Geology Reports⌕ Search

Geology topics

Research about Elwha River

Source-linked reports with geographic coverage including Elwha River.

At least 19 recordsLinked to original sources

Cultural benefits knowledge and social learning in Elwha River dam removal and ecosystem decision-making

In a retrospective case study of the seminal Elwha River dam removal in Washington State, USA, we explore pathways through which ecosystem services (ES) knowledge can inform environmental decision-making. We specifically investigate how knowledge of cultural benefits linked to the Elwha River ecosystem was made available. Through interviews and historical document review we identify diverse forms of cultural benefits knowledge (i.e., how individuals or groups know the contributions of an ecosystem to their identities, experiences, and capabilities), including both knowledge in the form of practices – embodied or enacted forms of knowledge, and knowledge in the form of products – quantitative or written documentation. Recognizing and learning from the diverse forms in which benefits knowledges are conveyed can support more accurate and equitable consideration of the diverse values, well-beings, and human-nature relationships linked to ecosystems. With this case study, we illuminate pathways for meaningful consideration of multiple knowledge forms, and the plural ecosystem values they convey, with relevance for environmental decision processes in the Puget Sound and beyond.

Washington↗

The Benefits Knowledges Learning Framework: A tool for learning across diverse knowledge systems in ecosystem valuation

Sustainable and just environmental management depends on meaningful consideration of the plural values of nature, as they arise in association with diverse worldviews and understandings of well-being. To achieve value pluralism in decision-making, we must also attend to knowledge pluralism, in terms of recognizing the validity and decision relevance of a broader suite of knowledge forms that convey diverse understandings of well-being and benefit. In this article, we outline a social learning tool – the Benefits Knowledges Learning Framework – that supports expanded thinking about decision-relevant, actionable knowledge, and the associated spectrum of available opportunities to learn from these diverse knowledge forms across phases of decision-making. It does so through: 1) cultivation of reflexivity and mutual learning about the knowledge systems of diverse actors involved in the decision process; 2) identification of diverse benefits knowledge forms that are available to inform decision-making; and 3) identification of opportunities to learn from these knowledge forms. Diverse forms of benefits knowledge include both knowledge products (documentation) and knowledge practices (lived and embodied). The framework can be applied to retrospective case analysis to understand and learn from constraints and enabling factors in past decision processes. It can also be applied to assess on-going decision-making and identify current opportunities for improvement. The framework begins with a start-up phase that encourages those applying the framework to address any concerns raised by stakeholders and rightsholders and determine whether framework application is appropriate in a particular context.

Washington↗

Decadal-scale effects of a dam removal on channel geomorphology, sediment and large wood on the Elwha River, Washington, USA

The removal of Glines Canyon Dam on the Elwha River in western Washington, USA, from 2011 to 2014 introduced a 20-Mt pulse of stored sediment and logs into the downstream channel. We used terrestrial laser scanning, high-resolution orthoimages, and surveys of large wood (LW) and sediment grain-size distribution to quantify changes to the channel and LW in four different geomorphic settings spanning a 16-year period before, during, and after dam removal. The results provide insights into the role of site-specific geomorphology on the interplay among sediment size and supply, wood, and channel form in the aftermath of a dam removal. Sediment-size distribution, braiding index, and number of log jams rapidly reached new steady states. Other factors, such as channel sinuosity and log jam area, were still evolving six years after the dam was removed. The rate and type of river response was partially dictated by the geomorphic setting and the accumulation of LW. Complex reaches trapped more sediment and LW, initiating immediate changes in the channel count, position and lateral migration that continued to evolve through positive feedbacks. Single-channel sites experienced less initial erosion and deposition, but channel migration continued for years once it was underway. The post-dam sediment composition progressively shifted to a mixed size distribution midway between the armored cobbles when the dam was in place and the influx of primarily sand and fine gravel during dam removal. Reworking of sediment was most rapid in the first year after dam removal, especially at the site with the greatest channel complexity. The relation between log jams and channel divisions fundamentally changed. There were 11 log jams in the middle reach of the Elwha River downstream of Glines Canyon Dam, and all log jams associated with channel divisions occurred at the heads of stable, vegetated islands. During dam removal, the number of log jams rapidly increased to 86 and stabilized near that level in the post-dam period. While log jams on stable islands persisted, more were added at divisions around transient sediment bars, scattered across gravel bars, or outside of the active channel. Following a brief spike during dam removal, there was a net long-term increase of ∼10 % in the number of channel divisions associated with log jams. The sediment deposits, LW, vegetation, channel morphology and river discharge continued to cause adjustments within the fluvial system a decade after the start of dam removal. This state of greater variability could be the new equilibrium for years to come.

Washington↗

Remote sensing large-wood storage downstream of reservoirs during and after dam removal: Elwha River, Washington, USA

Large wood is an integral part of many rivers, often defining river-corridor morphology and habitat, but its occurrence, magnitude, and evolution in a river system are much less well understood than the sedimentary and hydraulic components, and due to methodological limitations, have seldom previously been mapped in substantial detail. We present a new method for this, representing a substantial advance in automated deep-learning-based image segmentation. From these maps, we measured large wood and sediment deposits from high-resolution orthoimages to explore the dynamics of large wood in two reaches of the Elwha River, Washington, USA, between 2012 and 2017 as it adjusted to upstream dam removals. The data set consists of a time series of orthoimages (12.5-cm resolution) constructed using Structure-from-Motion photogrammetry on imagery from 14 aerial surveys. Model training was optimized to yield maximum accuracy for estimated wood areas, compared to manually digitized wood, therefore model development and intended application were coupled. These fully reproducible methods and model resulted in a maximum of 15% error between observed and estimated total wood areas and wood deposit size-distributions over the full spatio-temporal extent of the data. Areal extent of wood in the channel margin approximately doubled in the years following dam removal, with greatest increases in large wood in wider, lower-gradient sections. Large-wood deposition increased between the start of dam removal (2011) and winter 2013, then plateaued. Sediment bars continued to grow up until 2016/17, assisted by a partially static wood framework deposited predominantly during the period up to winter 2013.

Washington↗

Challenges of implementing a multi-agency monitoring and adaptive management strategy for federally threatened Chinook salmon and steelhead trout during and after dam removal in the Elwha River

Adaptive management, a process of planning, implementing, and evaluating management strategies, is often recommended for monitoring ecological systems. However, few examples of successful implementation and retrospective case studies exist. We provide a case study of adaptively managing hatchery-assisted protection and recovery for Chinook salmon ( Oncorhynchus tshawytscha ) and winter steelhead trout ( O. mykiss ) during and after the removal of two large mainstem dams in the Elwha River, WA. We summarize key aspects of the monitoring and adaptive management plan over the last decade and highlight successes, challenges, and complications during the plan’s implementation. The Elwha Monitoring and Adaptive Management Guidelines included a trigger-based system for moving through four phases of recovery that included preservation, recolonization, local adaptation, and viable natural population, each with differing levels of hatchery production as the management actions. The monitoring component of the plan has been very successful, providing critical data to guide management actions that otherwise may not have occurred and, opportunistically, provided data for other native species in the Elwha River. Implementing adaptive management provided mixed results and was at times hindered by divergent management goals among project partners, the inflexibility of the Endangered Species Act regulatory requirements as implemented for this project, and conflicting information among guidance documents. We learned that some metrics and triggers in the plan were ill-defined or too difficult to measure in the field. In some cases, the performance indicators and/or triggers were successfully modified to incorporate what was learned; however, in other cases, we were unable to revise the values due to differing opinions among partners. The ability to reach consensus on revised triggers appeared to be influenced by the recovery trajectory of the species involved. The implemented adaptive management strategy resulted in substantial collaboration and learning, which resulted in revised management strategies, but was imperfect. Sufficient long-term funding is necessary to implement a well-designed monitoring program and could benefit from including a defined leadership position to shepherd and facilitate a multi-stakeholder adaptive management program. Additionally, incorporating adaptive management into legally binding conditions under the Endangered Species Act is feasible, but requires substantial pre-planning in close coordination with regulatory agencies.

Washington↗

Establishment of terrestrial mammals on former reservoir beds following large dam removal on the Elwha River, Washington, USA

Terrestrial wildlife species are important yet often overlooked taxa in the recovery of ecosystems following dam removal. Their presence can shape ecosystem recovery, signal restoration of ecosystem function, and influence food web dynamics and nutrient transfer. We used camera traps to examine seasonal use of two former reservoir beds and an upstream reference reach by the mammalian community following the removal of two large dams on the Elwha River, Washington, USA. For certain taxa, we compared current species use to data collected prior to dam removal. Camera traps revealed use by at least fifteen mammal species, including but not limited to American black bear ( Ursus americanus ), Columbian black-tailed deer ( Odocoileus hemionus columbianus ), Roosevelt elk ( Cervus elaphus roosevelti ), puma ( Puma concolor ), coyotes ( Canis latrans ), bobcats ( Lynx rufus ), and snowshoe hares ( Lepus americanus ). Coyotes were found mostly lower in the watershed outside the Olympic National Park boundary, while other species were distributed throughout the restoration area. We did not see major differences in species composition between the restoration areas and the upstream reference reach, though number of detections across study reaches differed for most species. Unlike previous findings, black bears were observed across all seasons in this study, suggesting a shift in seasonal use since dam removal. Full restoration of the terrestrial wildlife community could take decades to unfold, but early patterns demonstrate rapid establishment and use by wildlife on new riparian surfaces that are expected to continue to evolve with restoration of fish and vegetation communities.

Washingotn↗

Vegetation responses to large dam removal on the Elwha River, Washington, USA

Large dam removal can trigger changes to physical and biological processes that influence vegetation dynamics in former reservoirs, along river corridors downstream of former dams, and at a river’s terminus in deltas and estuaries. We present the first comprehensive review of vegetation response to major fluvial disturbance caused by the world’s largest dam removal. After being in place for nearly a century, two large dams were removed along the Elwha River, Washington, USA, between 2011 and 2014. The exposure, erosion, transport, and deposition of large volumes of sediment and large wood that were impounded behind the dams created new fluvial surfaces where plant colonization and growth have occurred. In the former reservoirs, dam removal exposed ~290 ha of unvegetated sediment distributed on three main landforms: valley walls, high terraces, and dynamic floodplains. In addition to natural revegetation in the former reservoirs, weed control and seeding and planting of desirable plants influenced vegetation trajectories. In early years following dam removal, ~20.5 Mt of trapped sediment were eroded from the former reservoirs and transported downstream. This sediment pulse, in combination with transport of large wood, led to channel widening, an increase in gravel bars, and floodplain deposition. The primary vegetation responses along the river corridor were a reduction in vegetated area associated with channel widening, plant establishment on new gravel bars, increased hydrochory, and altered plant community composition on gravel bars and floodplains. Plant species diversity increased in some river segments. In the delta, sediment deposition led to the creation of ~26.8 ha of new land surfaces and altered the distribution and dynamics of intertidal water bodies. Vegetation colonized ~16.4 ha of new surfaces: mixed pioneer vegetation colonized supratidal beach, river bars, and river mouth bars, and emergent marsh vegetation colonized intertidal aquatic habitats. In addition to the sediment-dominated processes that have created opportunities for plant colonization and growth, biological processes such as restored hydrochory and anadromous fish passage with associated delivery of marine-derived nutrients may influence vegetation dynamics over time. Rapid changes to landforms and vegetation growth were related to the large sediment pulse in the early years following dam removal, and the rate of change is expected to attenuate as the system adjusts to natural flow and sediment regimes.

Washington↗

A review of natural and managed revegetation responses in two de-watered reservoirs after large dam removals on the Elwha River, Washington, USA

Large dam removals are increasing in frequency and the response of natural and managed revegetation is a critical consideration for managed restoration of dewatered reservoir landscapes post dam removal. The removal of two large dams on the Elwha River in 2011-2014 provides insight into reservoir revegetation. We review literature and datasets from 2012 through 2018, 1-6 years since reservoir dewatering, to compare pre-dam removal predictions on the Elwha to post-dam removal of natural revegetation, managed revegetation effects and invasive non-native vegetation response. Pre-dam removal hypotheses about natural revegetation did not predict species performance on reservoir sediments, seed rain patterns, or seed bank response. Sediment texture and landform affected multiple aspects of revegetation, including vegetation cover, species richness, woody stem densities and species composition. Reservoir drawdown timing influenced species composition and seedling densities. Predictions about managed revegetation effects were mixed. Planting trees and shrubs did not accelerate woody cover but did increase species richness. Seeding reduced non-native vegetation frequency and species richness, had no effect on vegetation cover on fine sediments, but increased vegetation cover on coarse sediments. Planting trees and shrubs during drawdown appeared to result in higher survival rates compared to plantings installed 1+ years post drawdown. Seeding Lupinus rivularis (riverbank lupine) on coarse sediments was successful and increased foliar nitrogen in planted conifers. Invasive non-native vegetation was correctly predicted to be more abundant in the Aldwell reservoir but did not preclude native species establishment in either reservoir, likely due to rapid establishment of native species and robust management that occurred before, during and after dam removal.

Washington↗

Coastal vegetation responses to large dam removal on the Elwha River

Introduction: Large dam removals provide a restoration opportunity for shrinking coastal wetland habitats. Dam removal can increase sediment delivery to sediment-starved river deltas and estuaries by restoring natural sediment transport and mobilizing reservoir-impounded sediment. However, rapid mobilization of massive quantities of sediment stored behind large dams also constitutes a major ecological perturbation. Information is lacking on coastal habitat responses to sediment pulses of this magnitude. Methods: Removal of two large dams along the Elwha River (Washington, USA) in 2011–2014 released ~20.5 Mt of impounded sediment, ~5.4 Mt of which were deposited in the delta and estuary (hereafter, delta). We used time series of aerial imagery, digital elevation models, and vegetation field sampling to examine plant community responses to this sediment pulse across seven years during and after dam removal. Results: Between 2011 and 2018, the Elwha River delta increased by ~26.8 ha. Vegetation colonized ~16.4 ha of new surfaces, with mixed pioneer vegetation on supratidal beach, river bars, and river mouth bars and emergent marsh vegetation in intertidal aquatic habitats. Colonization occurred on surfaces that were higher and more stable in elevation and farther from the shoreline. Compared to established delta plant communities, vegetation on new surfaces had lower cover of dominant species and functional groups, with very low woody cover, and lower graminoid cover than dunegrass and emergent marsh communities. Over time following surface stabilization, however, vegetation on new surfaces increased in species richness, cover, and similarity to established communities. By 2018, ~1.0 ha of vegetation on new surfaces had developed into dunegrass or willow–alder communities and ~5.9 ha had developed into emergent marsh. At the same time, dam removal had few discernible effects on established delta plant communities. Discussion: Together, these results suggest that rapid sediment mobilization during large dam removal has potential to expand coastal wetland habitat without negatively affecting established plant communities. However, as sediment loads declined in 2016–2018, new delta surfaces decreased by ~4.5 ha, and ~1.6 ha of new vegetation reverted to no vegetation. Long-term persistence of the expanded coastal habitat will depend on ongoing erosional and depositional processes under the restored natural sediment regime.

Washington↗

Lessons learned from community and citizen science monitoring projects on the Elwha River Restoration Project

Community and citizen science (CCS) projects – initiatives that involve public participation in scientific research – can both sustain and expand long-term monitoring of large dam removal projects. In this article, we discuss our perspectives on CCS associated with the Elwha River dam removals. We summarize how the public has been or could be involved in monitoring and distill lessons learned for other large dam removal projects. Much of the Elwha monitoring involved technical field work requiring training and incurring potential liability risks, guiding projects towards smaller-scale public involvement. Partnering with organizations that have capacity for volunteer management expanded CCS opportunities and provided logistical support to project managers committed to public engagement. We found that many projects engaged with students and/or with paid or unpaid interns; compensating participants in various ways can help to create reciprocal relationships that support long-term monitoring. In the future, other large dam removals could consider planning ahead for community involvement in dam removal monitoring to accommodate the technical and potentially hazardous nature of the work – broadening who may be able to participate. In addition, involving community members in setting research agendas could be an important first step in engaging them in long-term monitoring, in turn facilitating multi-generational research at the timescale of landscape-level changes. Finally, explicit relationship-building with Indigenous communities can enhance the benefits of community engagement in dam removal science for all involved.

Washington↗

Nearshore subtidal community response during and after sediment disturbance associated with dam removal

Dam removal is used increasingly to restore aquatic ecosystems and remove unnecessary or high-risk infrastructure. As the number of removals increases, there is a growing understanding about the hydrologic, geomorphic, and ecological responses to these removals. Most dam removal studies, however, focus on river and watershed responses to dam removal. The removal of two dams on the Elwha River provided a unique opportunity to characterize the response of nearshore (coastal) ecosystems. We conducted SCUBA surveys between 2011 and 2022 to quantify trajectories of change in a nearshore ecosystem during and after dam removal. We focused on the degree to which the abundances of kelp, benthic invertebrates, and fish changed in response to patterns of sediment fluxes during and after dam removal. Our findings point to two pathways of response depending on the disturbance mechanism and species type. Sites with persistent sediment deposition were characterized by wholesale community changes that did not recover to a before dam removal condition. Instead, the sites were colonized by new species that were largely absent prior to dam removal. Sites that experienced high turbidity but lacked persistent seafloor deposition were primarily characterized by a reduction in the abundance of kelp and other algae during dam removal and a rapid recovery after sediment flux to the nearshore declined. Dam removal influences on invertebrates and fish at these sites were more variable, benefiting some species and disadvantaging others. In addition to dam removal, sea star wasting syndrome and a marine heatwave exerted distinct controls on subtidal communities during the same period. The loss of the predatory sea star Pycnopodia helianthoides was associated with gains in some of its prey species, and kelp community changes reflected regional trends in ocean temperature and kelp abundance. The results presented here have important implications for understanding the response of marine ecosystems to future dam removals and similar sediment perturbation events.

Washington↗

Community and citizen science on the Elwha River: Past, present, and future

This report reflects on the past, present, and potential future of community and citizen science (CCS) in the Elwha River watershed, with particular focus on the years before and after a major restoration event: the removal of two dams that had impacted the river system for a century. We ask: how does CCS feature in the Elwha story and how could it feature? We use the term CCS to reference the broad range of ways in which members of the public might participate in authentic science and monitoring processes, including students and both paid and unpaid interns: participants are individuals contributing to scientific projects without prior formal training in the topic. Removal of the Elwha dams was a large-scale, complex project, and communities had an important role to play: the Lower Elwha Klallam Tribe (LEKT) and other local groups were a large part of the original drive to remove the dams. Some funding and policy requirements for monitoring are ending, but there is still much to learn from the changes happening in the Elwha, requiring ongoing research and monitoring. In 2022, the Elwha scientific community came together in a multifaceted effort called the “Elwha ScienceScape” to mark the ten-year anniversary of dam removal and to plan for future monitoring. One of ScienceScape’s priorities is expanding CCS efforts, and because the Elwha dam removal is a powerful international symbol of large-scale watershed restoration, ScienceScape is well-positioned to inform and emphasize the potential role of CCS in dam removal worldwide. This report presents insights about Elwha CCS from an academic literature review and discussions with scientists and many others that have been working in the Elwha. We found that the history of CCS on the Elwha is important but understated, with few scientific papers acknowledging support by volunteers of various kinds. Recent and ongoing CCS projects on the Elwha tend to be focused on biological phenomena, and most are associated with educational opportunities (across many types of institutions) and paid internships. We also noted that most Elwha CCS projects required volunteers with particular pre-existing skill sets (e.g., botanical knowledge) or time to impart specialized training (e.g. boat use), leading many projects towards engagement with a smaller number of volunteers. Partners working in the Elwha are considering a wide range of potential new CCS projects, and these ideas are in varying stages of development. Many new projects would broaden public involvement in terms of the opportunities available and increase the variety of focal topics for research and monitoring. This increased breadth is promising: there are indications that the local community’s interests also range widely, from fish recovery after dam removal to dam removal impacts on humans. Elwha CCS projects have encountered some challenges and barriers, including the administrative burden of coordinating volunteers and managing liability concerns. But Elwha ScienceScape scientists are committed to the value that CCS brings both to the research itself as well as to those who participate in these projects. CCS can be a way to increase equity in science and engage people who would not otherwise participate in research, and in many cases the research simply wouldn’t be possible without their help. Support with project administration, volunteer management, and data management could help in expanding CCS efforts and broadening their inclusivity. More systematic tracking of CCS projects to assess how they contribute to research and to community and participant benefit could be helpful in establishing and maintaining a long-term CCS strategy in the Elwha.

Wshington↗

Impacts of suspended sediment on nearshore benthic light availability following dam removal in a small mountainous river:In situ observations and statistical modeling

The 2011–2014 removal of two dams from the Elwha River, WA, delivered ~ 19 Mt of sediment to the marine environment, creating an opportunity to study the sensitivity of a coastal ecosystem to large-scale sediment input. Macroalgae, the primary habitat-forming species in the nearshore, disappeared from the region. It was hypothesized that this mortality event was caused by a reduction in benthic light availability due to increased turbidity. To investigate this connection, nearshore processes and benthic light availability were monitored at 7 locations along the 10-m isobath in 2016 and 2017. The primary driver of light attenuation was suspended sediment, with measured chlorophyll-a and CDOM concentrations contributing < 15% to observed attenuation values. A Bootstrap-aggregated Regression Tree was trained to predict attenuation from the in situ data. Light attenuation was impacted by both sediment transport in the river plume, represented in the model by fluvial suspended sediment load and tidal current direction, and subsurface resuspension, represented by wave height and bed shear velocity. The models were used to hindcast light availability during the dam removal. Total daily benthic light availability was below the 1–2 mol photons/m2/day threshold for macroalgae growth consistently in 2013 and seasonally in 2012 and 2014, supporting the hypothesis that reduced light availability caused the mortality event. Light availability increased in 2016–2017 as the annual sediment load decreased, and macroalgae were concurrently observed in the region. Predicting benthic light availability over event, tidal, and seasonal timescales by accounting for both near-surface and subsurface attenuation will improve management strategies designed to limit ecosystem damage during sediment delivery events.

Washington↗

Complexities, context, and new information about the Elwha River

Recently, Hand et al. (2018) discussed the socio- ecological complexities surround-ing natural resource policy, science, and management in the Columbia River Basin, using a case study of dam removal on the Elwha River in Washington State (WebFigure 1a). We feel compelled to provide additional historical context and correct some of the information provided by Hand et al. about the Elwha. The his-toric removals of the two Elwha River dams – a long- anticipated project that was decades in the making – have been touted by some as an environmental success story following the project’s completion in 2014. As with any complex endeavor, critical analyses and lessons learned continue to emerge, and will likely benefit future projects.

Washington↗

Geomorphic evolution of a gravel‐bed river under sediment‐starved vs. sediment‐rich conditions: River response to the world's largest dam removal

Understanding river response to sediment pulses is a fundamental problem in geomorphic process studies, with myriad implications for river management. However, because large sediment pulses are rare and usually unanticipated, they are seldom studied at field scale. We examine fluvial response to a massive (~20 Mt) sediment pulse released by the largest dam removal globally, on the Elwha River, Washington, United States, in an 11‐year before‐after/control‐impact study of channel morphology and grain size. We test the hypothesis that for a given flow magnitude, greater geomorphic change occurs under sediment‐rich conditions than under sediment‐starved conditions. Channel response to flow forcing was significantly different during the sediment‐pulse peak, 1–2 years after dam removal began, than earlier or later. During peak sediment supply our hypothesis was supported; major geomorphic change occurred under low flows and unit stream power ≤60 W/m 2 . However, by 4–6 years after dam removal began, rates of geomorphic change and sensitivity to stream power had decreased substantially such that our hypothesis was no longer unequivocally supported. These findings are consistent with a two‐phase conceptual model of dam‐removal response, involving a transport‐limited state followed by a more supply‐limited state. From comparisons with other dam removals and natural sediment pulses, we infer that the longevity of sediment‐pulse signals in gravel‐bed rivers depends upon gradient, river discharge, valley morphology, and sediment grain size. Stream power associated with substantial geomorphic change varies with sediment supply, such that assigning a general threshold stream power to gravel‐bed rivers may be untenable.

Washington↗

Coastal habitat and biological community response to dam removal on the Elwha River

Habitat diversity and heterogeneity play a fundamental role in structuring ecological communities. Dam emplacement and removal can fundamentally alter habitat characteristics, which in turn can affect associated biological communities. Beginning in the early 1900s, the Elwha and Glines Canyon dams in Washington, USA, withheld an estimated 30 million tonnes of sediment from river, coastal, and nearshore habitats. During the staged removal of these dams—the largest dam removal project in history—over 14 million tonnes of sediment were released from the former reservoirs. Our interdisciplinary study in coastal habitats—the first of its kind—shows how the physical changes to the river delta and estuary habitats during dam removal were linked to responses in biological communities. Sediment released during dam removal resulted in over a meter of sedimentation in the estuary and over 400 m of expansion of the river mouth delta landform. These changes increased the amount of supratidal and intertidal habitat, but also reduced the influx of seawater into the pre-removal estuary complex. The effects of these geomorphic and hydrologic changes cascaded to biological systems, reducing the abundance of macroinvertebrates and fish in the estuary and shifting community composition from brackish to freshwater-dominated species. Vegetation did not significantly change on the delta, but pioneer vegetation increased during dam removal, coinciding with the addition of newly available habitat. Understanding how coastal habitats respond to large-scale human stressors—and in some cases the removal of those stressors—is increasingly important as human uses and restoration activities increase in these habitats.

Washington↗

Ephemeral seafloor sedimentation during dam removal: Elwha River, Washington

The removal of the Elwha and Glines Canyon dams from the Elwha River in Washington, USA, resulted in the erosion and transport of over 10 million m 3 of sediment from the former reservoirs and into the river during the first two years of the dam removal process. Approximately 90% of this sediment was transported through the Elwha River and to the coast at the Strait of Juan de Fuca. To evaluate the benthic dynamics of increased sediment loading to the nearshore , we deployed a tripod system in ten meters of water to the east of the Elwha River mouth that included a profiling current meter and a camera system. With these data, we were able to document the frequency and duration of sedimentation and turbidity events, and correlate these events to physical oceanographic and river conditions. We found that seafloor sedimentation occurred regularly during the heaviest sediment loading from the river, but that this sedimentation was ephemeral and exhibited regular cycles of deposition and erosion caused by the strong tidal currents in the region. Understanding the frequency and duration of short-term sediment disturbance events is instrumental to interpreting the ecosystem-wide changes that are occurring in the nearshore habitats around the Elwha River delta.

Washington↗

Effects of dams and geomorphic context on riparian forests of the Elwha River, Washington

Understanding how dams affect the shifting habitat mosaic of river bottomlands is key for protecting the many ecological functions and related goods and services that riparian forests provide and for informing approaches to riparian ecosystem restoration. We examined the downstream effects of two large dams on patterns of forest composition, structure, and dynamics within different geomorphic contexts and compared them to upstream reference conditions along the Elwha River, Washington, USA. Patterns of riparian vegetation in river segments downstream of the dams were driven largely by channel and bottomland geomorphic responses to a dramatically reduced sediment supply. The river segment upstream of both dams was the most geomorphically dynamic, whereas the segment between the dams was the least dynamic due to substantial channel armoring, and the segment downstream of both dams was intermediate due to some local sediment supply. These geomorphic differences were linked to altered characteristics of the shifting habitat mosaic, including older forest age structure and fewer young Populus balsamifera subsp. trichocarpa stands in the relatively static segment between the dams compared to more extensive early-successional forests (dominated by Alnus rubra and Salix spp.) and pioneer seedling recruitment upstream of the dams. Species composition of later-successional forest communities varied among river segments as well, with greater Pseudotsuga menziesii and Tsuga heterophylla abundance upstream of both dams, Acer spp. abundance between the dams, and P. balsamifera subsp. trichocarpa and Thuja plicata abundance below both dams. Riparian forest responses to the recent removal of the two dams on the Elwha River will depend largely on channel and geomorphic adjustments to the release, transport, and deposition of the large volume of sediment formerly stored in the reservoirs, together with changes in large wood dynamics.

Washington↗