Geology ReportsSearch

USGS · 70043640

Proceedings of the 2011 Elwha River Science Symposium

Abstract

After years of anticipation, volumes of Environmental Impact Statements, multiple mitigation projects, and the multidisciplinary collection of predam removal data, the deconstruction phase of the Elwha River restoration officially began on September 17th, 2011. With their simultaneous decommissioning, the removal of the 64 m tall Glines Canyon Dam and the 33 m tall Elwha Dam represents one of the largest such projects of its kind in North America. It’s also an excellent opportunity to study large-scale ecosystem restoration, as the majority of the reconnected habitat that will become available to recolonizing salmon occurs in the protected wilderness areas of Olympic National Park. As part of a week-long series of ‘Celebrate Elwha’ events, which culminated with a moving ceremony commemorating the official launch of dam removal, I was proud to work with a number of dedicated people, listed below, to organize the two day 2011 Elwha River Science Symposium. Many of the scientists working on the Elwha project have regularly met, since around 2004, for annual meetings. Loosely organized under the auspices of the Elwha Research and Elwha Nearshore consortia, the annual meetings have been informative for many reasons, including the sharing of study plans, field schedules, and preliminary results. It has been a great way for groups of physical scientists and groups of biologists to learn about the questions of interest to each group and to explore areas of overlap. In some cases, these meetings have spawned new collaborations, synergies, and research directions. In planning for the 2011 Elwha River Science Symposium, we sought to retain this espirit de corps, but realized that the start of dam removal heralded an important new phase of the project and called for an event that celebrated this special occasion.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 47.51745573499318° to 48.136488877992974° latitude; -123.68396159504877° to -123.45° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

2011. Proceedings of the 2011 Elwha River Science Symposium. https://pubs.usgs.gov/publication/70043640

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Factors affecting benthic macroinvertebrate health in the City of Roanoke, Virginia, 2020–2023

Major waterways in the City of Roanoke (City) have failed to meet Virginia’s aquatic life designated use since 1996. Segments of the upper Roanoke River lack healthy benthic macroinvertebrate communities which prompted a total maximum daily load (TMDL) study by the Virginia Department of Environmental Quality (VDEQ) to identify the most probable stressor(s) causing the impairment. Excess fine sediment was identified as the most probable stressor impairing benthic macroinvertebrates on portions of the Roanoke River in 2006, and a watershed implementation plan published in 2016 required communities within the impaired watershed to implement projects that would reduce the load of fine sediment entering the Roanoke River. Additional benthic macroinvertebrate sampling and stream habitat assessments along the Roanoke River and Tinker Creek (a tributary to the Roanoke River that flows through the City) revealed continued impaired conditions, and subsequent stressor identification analysis was completed in 2023. Samples collected downstream of the City on the Roanoke River and Tinker Creek generally showed more impaired conditions relative to samples collected at locations upstream of the City. Based on this evaluation, sediment and sediment-bound polychlorinated biphenyls (PCBs) were identified as probable stressors while specific conductance, total nitrogen, and sediment metals were possible stressors in Tinker Creek; however, only a sediment TMDL target was identified to address impaired benthic macroinvertebrate communities. In the Roanoke River upstream of the Niagara Dam, sediment and total phosphorus were identified as probable stressors, sediment polycyclic aromatic hydrocarbons and sediment PCB were considered possible stressors; however, the TMDL target was only for total phosphorus. The City partnered with the U.S. Geological Survey (USGS) in 2016 to continuously monitor water quality and streamflow conditions on a major tributary of Tinker Creek, Lick Run, and by 2020, four similar monitoring stations were installed on the Roanoke River and Tinker Creek near the locations of benthic macroinvertebrate sampling. Monitored parameters included streamflow and/or gage height (water level), water temperature, pH, dissolved oxygen, specific conductance, and turbidity. Turbidity is a measure of the relative clarity of the water and was previously used to model suspended-sediment concentrations at the monitoring stations. The City also contracted Kirk Environmental, LLP (KE) to collect benthic macroinvertebrate samples and stream habitat assessments near the locations of the water-quality monitoring stations. Identified benthic macroinvertebrates were used to calculate the Virginia Stream Condition Index (SCI), a multi-metric index composed of eight biological attributes that represent elements of the structure and function of the benthic macroinvertebrate community that measure diversity, composition, and tolerance to pollution. Study objective: In this report, benthic macroinvertebrate samples and stream habitat assessment scores collected at four locations on the Roanoke River and Tinker Creek by KE and the VDEQ between 2020 and 2023 were compared to measured water-quality and streamflow conditions prior to sampling to evaluate patterns between benthic macroinvertebrate health, water quality, and hydrology.

Virginia