Individual-based models: The importance of variability among individuals
Abstract not supplied at this time
SEARCH · Geology Reports
Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not supplied at this time
The predictions from most forest ecosystem models originate from deterministic simulations. However, few evaluation exercises for model outputs are performed by either model developers or users. This issue has important consequences for decision makers using these models to develop natural resource management policies, as they cannot evaluate the extent to which predictions stemming from the simulation of alternative management scenarios may result in significant environmental or economic differences. Various numerical methods, such as sensitivity/uncertainty analyses, or bootstrap methods, may be used to evaluate models and the errors associated with their outputs. However, the application of each of these methods carries unique challenges which decision makers do not necessarily understand; guidance is required when interpreting the output generated from each model. This paper proposes a decision flow chart in the form of an analytical framework to help decision makers apply, in an orderly fashion, different steps involved in examining the model outputs. The analytical framework is discussed with regard to the definition of problems and objectives and includes the following topics: model selection, identification of alternatives, modelling tasks and selecting alternatives for developing policy or implementing management scenarios. Its application is illustrated using an on-going exercise in developing silvicultural guidelines for a forest management enterprise in Ontario, Canada.
The information provided here is intended to assist water-resources managers with interpretation of the U.S. Geological Survey (USGS) SPARROW model and its products. SPARROW models can be used to explain spatial patterns in monitored stream-water quality in relation to human activities and natural processes as defined by detailed geospatial information. Previous SPARROW applications have identified the sources and transport of nutrients in the Mississippi River basin, Chesapeake Bay watershed, and other major drainages of the United States. New SPARROW models with improved accuracy and interpretability are now being developed by the USGS National Water Quality Assessment (NAWQA) Program for six major regions of the conterminous United States. These new SPARROW models are based on updated geospatial data and stream-monitoring records from local, State, and other federal agencies.
Reliable quantitative information on sediment sources to rivers is critical to mitigate contamination and target conservation and restoration actions. However, the determination of the relative importance of sediment sources is complicated at the scale of large river basins by immense variability in erosional processes and sediment sources over space and time, heterogeneity in sediment transport and deposition, and a paucity of sediment monitoring data. Sediment source fingerprinting is an increasingly adopted field-based technique that identifies the nature and relative source contribution of sediment transported in waterways. Notably, sediment source fingerprinting provides information that is independent of other field, modeling, or remotely sensed techniques. However, the diversity in sediment fingerprinting sampling, analytical, and interpretive methods has been recognized as a problem in terms of developing standardized procedures for its application at the scale of large river basins. Accordingly, this review focuses on established sediment source fingerprinting studies conducted within the Mississippi River Basin (MRB), summarizes unique information provided by sediment source fingerprinting that is distinct from traditional monitoring techniques, evaluates consistency and reliability of methodological approaches among MRB studies, and provides prospects for the use of the sediment source fingerprinting technique as an aid to large-scale landscape conservation and restoration under current management frameworks. Most established MRB studies got creditable fingerprinting results and considered near-channel sources as the dominant sediment sources in most cases, while the comparability of their results suffers from a lack of standardization in procedural steps. Findings from MRB studies demonstrate that sediment source fingerprinting is a highly valuable and reliable sediment source assessment approach to assist land and water resource management under current management frameworks, but efforts are still needed to make this technique ready to be used in a more predominant way in large-scale landscape conservation and restoration efforts. We summarized research needs and suggested the best fingerprinting practices for management purposes with the aim of ensuring that this technique is as robust and reliable as it moves forward.
The U.S. Geological Survey (USGS), in cooperation with the Texas State Soil and Water Conservation Board, developed and applied an approach to create a linkage between the published upper Guadalupe River Soil Water Assessment Tool (SWAT) brush-management (ashe juniper [ Juniperus ashei ]) model and the full authorization version Guadalupe River Water Availability Model (WAM). The SWAT model was published by the USGS, and the Guadalupe River WAM is available from the Texas Commission on Environmental Quality. The upper Guadalupe River watershed is a substantial component of the Guadalupe River WAM. This report serves in part as documentation of a proof of concept on the feasibility of linking these two water-resources planning models for the purpose of simulating possible increases in water storage in Canyon Lake as a result of different brush-management scenarios. The SWAT-WAM linkage for the upper Guadalupe River is documented with a principal objective to evaluate the distributional characteristics of the monthly water storage of Canyon Lake during selected drought conditions. Focus is on the relative evaluation of select scenarios of large-scale or “extensive” brush management within the upper Guadalupe River watershed. There are six SWAT simulations for the upper Guadalupe River watershed that include a baseline (0-percent management of treatable ashe juniper, the baseline scenario from a previous study in which no percentage of ashe juniper is numerically replaced with grassland) along with five scenarios (extensions of SWAT simulations from a previous study) of 20-, 40-, 60-, 80-, and 100-percent random (numerical) replacement of treatable ashe juniper with grasslands throughout the upper Guadalupe River watershed in south-central Texas. SWAT is a process-based, semidistributed, water-balance model designed to predict the effects of landscape management decisions on water yields. A watershed is subdivided into subbasins, and each subbasin is associated with a single reach on the stream network. In general a WAM, such as the Guadalupe River WAM, provides analysis of generalized water rights in a river and reservoir framework. A WAM accommodates hydrology and water usage through several input files containing water rights, watershed parameters, and naturalized streamflow time series. A WAM is generalized for application to rivers and reservoir systems, and input datasets are uniquely developed for a river basin of concern. The extractions of SWAT output for the five extensive brush-management and baseline scenarios were offset by –21 years and, in general, the results were then mapped to the WAM input-flow file. The offset of –21 years was chosen arbitrarily for technical reasons and means that the period of monthly record 1995–2010 of the upper Guadalupe River SWAT became the synthetic period of monthly record 1974–89, hereinafter 1974–89 (synthetic) period, of the Guadalupe River WAM. The relative (between scenario to baseline) effects of extensive brush-management scenarios by using the SWAT-WAM linkage were evaluated, and two critical intermediate results were total inflow to Canyon Lake from 1995 to 2010 and the monthly storage of Canyon Lake from 1974 to 1989 (synthetic). The first quartile or lower 25th percentile of monthly storage of Canyon Lake for the baseline scenario is 381,000 acre-feet (acre-ft) for the hereinafter 1974–89 (synthetic) period. This lower quartile was chosen for analysis for two critical purposes. First, Canyon Lake is managed with a conservation pool of about 386,200 acre-ft capacity (as recognized by the WAM) and is at or near conservation capacity about 50 percent or more of the time; further, there is intrinsic data censoring that occurs for the monthly storage distribution because Canyon Lake is at or near conservation pool elevation the majority of the time. This intrinsic censoring has the effect of creating a bounded distribution with a left or low-volume tail. Statistical assessment of the brush-management scenarios beginning with the 381,000 acre-ft censoring threshold provides readily interpretable results. Second, the quantification of brush management during periods lacking abundant rainfall, which were defined in this study as months for which Canyon Lake storage was below the 25th percentile for the simulation period, are of substantial interest to water-resource managers and stakeholders in the context of water-supply enhancement. A statistical assessment of the SWAT-WAM linkage for the low-volume tail of the distribution of monthly storage of Canyon Lake is the focus of analysis and interpretation. Drought periods for the analysis are defined as the months (consecutive or not) during which Canyon Lake is below the 25th percentile of storage (381,000 acre-ft) for the baseline scenario. Such months are referred to as being within the “Drought Quartile.” The Drought Quartile is a conceptual and heuristically determined waypoint for the analysis and is not related to any administrative definition of drought by stakeholders or policy makers. The five scenarios and the baseline scenario simulated in the upper Guadalupe River SWAT were all passed through the Guadalupe River WAM by the SWAT-WAM linkage described in this report. A comparison of the mean increase per month in reservoir storage for Canyon Lake conditioned for the Drought Quartile was made. For each of the five brush-management and baseline scenarios, the months with storage below 381,000 acre-ft were extracted. The mean monthly storages during the Drought Quartile were computed for each of the five scenarios and the baseline scenario. The mean of the baseline scenario was 376,458 acre-ft and subsequently was subtracted from the mean monthly storage during the Drought Quartile for each of the five scenarios. The mean monthly offset storages of Canyon Lake during the Drought Quartile were 110 acre-ft (20 percent); 448 acre-ft (40 percent); 754 acre-ft (60 percent); 1,080 acre-ft (80 percent); and 1,090 acre-ft (100 percent). A particular mean was interpreted as follows: the value of 754 acre-ft for the 60-percent brush-management scenario implies that, on average, this scenario indicates an additional 754 acre-ft per month of storage in Canyon Lake relative to the baseline during the Drought Quartile. All of the five scenarios resulted in an increase on average to water supply relative to the baseline scenario during the Drought Quartile through the SWAT-WAM linkage.
In the early 1960's, the National Aeronautics and Space Administration (NASA) began purchasing 140,000 acres on Merritt Island, Florida, in order to develop a center for space exploration. Most of this land was acquired to provide a safety and security buffer around NASA facilities. NASA, as the managing agency for the Kennedy Space Center (KSC), is responsible for preventing or controlling environmental pollution from the Federal facilities and activities at the Space Center and is committed to use all practicable means to protect and enhance the quality of the surrounding environment. The Merritt Island National Wildlife Refuge was established in 1963 when management authority for undeveloped lands at KSC was transferred to the U.S. Fish and Wildlife Service. In addition to manage for 11 Federally-listed threatened and endangered species and other resident and migratory fish and wildlife populations, the Refuge has comanagement responsibility for 19,000 acres of mosquito control impoundments and 2,500 acres of citrus groves. The Canaveral National Seashore was developed in 1975 when management of a portion of the coastal lands was transferred from NASA to the National Park Service. This multiagency jurisdiction on Merritt Island has resulted in a complex management environment. The modeling workshop described in this report was conducted May 21-25, 1984, at the Kennedy Space Center to: (1) enhance communication among the agencies with management responsibilities on Merritt Island; (2) integrate available information concerning the development, management, and ecology of Merritt Island; and (3) identify key research and monitoring needs associated with the management and use of the island's resources. The workshop was structured around the formulation of a model that would simulate primary management and use activities on Merritt Island and their effects on upland, impoundment, and estuarine vegetation and associated wildlife. The simulation model is composed of four connected submodels. The Uplands submodel calculates changes in acres and structural components of vegetation communities resulting from succession, fire, facilities development, and shuttle launch depositions, as well as the quantity and quality of surface runoff and aquifer input to an impoundment and an estuary. The Impoundment submodel next determines water quality and quantity and changes in vegetation resulting from water level manipulation and prescribed burning. The Estuary submodel than determines water quality parameters and acres of seagrass beds. Finally, the Wildlife submodel calculates habitat suitability indices for key species of interest, based on vegetation conditions in the uplands and impoundments and on several hydrologic parameters. The model represents a hypothetical management unit with 2,500 acres of uplands, a 600-acre impoundment, and a 1,500-acre section of estuary. Two management scenarios were run to analyze model behavior. The scenarios differ in the frequency of shuttle launches and prescribed burning, the extent of facilities development, the amount of land disposed waste material applied, and the nature and timing of impoundment water level control. Early in a model development project, the process of building the model is usually of greater benefit than the model itself. The model building process stimulates interaction among agencies, assists in integrating existing information, and helps identify research needs. These benefits usually accrue even in the absence of real predictive power in the resulting model. Open communication occurs among the Federal, State, and local agencies involved with activities on Merritt Island and the agencies have a cooperative working relationship. The workshop provided an opportunity for all of these agencies to meet at one time and have focused discussions on the key environmental and multiagency resource management issues. The workshop framework helped to integrate information and assumptions from a number of disciplines and agencies. This integration occurred in the computer simulation model and among workshop participants as submodel linkages were developed and scenario results discussed. A number of research needs were identified at the workshop during the model building and testing exercises and associated discussions. These needs were based on the informed judgement of researchers and managers familiar with Merritt Island or similar areas, rather than on a comprehensive literature review of sensitivity analysis of the preliminary model developed at the workshop. Some of the needs can be addressed by interpreting the results of completed studies from similar geographic areas as they relate to Merritt Island, while other will require additional research studies on Merritt Island. Major research needs associated with the Upland submodel include behavior of the near-surface aquifer, factors limiting slash pine regeneration, frequency and effects of natural fire on various cover types, cumulative effects of shuttle launches, and fate in upland soils of nitrogen and phosphorous from land applied waste material. Key Impoundment submodel needs include documentation of vegetation changes in response to altered water depth, salinity, and nutrient concentrations and better specification of the functional characteristics of impoundments as chemical filters. Important information gaps identified in the Estuary submodel include a more complete analysis of factors contributing to phytoplankton abundance, evaluation of sources of turbidity other than phytoplankton, and identification and quantification of factors limiting seagrass distribution. Primary research needs associated with the Wildlife submodel include a survey of breeding habitat, production data, and harvest data for mottled ducks; data on the emigration and immigration of juvenile mullet (and other transient fish) in the impoundment; the contribution of various seagrasses to habitat requirements of sea trout; and the effects of dissolved oxygen on survival of juvenile sea trout. Ideally, the modeling workshop process is iterative in nature. Periods between workshops are used for research, data collection, and model refinement. Each workshop integrates information collected since the last workshop and produces a more credible model that is more useful in evaluating management alternatives. Participants felt that continued application of this process would help provide ongoing integration and communication among agencies and would allow each agency's planning and management activities to be viewed within the context of an overall assessment.
In 2014 the U.S. Geological Survey (USGS) and the Bureau of Ocean Energy Management (BOEM) entered into Intra-agency agreement M13PG00037 to map an area of the Oregon Outer Continental Shelf (OCS) off of Coos Bay, Oregon, under consideration for development of a floating wind energy farm. The BOEM requires seafloor mapping and site characterization studies in order to evaluate the impact of seafloor and sub-seafloor conditions on the installation, operation, and structural integrity of proposed renewable energy projects, as well as to assess the potential effects of construction and operations on archaeological resources. The mission of the USGS is to provide geologic, topographic, and hydrologic information that contributes to the wise management of the Nation's natural resources and that promotes the health, safety, and well being of the people. This information consists of maps, databases, and descriptions and analyses of the water, energy, and mineral resources, land surface, underlying geologic structure, and dynamic processes of the earth. For the Oregon OCS study, the USGS acquired multibeam echo sounder and seafloor video data surrounding the proposed development site, which is 95 km2 in area and 15 miles offshore from Coos Bay. The development site had been surveyed by Solmar Hydro Inc. in 2013 under a contract with WindFloat Pacific. The USGS subsequently produced a bathymetry digital elevation model and a backscatter intensity grid that were merged with existing data collected by the contractor. The merged grids were published along with visual observations of benthic geo-habitat from the video data in an associated USGS data release (Cochrane and others, 2015). This report includes the results of analysis of the video data conducted by Oregon State University and the geo-habitat interpretation of the multibeam echo sounder (MBES) data conducted by the USGS. MBES data was published in Cochrane and others (2015). Interpretive data associated with this publication is published in Cochrane (2017). All the data is provided as geographic information system (GIS) files that contain both Esri ArcGIS geotiffs or shapefiles. For those who do not own the full suite of Esri GIS and mapping software, the data can be read using Esri ArcReader, a free viewer that is available at http://www.esri.com/software/arcgis/arcreader/index.html (last accessed August 29, 2016). Web services, which consist of standard implementations of ArcGIS representational state transfer (REST) Service and Open Geospatial Consortium (OGC) GIS web map service (WMS), also are available for all published GIS data. Web services were created using an ArcGIS service definition file, resulting in data layers that are symbolized as shown on the associated report figures. Both the ArcGIS REST Service and OGC WMS Service include all the individual GIS layers. Data layers are bundled together in a map-area web service; however, each layer can be symbolized and accessed individually after the web service is ingested into a desktop application or web map. Web services enable users to download and view data, as well as to easily add data to their own workflows, using any browser-enabled, standalone or mobile device. Though the surficial substrate is dominated by combinations of mud and sand substrate, a diverse assortment of geomorphologic features are related to geologic processes—one anticlinal ridge where bedrock is exposed, a slump and associated scarps, and pockmarks. Pockmarks are seen in the form of fields of small pockmarks, a lineation of large pockmarks with methanogenic carbonates, and areas of large pockmarks that have merged into larger variously shaped depressions. The slump appears to have originated at the pockmark lineation. Video-supervised numerical analysis of the MBES backscatter intensity data and vector ruggedness derived from the MBES bathymetry data was used to produce a substrate model called a seafloor character raster for the study area. The seafloor character raster consists of three substrate classes: soft-flat areas, hard-flat areas, and hard-rugged areas. A Coastal and Marine Ecological Classification Standard (CMECS) geoform and substrate map was also produced using depth, slope, and benthic position index classes to delineate geoform boundaries. Seven geoforms were identified in this process, including ridges, slump scars, slump deposits, basins, and pockmarks. Statistical analysis of the video data for correlations between substrate, depth, and invertebrate assemblages resulted in the identification of seven biomes: three hard-bottom biomes and four softbottom biomes. A similar analysis of vertebrate observations produces a similar set of biomes. The biome between-group dissimilarity was very high or high. Invertebrates alone represent most of the structure of the whole benthic community into different assemblages. A biotope map was generated using the seafloor character raster and the substrate and depth values of the biomes. Hard substrate biotopes were small in size and were located primarily on the ridge and in pockmarks along the pockmark lineation. The soft-bottom bitopes consisted of large contiguous areas delimited by isobaths.
A hydrologic model of the Apalachicola–Chattahoochee–Flint River Basin (ACFB) has been developed as part of a U.S. Geological Survey (USGS) National Climate Change and Wildlife Science Center effort to provide integrated science that helps resource managers understand the effect of climate change on a range of ecosystem responses. The hydrologic model was developed as part of the Southeast Regional Assessment Project using the Precipitation Runoff Modeling System (PRMS), a deterministic, distributed-parameter, process-based system that simulates the effects of precipitation, temperature, and land use on basin hydrology. The ACFB PRMS model simulates streamflow throughout the approximately 50,700 square-kilometer basin on a daily time step for the period 1950–99 using gridded climate forcings of air temperature and precipitation, and parameters derived from spatial data layers of altitude, land cover, soils, surficial geology, depression storage (small water bodies), and data from 56 USGS streamgages. Measured streamflow data from 35 of the 56 USGS streamgages were used to calibrate and evaluate simulated basin streamflow; the remaining gage locations were used for model delineation only. The model matched measured daily streamflow at 31 of the 35 calibration gages with Nash-Sutcliffe Model Efficiency Index (NS) greater than 0.6. Streamflow data for some calibration gages were augmented for regulation and water use effects to represent more natural flow volumes. Time-static parameters describing land cover limited the ability of the simulation to match historical runoff in the more developed subbasins. Overall, the PRMS simulation of the ACFB provides a good representation of basin hydrology on annual and monthly time steps. Calibration subbasins were analyzed by separating the 35 subbasins into five classes based on physiography, land use, and stream type (tributary or mainstem). The lowest NS values were rarely below 0.6, whereas the median NS for all five classes was within 0.74 to 0.96 for annual mean streamflow, 0.89 to 0.98 for mean monthly streamflow, and 0.82 to 0.98 for monthly mean streamflow. The median bias for all five classes was within –4.3 to 0.8 percent for annual mean streamflow, –6.3 to 0.5 percent for mean monthly streamflow, and –9.3 to 1.3 percent for monthly mean streamflow. The NS results combined with the percent bias results indicated a good to very good streamflow volume simulation for all subbasins. This simulation of the ACFB provides a foundation for future modeling and interpretive studies. Streamflow and other components of the hydrologic cycle simulated by PRMS can be used to inform other types of simulations; water-temperature, hydrodynamic, and ecosystem-dynamics simulations are three examples. In addition, possible future hydrologic conditions could be studied using this model in combination with land cover projections and downscaled general circulation model results.
This final report summarizes activities, outcomes, and lessons learned from a 3-year project titled “Climate Change Adaptation for Coastal National Wildlife Refuges” with the Cape Romain National Wildlife Refuge (NWR) and local partners in the surrounding South Carolina Lowcountry. The Lowcountry is classified as the 10-county area encompassing the coastal plain of South Carolina (this report specifically focuses on Berkeley, Charleston, and Georgetown Counties). The goals of this work, sponsored by the U.S. Geological Survey’s Southeast Climate Adaptation Science Center (SECASC), were to foster active engagement with stakeholders; to develop a comprehensive definition of adaptation problems faced by agencies, organizations, and individuals near the Cape Romain NWR that accounts for global change, local values, knowledge and perceptions; and to encourage social learning and building of effective networks and trust across South Carolina Lowcountry organizations and individuals. Although project scoping began at the scale of the Atlantic seaboard, by engaging with NWRs from Massachusetts to Florida, participating refuge personnel eventually selected the Cape Romain NWR to serve as a case study for testing our goals. The Cape Romain Partnership for Coastal Conservation was established to address global change impacts at a regional level and includes representation from Federal and State resource agencies, local conservation nongovernmental organizations, and organizations representing underserved community interests. Research topics, originating from discussions with Cape Romain Partnership for Coastal Conservation members, focused on quantifying key drivers of change including localized sea-level rise (SLR) predictions, estimates of coastal hurricane inundation as amplified by SLR, and urban growth trends and forecasts. These key drivers provided a foundation to engage stakeholders in planning exercises to begin a process of collective understanding and collaborative decision making. The goal of this process was to develop collective strategies of adaptation to enhance community and ecosystem resilience in the South Carolina Lowcountry. South Carolina’s Lowcountry is experiencing rapid environmental and social transformation because of SLR rates approaching twice the global average, chronic tidal flooding and catastrophic storm surges, erosion and loss of habitats that provide essential services to wildlife and humans, and increasing social polarization fueled by aggressive low-density urban growth and other forms of land conversion. To support characterizations of plausible future scenarios, we used available or, in some cases, developed new models to project future conditions of key environmental and social-economic drivers. Because of the imprecision of mean global SLR projections, the SECASC commissioned a climatological study to account for local conditions and multiple representative concentration pathways to project a tailored distribution of future sea levels. These projections were matched to SLR scenarios provided by existing models to anticipate the range of future coastal habitat changes in the South Carolina Lowcountry. SLR scenarios were also incorporated into existing storm-surge models, which do not account for alternate baseline sea levels, to project the local effects of future hurricanes. To evaluate the extent and effects of population growth and urban expansion, we relied on an existing urban-growth model to map the spatial distribution of land-conversion probabilities, the total area of which is predicted to increase twofold to threefold over the next 60 years. In addition to this simplified model, an econometric model is in development to account for nonlinear feedback dynamics in land value, land use, and ecosystem service production. Although not yet completed, the goals of this model are to produce more-detailed projections of growth dynamics and to allow predictions of development patterns resulting from alternate land-use planning policies and incentives. Collaborative planning for an uncertain future requires more than providing decision makers with information on future physical and ecological conditions; developing effective and consensual strategies must also integrate sociological values, multiple cultural perspectives, and an understanding of human behavior. To support broad stakeholder engagement in integrative approaches to adaptation planning, emphasis was placed on the importance of considering differences in how individuals perceive their environment and create meaning. Because cultural frameworks form the basis for perceptions and, ultimately, the behaviors of individuals and institutions, we describe a model of human behavior and how it can be used to understand the effect of cultural complexity and variation in perception on choices, behavioral change, and long-term maintenance of behaviors. We consider a model commonly used in the field of behavioral health that accommodates variation in human perception when describing stages of behavior and the dynamics of behavioral change. Tailoring communication and engagement activities to targeted stakeholders is likely to benefit from increased understanding of behavioral change processes. The complex nature of this problem limited the usefulness of a traditional decision-analytic approach, we explored alternative methods for engagement, collaborative learning and decision making. Recognizing that project partners and Lowcountry stakeholders may be at different stages of preparedness and interest level for modifying behavior as a function of global change, we facilitated a scenario-planning exercise to familiarize partners with this well-established approach for communicating the opportunities and threats arising under alternative, plausible futures. We developed narratives for four alternative South Carolina Lowcountry scenarios to be used in later strategic planning that focus on quantitative trends for three primary drivers with high impact and high uncertainty: manifestations of climate change, social-political shifts at a global level, and forces of local value and power structures. This scenario-planning exercise underscored the complex relation between the temporospatial scale of the production of ecological goods and services and the institutional scale at which they are managed. We then guided the partners through an assessment of the relevant strengths and weaknesses of the Cape Romain Partnership for Coastal Protection, using the threats and opportunities characterized by each scenario to understand how the partnership might respond when attempting to meet conservation and societal objectives. The partnership identified key strengths including partnership experience, outreach and technical capacities, a substantial conservation land base, and high social cohesion in the South Carolina Lowcountry. Limited communication expertise, institutional inertia, and insufficient staffing and funding were recognized as important weaknesses across the partnership. By examining and scoring combinations of internal strengths and weaknesses and external threats and opportunities, the partnership developed sets of prioritized strategies to consider in the context of a given scenario. Although we had insufficient time to examine all scenarios in detail, the intent was to identify a portfolio of strategic actions to address threats and opportunities represented in multiple plausible futures. Top-ranking strategies encompassed a range of actions that focused on strengthening the conservation community and communicating the benefits of nature (that is, ecosystem services) to leveraging partnerships to expand land protection. This report also details the methods and preliminary results of several models developed or applied in support of this project. Two parcel-selection algorithms were used to evaluate anticipated habitat changes and patterns of urban growth to guide decisions on optimal conservation reserve design to protect habitat communities. One approach used a widely available planning software (MARXAN) to maximize conservation benefits near the Cape Romain NWR, whereas the other approach was a novel application of economic theory to account for uncertainty in future conditions and for the risks of unanticipated habitat loss. This latter model applies modern portfolio theory to estimate the risk of investing in any portfolio of land parcels (that is, candidate “reserves”) under climate-change uncertainty by quantifying the variation and spatial correlation of conservation benefits derived from each portfolio. We expanded the range of actions beyond simply whether or not to invest in a set of land parcels, an approach commonly used in spatial conservation planning, to also include consideration of divestment from currently protected lands. Such refinements allow for better accounting of system dynamics and can evaluate the benefits of flexible conservation tools such as rolling easements. Model results were conditional on a decision maker’s risk tolerance but highlighted general strategies of land conservation to increase future habitat representation beyond what is expected under the current protected land base. We built models that may help inform coastal planning by estimating salinity dynamics and the performance of oyster reef restoration efforts to predict the combined effects of global change and management of freshwater flows on coastal habitats and the processes that contribute to their resilience. These models can support restoration decisions by evaluating the expected benefits of site locations for shoreline protection and fisheries production. Lastly, we developed a spatially explicit economic model that predicts feedback dynamics among land value, land-use change, and effects on ecosystem service provision to explore zoning policies and incentives on urban growth and ecosystem services. We summarize these efforts with insights and considerations for the Cape Romain Partnership for Coastal Protection to continue to engage stakeholders in effective adaptation planning. First, notions of place attachment (referred to as sense of place), and the role of culture in social discourse are increasingly being used to understand the complex interactions between society and the environment and how societies respond and adapt to climate change. Sense of place was a unifying theme whenever the future of the South Carolina Lowcountry was discussed. The contribution of the South Carolina Lowcountry’s environmental wealth, rich cultural heritage, and quality of life to sense of place has important implications for how adaptation planning might best be pursued. More community-based governance of the commons (in other words, natural and cultural resources held in common), in which broad stakeholder participation and power sharing are key elements, is considered important. This devolution of governance is characterized by polycentric institutions and self-organizing social networks that promote a local culture of knowledge sharing, problem solving, and learning. These so-called bridging organizations (or individuals) often provide the leadership necessary to bring together potentially disparate Government agencies and institutions, private organizations, and individuals in a collective process of problem solving. Our observations also suggest that the conservation community in the South Carolina Lowcountry views its activities as integral to the broader governance of social-ecological systems, in which responses to the forces of global change are mediated through culture, economics, and politics. Rather than directly competing with other interests, the South Carolina Lowcountry conservation community seems to embrace an interpretation of conservation in which the fundamental objective is the quality of human life rather than environmental protection. Fundamental to the types of governance reforms described above is the notion of coproduction, in which experts and users collaborate to develop a shared body of knowledge. In this approach, scientists work with stakeholders to help frame questions, design research, and collect and analyze data. Such sustained collaborations are increasingly believed to be an effective way to produce useable (or actionable) science. The emphasis on social learning, leveraging strong social networks, coordinating and deliberating among diverse stakeholders, and applying principles of adaptive management is an essential contribution to adaptive capacity. The diverse and robust set of scientific approaches, methods to help stakeholders collaborate in effective and goal-driven planning processes, and decision tools resulting from this project hopefully will assist Cape Romain NWR and its partners prepare for climatic, ecological, and social changes over the coming decades.
The hydrologic drought decision support system (HyDroDSS) was developed by the U.S. Geological Survey (USGS) in cooperation with the Rhode Island Water Resources Board (RIWRB) for use in the analysis of hydrologic variables that may indicate the risk for streamflows to be below user-defined flow targets at a designated site of interest, which is defined herein as data-collection site on a stream that may be adversely affected by pumping. Hydrologic drought is defined for this study as a period of lower than normal streamflows caused by precipitation deficits and (or) water withdrawals. The HyDroDSS is designed to provide water managers with risk-based information for balancing water-supply needs and aquatic-habitat protection goals to mitigate potential effects of hydrologic drought. This report describes the theory and methods for retrospective streamflow-depletion analysis, rank correlation analysis, and drought-projection analysis. All three methods are designed to inform decisions made by drought steering committees and decisionmakers on the basis of quantitative risk assessment. All three methods use estimates of unaltered streamflow, which is the measured or modeled flow without major withdrawals or discharges, to approximate a natural low-flow regime. Retrospective streamflow-depletion analysis can be used by water-resource managers to evaluate relations between withdrawal plans and the potential effects of withdrawal plans on streams at one or more sites of interest in an area. Retrospective streamflow-depletion analysis indicates the historical risk of being below user-defined flow targets if different pumping plans were implemented for the period of record. Retrospective streamflow-depletion analysis also indicates the risk for creating hydrologic drought conditions caused by use of a pumping plan. Retrospective streamflow-depletion analysis is done by calculating the net streamflow depletions from withdrawals and discharges and applying these depletions to a simulated record of unaltered streamflow. Rank correlation analysis in the HyDroDSS indicates the persistence of hydrologic measurements from month to month for the prediction of developing hydrologic drought conditions and quantitatively indicates which hydrologic variables may be used to indicate the onset of hydrologic drought conditions. Rank correlation analysis also indicates the potential use of each variable for estimating the monthly minimum unaltered flow at a site of interest for use in the drought-projection analysis. Rank correlation analysis in the HyDroDSS is done by calculating Spearman’s rho for paired samples and the 95-percent confidence limits of this rho value. Rank correlation analysis can be done by using precipitation, groundwater levels, measured streamflows, and estimated unaltered streamflows. Serial correlation analysis, which indicates relations between current and future values, can be done for a single site. Cross correlation analysis, which indicates relations among current values at one site and current and future values at a second site, also can be done. Drought-projection analysis in the HyDroDSS indicates the risk for being in a hydrologic drought condition during the current month and the five following months with and without pumping. Drought-projection analysis also indicates the potential effectiveness of water-conservation methods for mitigating the effect of withdrawals in the coming months on the basis of the amount of depletion caused by different pumping plans and on the risk of unaltered flows being below streamflow targets. Drought-projection analysis in the HyDroDSS is done with Monte Carlo methods by using the position analysis method. In this method the initial value of estimated unaltered streamflows is calculated by correlation to a measured hydrologic variable (monthly precipitation, groundwater levels, or streamflows from an index station identified with the rank correlation analysis). Then a pseudorandom number generator is used to create 251 six-month-long flow traces by using a bootstrap method. Serial correlation of the estimated unaltered monthly minimum streamflows determined from the rank correlation analysis is preserved within each flow trace. The sample of unaltered streamflows indicates the risk of being below flow targets in the coming months under simulated natural conditions (without historic withdrawals). The streamflow-depletion algorithms are then used to estimate risks of flow being below targets if selected pumping plans are used. This report also describes the implementation of the HyDroDSS. The HyDroDSS was developed as a Microsoft Access® database application to facilitate storage, handling, and use of hydrologic datasets with a simple graphical user interface. The program is implemented in the database by using the Visual Basic for Applications® (VBA) programming language. Program source code for the analytical techniques is provided in the HyDroDSS and in electronic text files accompanying this report. Program source code for the graphical user interface and for data-handling code, which is specific to Microsoft Access® and the HyDroDSS, is provided in the database. An installation package with a run-time version of the software is available with this report for potential users who do not have a compatible copy of Microsoft Access®. Administrative rights are needed to install this version of the HyDroDSS. A case study, to demonstrate the use of HyDroDSS and interpretation of results for a site of interest, is detailed for the USGS streamgage on the Hunt River (station 01117000) near East Greenwich in central Rhode Island. The Hunt River streamgage was used because it has a long record of streamflow and is in a well-studied basin with a substantial amount of hydrologic and water-use data including groundwater pumping for municipal water supply.
National Park Service (NPS) units in the northern Great Plains (NGP) were established to preserve and interpret the history of the United States, protect and showcase unusual geology and paleontology, and provide a home for vanishing large wildlife. A unifying feature among these national parks, monuments, and historic sites is northern mixed-grass prairie, which not only provides background scenery and habitat but is the foundation of many park missions. As recognition of the prairie’s importance to park fundamental resources and values has grown, so too has the realization that invasive plants threaten these values by reducing native species diversity, altering food webs, and marring the visitor experience. Cheatgrass ( Bromus tectorum ) and Japanese brome ( Bromus japonicus )—collectively referred to as “annual bromes”—are of particular concern because of their documented increase through time, and their association with lower native plant diversity, in NGP parks. A variety of grazing, herbicide-application, and prescribed-fire experiments have shown promising short-term results for controlling annual bromes in research-scale plots in the NGP, but it is unclear whether these management actions will be as effective at the larger spatial and longer temporal scales relevant to park management. When uncertainties about the effectiveness of different management actions cannot be answered with traditional research approaches in time to prevent resource degradation, yet recurrent management decisions must be made, an adaptive management approach may be appropriate. Thus, in 2017, we began to develop the ABAM—Annual Brome Adaptive Management—framework. The aim of this framework is to reduce uncertainties about methods for controlling annual bromes in seven NGP parks through a formal process of learning from the application of on-going management. A uniform framework across seven parks provides greater opportunities for reducing these uncertainties compared to a single park acting alone or to multiple parks using different adaptive management frameworks. This technical report details the development and expected implementation of the ABAM framework. After briefly introducing the issue (Section 1) and describing the context in which the framework was developed (Section 2), the report describes how a structured decision-making process was used to frame the problem, determine concrete objectives, and decide the alternative actions for achieving those objectives that the framework would be designed around (Section 3). Then the report describes the process used to develop the ABAM decision support system (Section 4). At the core of this system is the ABAM decision support tool, a Bayesian decision network built on nearly two decades of vegetation monitoring data from NGP parks, as well as current literature and ABAMspecific experiments. This tool, referred to as the ABAM model by its intended users, is built to work with the existing vegetation monitoring, prescribed fire, and invasive plant management programs that support the seven ABAM parks. In Section 5, the report describes how output from the ABAM model is produced and used in annual vegetation management decision making. It describes the ABAM R package (Baldwin et al. 2021) and an example R script that leads a user through an annual workflow using the model and the package. This workflow updates the model with information from new monitoring events following management actions of prescribed fire, herbicide application, or a combination thereof. With the updated model, data describing the current condition of vegetation in park management units, and current data for environmental factors included in the model (soil texture, slope, weather, and grazing), the user then runs the model to predict future vegetation conditions—and managers’ happiness with the outcome—in response to each of 10 management actions for each management unit in each park. These predictions inform managers’ decisions regarding locations and types of management actions to apply in the upcoming year. The ABAM framework is in its infancy, and the report concludes (Section 6) with a discussion of its longer-term viability. Successful adaptive management requires commitment for the long term, likely decades. Currently, the predictions of the decision support tool are not expected to be highly accurate, but they ideally will improve over time as more management actions are applied and their outcomes are captured by monitoring. We designed the ABAM decision support tool to work with the existing management and monitoring resources in ABAM parks to maximize the sustainability of the model’s use, but the ABAM framework requires more than the model. Because this application of an adaptive management framework supported by a quantitative decision support tool to guide vegetation management is unique within the NPS (to our knowledge), institutional knowledge and mechanisms for long-term implementation of the ABAM framework do not exist within the agency. Additionally, the ABAM model and the data that inform it could be improved in a variety of ways. Thus, this report concludes with a discussion of ways to both sustain and improve upon the work completed so far.