estimates of amounts of petroleum 1) expelled from a source rock, and the sum of 2) petroleum discovered in-place plus that lost due to 3) secondary migration within, or leakage or erosion from a petroleum system. This study includes assessment of cumulative production, known petroleum volume, and original oil in place for hydrocarbons that were generated from the New Albany Shale source rocks. More than 4.00 billion barrels of oil (BBO) have been produced from Pennsylvanian-, Mississippian-, Devonian-, and Silurian-age reservoirs in the New Albany Shale petroleum system. Known petroleum volume is 4.16 BBO; the average recovery factor is 103.9% of the current cumulative production. Known petroleum volume of oil is 36.22% of the total original oil in place of 11.45 BBO. More than 140.4 BBO have been generated from the Upper Devonian and Lower Mississippian New Albany Shale in the Illinois Basin. Approximately 86.29 billion barrels of oil that was trapped south of the Cottage Grove fault system were lost by erosion of reservoir intervals. The remaining 54.15 BBO are 21% of the hydrocarbons that were generated in the basin and are accounted for using production data. Included in this publication are 2D maps that show the distribution of production for different formations versus the Rock-Eval pyrolysis hydrogen-indices (HI) contours, and 3D images that show the close association between burial depth and HI values.The primary vertical migration pathway of oil and gas was through faults and fractures into overlying reservoir strata. About 66% of the produced oil is located within the generative basin, which is outlined by an HI contour of 400. The remaining production is concentrated within 30 miles (50 km) outside the 400 HI contour. The generative basin is subdivided by contours of progressively lower hydrogen indices that represent increased levels of thermal maturity and generative capacity of New Albany Shale source rocks. The generative basin was also divided into seven oil-migration catchments. The catchments were determined using a surface-flow hydrologic model with contoured HI values as input to the model.

Illinois, Indiana↗