Geology ReportsSearch

SEARCH · Geology Reports

Results for “Biologist”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21Linked to original sources

Optimization of salt marsh management at the Stewart B. McKinney National Wildlife Refuge, Connecticut, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Stewart B. McKinney National Wildlife Refuge in Connecticut. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of two marsh management units within the refuge and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that would be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that would maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to approximately $ 1,190,000, but that further expenditures may yield diminishing return on investment. Management actions in optimal portfolios at total costs less than $1,190,000 included controlling avian predators in both management units, managing stormwater on lands adjacent to one marsh management unit, and removing a tide gate and breaching a dike to improve tidal flow in the other marsh management unit. The management benefits were derived from expected increases in the numbers of spiders (as an indicator of trophic health) and tidal marsh obligate birds, and an expected decrease in the use of herbicides to control invasive vegetation. The prototype presented here provides a framework for decision making at the Stewart B. McKinney National Wildlife Refuge that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

Connecticut

Optimization of salt marsh management at the Edwin B. Forsythe National Wildlife Refuge, New Jersey, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Edwin B. Forsythe National Wildlife Refuge in New Jersey. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of 23 marsh management units within the refuge and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to about \$980,000, but that further expenditures may yield diminishing return on investment. Potential management actions in optimal portfolios at total costs less than \$980,000 included applying sediment to the marsh surface to increase elevation in five marsh management units, digging runnels on the marsh surface to improve drainage in five marsh management units, and breaching roads and berms to improve tidal flow in five marsh management units. The potential management benefits were derived from expected reduction in the duration of surface flooding, improved capacity for marsh elevation to keep pace with sea-level rise and increases in numbers of spiders (as an indicator of trophic health), tidal marsh obligate birds, and wintering American black ducks. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Edwin B. Forsythe National Wildlife Refuge that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

New Jersey

Changes in forest connectivity from beech bark disease in Pictured Rocks National Lakeshore in the Upper Peninsula of Michigan

Within the forests of Pictured Rocks National Lakeshore, biologists are trying to understand the effects beech bark disease has on wildlife species, especially species that need forest connectivity to thrive. This project used aerial imagery collected in 2005, shortly after beech bark disease infestation, and satellite imagery from 2018. The 2018 imagery represents present day conditions and was used to locate forest canopy gaps through object-based image analysis. Forest canopy gaps were identified using the multiresolution segmentation algorithm within Trimble’s eCognition software. A time change analysis was completed to understand how the forest canopy had changed from 2005 to 2018. The analysis showed areas that had maintained forest canopy, maintained a forest canopy gap, created a new canopy gap (closed forest canopy in 2005 but open canopy gap in 2018), or created new forest canopy (open canopy gap in 2005 but closed forest canopy in 2018). There were 9,127 acres of forest canopy lost, and 72.8 percent of that lost canopy occurred in a forest type where Fagus grandifolia Ehrh. (American beech) is a common tree species. The datasets developed through this project can enhance knowledge of where canopy gaps exist and help place focus on certain areas for wildlife studies. In addition, these datasets can be used in future studies to monitor the health of the forest and conduct additional change analyses.

Michigan

Optimization of salt marsh management at the Long Island National Wildlife Refuge Complex, New York, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Long Island National Wildlife Refuge Complex in New York. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of five marsh management units within the refuge complex and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge-complex scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to about $24,000 , but that further expenditures may yield diminishing return on investment. Potential management actions in optimal portfolios at total costs less than $24,000 consistently included approaches for increasing drainage from the marsh surface within the marsh management units. The potential management benefits were derived from expected improvements in surface-water drainage and capacity for marsh elevation to keep pace with sea-level rise, and presumed increases in numbers of spiders (as an indicator of trophic health) and tidal marsh obligate birds. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Long Island National Wildlife Refuge Complex that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

New York

Optimization of salt marsh management at the Rachel Carson National Wildlife Refuge, Maine, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop an example of a prototype tool for optimizing tidal marsh management decisions for selected marsh management units at the Rachel Carson National Wildlife Refuge in Maine. The goal was to create a prototype that could be available for future implementation. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of seven marsh management units within the refuge and estimated the outcomes of each action in terms of regional performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Management costs were estimated using limited available information, and estimated costs of individual management actions reflected relative differences among actions rather than actual expected expenditures. Results from this prototype showed how, for the objectives, actions, and estimated outcomes used for this example, total management benefits may increase consistently up to a certain estimated cost, and may continue to increase, at a lower rate, with further expenditures. Potential management actions in optimal portfolios at moderate total estimated costs included breaching or removing dikes, roads, or embankments; planting Spartina alterniflora (smooth cordgrass); and digging runnels, or shallow creeks, on the marsh platform to improve surface-water drainage. Potential management actions in optimal portfolios at high estimated costs (for example, up to $550,000) included breaching embankments to restore tidal exchange followed by planting salt marsh vegetation. The potential management benefits were derived from predicted increases in the numbers of tidal marsh obligate birds and spiders (as an indicator of trophic health), and expected improvement in the capacity of marsh elevation to keep pace with sea-level rise and reduced duration of marsh-surface inundation. The prototype presented here does not resolve current management decisions; rather, it provides a framework for decision making at the Rachel Carson National Wildlife Refuge that can be updated for implementation as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

Maine

Climate change adaptation thinking for managed wetlands

Climate change presents new and ongoing challenges to natural resource management. To confront these challenges effectively, managers need to develop proactive adaptation strategies to prepare for and deal with the effects of climate change. We engaged managers and biologists from several midwestern U.S. Fish and Wildlife Service field stations to understand recent and future climate change effects, identify adaptation barriers and opportunities, and pilot an approach for integrating adaptation thinking into management planning. To start, three structured discussions informed our understanding of how managers currently deal with climate change effects, the strategies being implemented to cope, and the barriers that limit climate change adaptation efforts. We used these insights to develop a multiday virtual workshop geared toward identifying potential adaptation strategies for managed wetlands. First, we developed a conceptual model to visualize how management actions are used to meet habitat objectives within wetland management systems. Next, we discussed how climate change may affect management actions and objectives; we used this understanding of potential effects to spatially assess vulnerability of managed wetlands to climate change. Using a scenario planning approach, we incorporated multiple potential future conditions and identified effects and adaptation strategies that could be considered for each scenario. As a result, several adaptation strategies for managed wetlands under dry and wet future scenarios were identified that can be applied when developing site-specific adaptation plans. Based on our piloted approach, we determined it would be important to have an adaptation team composed of scientists and managers to facilitate discussions, develop appropriate scenarios, and identify realistic adaptation options. We document the tools, findings, and adaptation thinking process taken to enhance adaptation efforts of managed wetlands. The adaptation thinking process can be applied to advance adaptation efforts in other habitats, ecosystems, and site-specific land management.

Open-File Report

Optimization of salt marsh management at the Moosehorn National Wildlife Refuge, Maine, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Moosehorn National Wildlife Refuge in Maine. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of four marsh management units within the refuge, totaling about 13 hectares, and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to $ 1,000, and may continue to increase at a lower rate with further expenditures. Potential management actions in optimal portfolios at total costs less than or equal to $ 1,000 included improving nesting habitat for Ammodramus nelsoni (Nelson’s sparrow) or restoring hydrologic connections to the upper marsh in one marsh management unit (Hobart Stream West). The potential management benefits were derived from expected increases in the density of nekton and of spiders (as an indicator of trophic health). The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Moosehorn National Wildlife Refuge that can be updated for implementation as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuge.

Maine

Optimization of salt marsh management at the Eastern Shore of Virginia and Fisherman Island National Wildlife Refuges, Virginia, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Eastern Shore of Virginia and Fisherman Island National Wildlife Refuges in Virginia. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of six marsh management units within the refuges, totaling about 575 hectares, and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to approximately $ 143,000, but that further expenditures may yield diminishing return on investment. Potential management actions in optimal portfolios at total costs less than $ 143,000 included digging runnels by hand to improve drainage from the marsh surface, breaching a road to restore natural hydrology, trapping predators to enhance nest success of tidal marsh birds, and reducing the abundance of Odocoileus virginianus (white-tailed deer) to minimize their effects on marsh vegetation. The potential management benefits were derived from expected increases in number of tidal marsh obligate breeding birds, species richness of nekton, and density of spiders (as an indicator of trophic health); and an expected decrease in duration of surface flooding. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Eastern Shore of Virginia and Fisherman Island National Wildlife Refuges that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

Virginia

Optimization of salt marsh management at the Petit Manan National Wildlife Refuge of the Maine Coastal Islands National Wildlife Refuge Complex, Maine, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Petit Manan National Wildlife Refuge of the Maine Coastal Islands National Wildlife Refuge Complex in Maine. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of two marsh management units within the refuge complex, totaling about 47 hectares, and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to $ 9,545, and may continue to increase at a lower rate with further expenditures. Potential management actions in optimal portfolios at total costs less than or equal to $ 9,545 included removing dikes to restore tidal flow in the Gouldsboro Bay management unit and installing runnels to improve surface-water drainage in the Sawyers Marsh management unit. The potential management benefits were derived from expected increases in the numbers of tidal marsh obligate breeding birds and density of spiders (as an indicator of trophic health), reduced duration of flooding, and increased capacity of marsh elevation to keep pace with sea-level rise. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Maine Coastal Islands National Wildlife Refuge Complex that can be updated for implementation as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuge complex.

Maine

Adult green sturgeon (Acipenser medirostris) movements in the Sacramento–San Joaquin River Delta, California, December 2020–January 2023

The U.S. Army Corps of Engineers American River Watershed Common Features project (ACRF) seeks to reduce flood risk for the City of Sacramento, California, and surrounding areas. The project includes levee-remediation measures to address seepage, stability, erosion, and height concerns as well as the widening of the Sacramento Weir and Bypass. The project reach is in the lower extent of the Sacramento River migration corridor for the federally threatened southern Distinct Population Segment of North American green sturgeon ( Acipenser medirostris ). To establish baseline migratory behavior, we examined adult green sturgeon transit through the project area prior to construction. Biologists from the U.S. Army Corps of Engineers collected and tagged 55 adult green sturgeon with acoustic and passive integrated transponders, near Hamilton City, California, at river kilometer 332 of the Sacramento River each fall from 2020 to 2022. To evaluate fish movements, we deployed five acoustic detection sites at river kilometers 101, 90, 76, and 21 on the Sacramento River and in Tule Canal near the Sacramento Bypass at river kilometer 101 of the Sacramento River. The acoustic receivers detected nearly all tagged fish moving downstream through the ARCF study area during the same water year (October 1–September 30) in which they were tagged. Three fish released in October of 2020 arrived at the ARCF study area more than 362 days later in October 2021. The timing of tagged fish movements was associated with increases in river flow and not hour of day. Adult green sturgeon moved downstream from January to August when streamflows exceeded 15,000 cubic feet per second. During water year 2023 and the critically dry water year 2022, fish moved with the first peaks in flow occurring from mid-October to early January. Fish tagged in the critically dry water year 2021 entered the ARCF study area over an extended period from January to October, when flows remained around 10,000 cubic feet per second all year. Fish moved quickly between sites within the ARCF study area and generally spent less than 1 hour at each detection site.

California

Assessment of the potential effects of climate change on water resources of the Delaware River basin; work plan for 1988-90

The current consensus is that some global atmospheric warming will occur as a result of increasing ' greenhouse ' gases. Water resources scientists, planners, and managers are concerned about the uncertainty associated with climatic-change effects on water supplies and what planning might be necessary to mitigate the effects. Collaborative studies between climatologists, hydrologists, biologists, and others are needed to gain this understanding. The Delaware River basin study is an interdisciplinary effort on the part of the U.S. Geological Survey that was initiated to improve understanding of the sensitivity of the basin 's water resources to the potential effects of climate change. The Delaware River basin is 12,765 sq mi in area, crosses five physiographic provinces, and supplies water for an estimated 20 million people within and outside the basin. Climate change presumably will result in changes in precipitation and temperature and could have significant effects on evapotranspiration, streamflow, and groundwater recharge. A rise in sea level is likely to accompany global warming and, depending on changes in freshwater inflows, could alter the salinity of the Estuary and increase saline-water intrusion into adjacent aquifer systems. Because the potential effects are not well understood, this report discusses how the effects of climate change on the basin 's water resources might be defined and evaluated. The study objective is to investigate the basin 's hydrologic response, under existing water management policy and infrastructure, to various scenarios of climate change. Specific objectives include defining the temporal and spatial variability of basin hydrology under existing climate conditions , developing climate-change scenarios, and evaluating the potential effects and sensitivities of basin water availability to these scenarios. The objectives will be accomplished through intensive modeling analysis of the basin 's climate, watershed, estuary, and aquifer systems. (USGS)

Open-File Report

Report of the Interagency biological methods workshop

The U.S. Geological Survey hosted the Interagency Biological Methods Workshop in Reston, Virginia, during June 22-23, 1993. The purposes of the workshop were to (1) promote better communication among Federal agencies that are using or developing biological methods in water-quality assessment programs for streams and rivers, and (2) facilitate the sharing of data and interagency collaboration. The workshop was attended by 45 biologists representing numerous Federal agencies and programs, and a few regional and State programs that were selected to provide additional perspectives. The focus of the workshop was community assessment methods for fish, invertebrates, and algae; physical habitat characterization; and chemical analyses of biological tissues. Charts comparing program objectives, design features, and sampling methods were compiled from materials that were provided by participating agencies prior to the workshop and formed the basis for small workgroup discussions. Participants noted that differences in methods among programs were often necessitated by differences in program objectives. However, participants agreed that where programs have identified similar data needs, the use of common methods is beneficial. Opportunities discussed for improving data compatibility and information sharing included (1) modifying existing methods, (2) adding parameters, (3) improving access to data through shared databases (potentially with common database structures), and (4) future collaborative efforts that range from research on selected protocol questions to followup meetings and continued discussions.

Open-File Report

Assessing environmental contaminant threats to lands and biota managed by the U.S. Fish and Wildlife Service

The Contaminant Assessment Process (CAP) is a standardized approach for documenting and assessing threats posed by environmental contaminants to lands and biota managed by the Department of the Interior (DOI). The Biomonitoring of Environmental Status and Trends (BEST) Program of the U.S. Geological Survey Biological Resources Division (USGS/BRD) developed the CAP cooperatively with the U.S. Fish and Wildlife Service's (FWS) Division of Environmental Contaminants (DEC). The CAP involves two parts, a retrospective analysis, and if needed, field-sampling. The retrospective analysis documents the ecological characteristics, management goals, areas potentially vulnerable to hazardous substance spills, and habitats of importance for the DOI land unit of interest. In addition, contaminant transport pathways and sources (point and nonpoint) are identified and potentially contaminated areas delineated. The second part of the CAP involves developing field-sampling plans to confirm the presence or effects of contaminants identified in the retrospective analysis. Field-sampling deemed necessary to confirm contaminant issues on national wildlife refuges identified through the retrospective analyses of CAP is handled as part of DECs on- and off-refuge investigation programs. By gathering and interpreting information, the CAP generates valuable insight regarding contaminant issues that may be affecting refuges. Findings from the CAP can help FWS stewards select options that reduce contaminant impacts on the habitats and species that they manage. Information synthesized through the CAP also contributes to the development of Comprehensive Conservation Plans mandated through the National Wildlife Refuge System Improvement Act of 1997. To insure that this information has the maximum benefit to the agency, DEC and the BEST Program jointly developed a data management system to support the CAP. This system facilitates information acquisition from remote sources and serves as a permanent data repository. Thus, the system documents CAP findings, enhances FWS's institutional memory, and supports informed management decisions. This document is a user's guide, intended for use by FWS field biologists responsible for applying the retrospective analysis portion of the CAP to FWS national wildlife refuge lands and provides instructions for entering information into the data management system. This is the third revision of the original document written in 1993 by scientists of the Idaho National Engineering and Environmental Laboratory.

Open-File Report

U.S. Geological Survey programs in Florida, 1999

The safety, health, and economic well-being of Florida?s citizens are important to the U.S. Geological Survey (USGS), which is involved in water-related, geologic, biological, land use, and mapping issues in many parts of the State. The USGS office in Tallahassee acts as the liaison for all studies conducted by USGS scientists in Florida. Water resources activities are conducted not only from the office in Tallahassee, but also from offices in Miami, Tampa, and Altamonte Springs (Orlando). Scientists in these offices investigate surface water, ground water and water quality in Florida, working in cooperation with other Federal, State and local agencies and organizations. The USGS Center for Coastal Geology and Regional Marine Studies was established in St. Petersburg in 1988, in cooperation with the University of South Florida. The Center conducts a wide variety of research on mineral resources and on coastal and regional marine problems, including coastal erosion, climate change, wetlands deterioration, and coastal pollution. A USGS mapping office is located in St. Petersburg. Also, the Earth Science Information Center (ESIC) in Tallahassee provides USGS information to customers and directs inquiries to the appropriate USGS office or State agency on earth science topics, particularly those related to cartography, geography, aerial photography, and digital data. Biologists at the USGS Florida Caribbean Science Center, located in Gainesville, conduct biological and ecosystem studies in Florida, Puerto Rico, and the Virgin Islands.

Florida

Simulation of hydraulic characteristics in the white sturgeon spawning habitat of the Kootenai River near Bonners Ferry, Idaho

Hydraulic characterization of the Kootenai River, especially in the white sturgeon spawning habitat reach, is needed by the Kootenai River White Sturgeon Recovery Team to promote hydraulic conditions that improve spawning conditions for the white sturgeon (Acipenser transmontanus) in the Kootenai River. The decreasing population and spawning failure of white sturgeon has led to much concern. Few wild juvenile sturgeons are found in the river today. Determining the location of the transition between backwater and free-flowing water in the Kootenai River is a primary focus for biologists who believe that hydraulic changes at the transition affect the location where the sturgeon choose to spawn. The Kootenai River begins in British Columbia, Canada, and flows through Montana, Idaho, and back into British Columbia. The 65.6-mile reach of the Kootenai River in Idaho was studied. The study area encompasses the white sturgeon spawning reach that has been designated as a critical habitat. A one-dimensional hydraulic-flow model of the study reach was developed, calibrated, and used to develop relations between hydraulic characteristics and water-surface elevation, discharge, velocity, and backwater extent. The model used 164 cross sections, most of which came from a previous river survey conducted in 2002-03. The model was calibrated to water-surface elevations at specific discharges at five gaging stations. Calibrated water-surface elevations ranged from about 1,743 to about 1,759 feet, and discharges used in calibration ranged from 5,000 to 47,500 cubic feet per second. Model calibration was considered acceptable when the difference between measured and simulated water-surface elevations was ?0.15 foot or less. Measured and simulated average velocities also were compared. These comparisons indicated agreement between measured and simulated values. The location of the transition between backwater and free-flowing water was determined using the calibrated model. The model was used to simulate hydraulic characteristics for a range of water-surface elevations from 1,741 to 1,762 feet and discharges from 4,000 to 75,000 cubic feet per second. These simulated hydraulic characteristics were used to develop a three-parameter relation-discharge in the study reach, water-surface elevation at Kootenai River at Porthill gaging station (12322000), and the location of the transition between backwater and free-flowing water. Simulated hydraulic characteristics produced backwater locations ranging from river mile (RM) 105.6 (Porthill) to RM 158 (near Crossport), a span of about 52 miles. However, backwater locations from measured data ranged primarily from RM 152 to RM 157, a 5-mile span. The average backwater location from measured data was at about RM 154. Three-parameter relations also were developed for determining the amount of discharge in the Shorty Island side channel and average velocity at selected cross sections in the study reach. Simulated discharge for the side channel relative to measured data ranged from 0 to about 5,500 cubic feet per second, and simulated average velocity relative to measured data ranged from 0 to about 3.5 feet per second. Relations using other hydraulic, sediment/incipient motion, ecological, and biological characteristics also could be developed. The relations also can be used in real time by accessing data from the Web. Discharge and stage data for two gaging stations, Tribal Hatchery (12310100) and Porthill (12322500), are available from the Idaho U.S. Geological Survey web page (URL: http://waterdata.usgs.gov/id/nwis/current/?type=flow). Because the coordinate axes of the three-parameter relations use discharge from the Tribal Hatchery gaging station and water-surface elevation from the Porthill gaging station, the location of the transition between backwater and free-flowing water can be determined for current conditions using the real-time data. Similarly, discharge in the Shorty Island side channel and (or) average velocity at selected cross sections also can be determined for current conditions.

British Columbia;Idaho;Montana

Simulation of flow and sediment mobility using a multidimensional flow model for the White Sturgeon critical-habitat reach, Kootenai River near Bonners Ferry, Idaho

In 1994, the Kootenai River white sturgeon (Acipenser transmontanus) was listed as an Endangered Species as a direct result of two related observations. First, biologists observed that the white sturgeon population in the Kootenai River was declining. Second, they observed a decline in recruitment of juvenile sturgeon beginning in the 1950s with an almost total absence of recruitment since 1974, following the closure of Libby Dam in 1972. This second observation was attributed to changes in spawning and (or) rearing habitat resulting from alterations in the physical habitat, including flow regime, sediment-transport regime, and bed morphology of the river. The Kootenai River White Sturgeon Recovery Team was established to find and implement ways to improve spawning and rearing habitat used by white sturgeon. They identified the need to develop and apply a multidimensional flow model to certain reaches of the river to quantify physical habitat in a spatially distributed manner. The U.S. Geological Survey has addressed these needs by developing, calibrating, and validating a multidimensional flow model used to simulate streamflow and sediment mobility in the white sturgeon critical-habitat reach of the Kootenai River. This report describes the model and limitations, presents the results of a few simple simulations, and demonstrates how the model can be used to link physical characteristics of streamflow to biological or other habitat data. This study was conducted in cooperation with the Kootenai Tribe of Idaho along a 23-kilometer reach of the Kootenai River, including the white sturgeon spawning reach near Bonners Ferry, Idaho that is about 108 to 131 kilometers below Libby Dam. U.S. Geological Survey's MultiDimensional Surface-Water Modeling System was used to construct a flow model for the critical-habitat reach of the Kootenai River white sturgeon, between river kilometers 228.4 and 245.9. Given streamflow, bed roughness, and downstream water-surface elevation, the model computes the velocity field, water-surface elevations, and boundary shear stress throughout the modeled reach. The 17.5 kilometer model reach was subdivided into two segments on the basis of predominant grain size: a straight reach with a sand, gravel, and cobble substrate located between the upstream model boundary at river kilometer 245.9 and the upstream end of Ambush Rock at river kilometer 244.6, and a meandering reach with a predominately sand substrate located between upstream end of Ambush Rock and the downstream model boundary at river kilometer 228.4. Model cell size in the x and y (horizontal) dimensions is 5 meters by 5 meters along the computational grid centerline with 15 nodes in the z (vertical) dimension. The model was calibrated to historical streamflows evenly distributed between 141.6 and 2,548.9 cubic meters per second. The model was validated by comparing simulated velocities with velocities measured at 15 cross sections during steady streamflow. These 15 cross sections were each measured multiple (7-13) times to obtain velocities suitable for comparison to the model results. Comparison of modeled and measured velocities suggests that the model does a good job of reproducing flow patterns in the river, although some discrepancies were noted. The model was used to simulate water-surface elevation, depth, velocity, bed shear stress, and sediment mobility for Kootenai River streamflows of 170, 566, 1,130, 1,700, and 2,270 cubic meters per second (6,000, 20,000, 40,000, 60,000, and 80,000 cubic feet per second). The three lowest streamflow simulations represent a range of typical river conditions before and since the construction of Libby Dam, and the highest streamflow simulation (2,270 cubic meters per second) is approximately equal to the annual median peak streamflow prior to emplacement of Libby Dam in 1972. Streamflow greater than 566 cubic meters per second were incrementally increased by 570 cubic meters per second. For each

Scientific Investigations Report

Characterization of geomorphic units in the alluvial valleys and channels of Gulf Coastal Plain rivers in Texas, with examples from the Brazos, Sabine, and Trinity Rivers, 2010

The U.S. Geological Survey, in cooperation with the Texas Water Development Board, described and characterized examples of geomorphic units within the channels and alluvial valleys of Texas Gulf Coastal Plain rivers using a geomorphic unit classification scale that differentiates geomorphic units on the basis of their location either outside or inside the river channel. The geomorphic properties of a river system determine the distribution and type of potential habitat both within and adjacent to the channel. This report characterizes the geomorphic units contained in the river channels and alluvial valleys of Texas Gulf Coastal Plain rivers in the context of the River Styles framework. This report is intended to help Texas Instream Flow Program practitioners, river managers, ecologists and biologists, and others interested in the geomorphology and the physical processes of the rivers of the Texas Gulf Coastal Plain (1) gain insights into how geomorphic units develop and adjust spatially and temporally, and (2) be able to recognize common geomorphic units from the examples cataloged in this report. Recent aerial imagery (high-resolution digital orthoimagery) collected in 2008 and 2009 were inspected by using geographic information system software to identify representative examples of the types of geomorphic units that occurred in the study area. Geomorphic units outside the channels of Texas Gulf Coastal Plain rivers are called \"valley geomorphic units\" in this report. Valley geomorphic units for the Texas Gulf Coastal Plain rivers described in this report are terraces, flood plains, crevasses and crevasse splays, flood-plain depressions, tie channels, tributaries, paleochannels, anabranches, distributaries, natural levees, neck cutoffs, oxbow lakes, and constructed channels. Channel geomorphic units occur in the river channel and are subject to frequent stresses associated with flowing water and sediment transport; they adjust (change) relatively quickly in response to short-term variations in flow. Channel geomorphic units described in this report are channel banks, benches and ledges, bank failures, point bars, cross-bar channels, channel bars, exposed bedrock, pools, runs, and crossovers.

Texas

Montana StreamStats—A method for retrieving basin and streamflow characteristics in Montana: Chapter A in Montana StreamStats

The U.S. Geological Survey (USGS) provides streamflow characteristics and other related information needed by water-resource managers to protect people and property from floods, plan and manage water-resource activities, and protect water quality. Streamflow characteristics provided by the USGS, such as peak-flow and low-flow frequencies for streamflow-gaging stations, are frequently used by engineers, flood forecasters, land managers, biologists, and others to guide their everyday decisions. In addition to providing streamflow characteristics at streamflow-gaging stations, the USGS also develops regional regression equations and drainage area-adjustment methods for estimating streamflow characteristics at locations on ungaged streams. Regional regression equations can be complex and often require users to determine several basin characteristics, which are physical and climatic characteristics of the stream and its drainage basin. Obtaining these basin characteristics for streamflow-gaging stations and ungaged sites traditionally has been time consuming and subjective, and led to inconsistent results. StreamStats is a Web-based geographic information system application that was created by the USGS to provide users with access to an assortment of analytical tools that are useful for water-resource planning and management. StreamStats allows users to easily obtain streamflow and basin characteristics for USGS streamflow-gaging stations and user-selected locations on ungaged streams. The USGS, in cooperation with Montana Department of Transportation, Montana Department of Environmental Quality, and Montana Department of Natural Resources and Conservation, completed a study to develop a StreamStats application for Montana, compute streamflow characteristics at streamflow-gaging stations, and develop regional regression equations to estimate streamflow characteristics at ungaged sites. Chapter A of this Scientific Investigations Report describes the Montana StreamStats application and the datasets, streamflow-gaging stations, streamflow characteristics, and regression equations (as described fully in Chapters B through G of this report) that are used for development of the StreamStats application for Montana.

Montana