Geology ReportsSearch

SEARCH · Geology Reports

Results for “Engineering Analysis”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 recordsLinked to original sources

occupancyTuts: Occupancy modelling tutorials with RPresence

1. The occupancy modelling framework offers tremendous flexibility in estimating species abundance and distribution patterns while accounting for imperfect detection, and has seen rapid growth and adoption since its introduction at the beginning of the century. 2. At the same time, in an era of big data, there are increasing demands on developing quantitative skills and proficiency in young ecologists, many of whom lack the quantitative training needed to conduct research professionally. 3. We introduce occupancyTuts , an R package that features 28 learnr tutorials that teach the statistical underpinnings of several occupancy models. The tutorials include written content, instructional videos, R exercises, and quiz elements, covering a range of topics including statistical underpinnings, single- and dynamic-occupancy models, study design and several of the ‘spin-off’ models that extend the basic framework. 4. We plan for development of new tutorials that use RPresence as the analysis engine, and welcome new tutorial contributions that use other R packages as the analysis engine as well.

Methods in Ecology and Evolution

Level II scour analysis for Bridge 28 (BRNATH00660028) on Town Highway 66, crossing Locust Creek, Barnard, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRNATH00660028 on Town Highway 66 crossing the Locust Creek, Barnard, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 21.5-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the surface cover is pasture. In the study area, the Locust Creek has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 47 ft and an average channel depth of 5 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 72.6 mm (0.238 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 22 and 29, 1994, respectively, indicated that the reach was stable. Additional Level I data was collected on 12/15/94 and was used to update the data shown in Appendix E. The Town Highway 66 crossing of the Locust Creek is a 41-ft-long, one-lane bridge consisting of a 39 ft steel stringer type bridge with a concrete deck (Vermont Agency of Transportation, written communication, August 24, 1994). The clear span is 36.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The upstream right wingwall is protected by stone fill. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. This report provides the results of a detailed Level II analysis of scour potential at structure BRNATH00660028 on Town Highway 66 crossing the Locust Creek, Barnard, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 21.5-mi2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the surface cover is pasture. In the study area, the Locust Creek has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 47 ft and an average channel depth of 5 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D50) of 72.6 mm (0.238 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 22 and 29, 1994, respectively, indicated that the reach was stable. Additional Level I data was collected on 12/15/94 and was used to update the data shown in Appendix E. The Town Highway 66 crossing of the Locust Creek is a 41-ft-long, one-lane bridge consisting of a 39 ft steel stringer type bridge with a concrete deck (Vermont Agency of Transportation, written communication, August 24, 1994). The clear span is 36.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The upstream right wingwall is protected by stone fill. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.

Vermont

Field occurrences of liquefaction-induced features: A primer for engineering geologic analysis of paleoseismic shaking

Discussed in this paper are the factors that control the typical manifestations of liquefaction that are found in continental field settings. The factors are given mainly in terms of the local geologic field situation and the geotechnical properties there. A meaningful interpretation of liquefaction-based data for quantitative analysis of paleoseismic shaking requires understanding of both geologic and geotechnical roles in the mode of ground failure at a specific site. Recommendations are made for the size of the field area that must be searched for liquefaction effects, in order to develop adequate data for engineering geologic/geotechnical analyses of paleoseismicity. The areal extent must be based on an appreciation that the tectonic situation can cause seismically induced liquefaction effects to form in some locales, but not in others nearby, even for a strong earthquake in the region. Our guidelines for the conduct of the field search and preliminary analysis of the data relate to three issues for which liquefaction features are especially useful in answering: Has there been strong Holocene/latest Pleistocene shaking in the region? Where was the tectonic source? And what was the strength of shaking? Understanding of the various factors that control the manifestations of liquefaction effects, which we present in this paper, is essential for developing credible answers to these questions. ?? 2004 Elsvier B.V. All rights reserved.

Engineering Geology

An engineering economic analysis of a program for artificial groundwater recharge

This study describes and demonstrates two alternate methods for evaluating the relative costs and benefits of artificial groundwater recharge using percolation ponds. The first analysis considers the benefits to be the reduction of pumping lifts and land subsidence; the second considers benefits as the alternative costs of a comparable surface delivery system. Example computations are carried out for an existing artificial recharge program in Santa Clara Valley in California. A computer groundwater model is used to estimate both the average long term and the drought period effects of artificial recharge in the study area. For the example problem, the benefits of reduced average annual pumping lifts and reduced incremental subsidence are greater than the total costs of continuing the existing artificial recharge program. Benefits for reduced subsidence are strongly dependent on initial aquifer conditions. The second analysis compares the costs of continuing the artificial recharge program with the costs of a surface system which would achieve the same hydraulic effects. Results indicate that the costs of artificial recharge are considerably smaller than the alternative costs of an equivalent surface system. In evaluating a particular program, consideration should also be given to uncertainties in future supplies and demands for water as well as to the probability of extreme events such as droughts

California

Preface to the focus section on earthquake-induced ground deformation

Ground failure due to earthquake-induced liquefaction, surface fault rupture, and landsliding has caused substantial damage in the past and continues to pose risks to critical infrastructure in the future. The consideration of ground failure is central to engineering analysis and design, ranging from site-specific engineering assessments of ground failure potential to broader regional-scale ground failure assessments of near-real-time earthquake impacts or longer-term portfolio risk. Uncertainties in all aspects of the problem complicate the prediction of earthquake-induced ground failure, including the identification of hazard-susceptible geomaterials, characterizing their spatial extent and physical properties, spatio-temporal variability in groundwater conditions, characterization of earthquake ground motions, assessing ground failure severity, and linking ground failure severity to infrastructure damage and loss.

Seismological Research Letters

Level II scour analysis for Bridge 10 (NORWTH00120010) Town Highway 012 Bloody Brook, Norwich, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NORWTH00120010 on town highway 12 crossing Bloody Brook, Norwich, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting the Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province in east-central Vermont. The 8.98-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left bank upstream and the left and right banks downstream are forested. The immediate right bank upstream is covered by shrub and brush with pasture on the overbank. Town Highway 12 runs along the valley of Bloody Brook; however, at structure NORWTH00120010 the road crosses Bloody Brook at a 90-degree angle. In the study area, Bloody Brook has a sinuous channel with a slope of approximately 0.014 ft/ft, an average channel top width of 41 ft and an average channel depth of 3 ft. The predominant channel bed materials are gravel and cobble (D 50 is 51.0 mm or 0.167 ft). The geomorphic assessment at the time of the Level I site visit on October 31, 1994, indicated that the reach was unstable. The town highway 12 crossing of Bloody Brook is a 34-ft-long, two-lane bridge consisting of one 30-foot clear span (Vermont Agency of Transportation, written commun., July 29, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The right abutment is protected by sparse type-2 stone fill (less than 24 inches diameter). The channel is skewed 0 degrees to the opening and the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 28 (BRIDTH00440028) on Town Highway 044 crossing Plymouth Brook, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00440028 on town highway 44 crossing Plymouth Brook, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Bridgewater. The 11.3-mi 2 drainage area is a predominantly rural basin. In the vicinity of the study site, the left and right banks are pasture. In the study area, Plymouth Brook has an incised channel with a slope of approximately 0.0054 ft/ft, an average channel top width of 42 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel (D 50 is 62.3 mm or 0.204 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 9, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 38 (BETHTH00070038) on Town Highway 007, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00070038 on town highway 7 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 8.83-mi 2 drainage area is predominantly rural and forested. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, Gilead Brook is an incised, straight channel with a slope of approximately 0.028 ft/ft, an average channel top width of 46 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel (D 50 is 43.9 mm or 0.144 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 18, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 40 (BETHTH00230040) on Town Highway 23, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00230040 on town highway 23 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from VTAOT files, was compiled prior to conducting the Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 10.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have moderately dense woody vegetation coverage. In the study area, the Gilead Brook has an incised, sinuous channel downstream of the site and a meandering channel upstream, with narrow flood plains and a slope of approximately 0.015 ft/ft, an average channel top width of 47.0 ft and an average channel depth of 2.75 ft. The predominant channel bed materials are gravel and cobble (D 50 is 94.8 mm or 0.311 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 14, 1994, indicated that the reach was laterally unstable. The town highway 23 crossing of Gilead Brook is a 37-ft-long, one-lane bridge consisting of one 34-foot span steel-stringer type superstructure (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with concrete wingwalls. The channel is skewed 25 degrees to the opening and the opening-skew-to-roadway is zero degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the downstream right wingwall during the Level I assessment. The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) on the upstream and downstream right roadway embankments, at the extreme upstream and downstream ends of the upstream and downstream right wingwalls, and along the entire base length of the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 27 (BRIDTH00490027) on Town Highway 049, crossing Broad Brook, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00490027 on town highway 49 crossing Broad Brook, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 13.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are pasture with moderate tree cover on the immediate banks. Upstream of bridge 27, a gravel road runs parallel to the left bank. In the study area, the Broad Brook has an incised channel with a slope of approximately 0.007 ft/ft, an average channel top width of 54 ft and an average channel depth of 4 ft. The predominant channel bed materials are gravel and cobble with a D 50 (median diameter) of 77.9 mm or 0.256 ft. The geomorphic assessment at the time of the Level I and Level II site visit on November 9, 1994, indicated that the reach was stable. The town highway 49 crossing of the Broad Brook is a 32-ft-long, one-lane bridge consisting of one 31-ft steel-beam span (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The left abutment is noted as settled due to previous undermining. Type-2 (less than 3 ft diameter) stone fill protects the upstream left and right wingwalls, the downstream right wingwall, the right abutment, the upstream right road embankment, and the downstream left and right road embankments. Type-3 (less than 4 ft diameter) stone fill protects the downstream left wingwall, but it’s condition was reported as slumping. The channel is skewed approximately 10 degrees to the opening; the opening-skew-to-roadway is also 10 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 20 (IRASTH00080020) on Town Highway 8, crossing the Black River, Irasburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure IRASTH00080020 on town highway 8 crossing the Black River, Irasburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of north-central Vermont in the town of Irasburg. The 110-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the left bank surface cover is pasture and row crops and the right bank is covered by shrub and brush and is adjacent to woods. In the study area, the Black River has a sinuous channel with a slope of approximately 0.002 ft/ft, an average channel top width of 90 ft and an average channel depth of 5 ft. The predominant channel bed material is gravel and cobbles (D 50 is 49.7 mm or 0.163 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 4, 1994, indicated that the reach was laterally unstable. The town highway 8 crossing of the Black River is a 88-ft-long, one-lane covered bridge consisting of one 80-foot span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls on the upstream and downstream sides of the right abutment. The right abutment has stone fill protection. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is zero degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 33 (BETHTH00310033) on Town Highway 031, crossing Lilliesville Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00310033 on town highway 31 crossing the Lilliesville Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 6.85-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left banks have shrub and brush, and the right banks are forested. In the study area, Lilliesville Brook has an incised, straight channel with a slope of approximately 0.02 ft/ft, an average channel top width of 37 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobble (D 50 is 66.8 mm or 0.219 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 13 and 14, 1994, indicated that the reach was stable. The town highway 31 crossing of Lilliesville Brook is a 41-ft-long, one-lane bridge consisting of one 39-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 35 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Scour protection measures in place at the site were type-1 stone fill (less than 12 inches diameter) at the downstream left wingwall, left abutment, and upstream and downstream sides of the left road embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 22 (WODSTH00180022) on Town Highway 18, crossing north Bridgewater Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00180022 on town highway 18 crossing North Bridgewater Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont. The 4.34-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left bank is forested and the right bank is covered by shrub and brush and is adjacent to woods. The right bank of North Bridgewater Brook is parallel to town highway 18 upstream of the bridge. In the study area, North Bridgewater Brook has a sinuous channel with a slope of approximately 0.038 ft/ft, an average channel top width of 48 ft and an average channel depth of 7 ft. The predominant channel bed materials are gravel and cobbles (D 50 is 63.2 mm or 0.207 ft). Due to cut banks and other channel features the geomorphic assessment at the time of the Level I and Level II site visit on August 16, 1994, indicated that the reach was laterally unstable. In addition, the stream approach to the bridge has a high gradient. However, near the upstream face of the bridge the gradient shallows. Approximately 100 feet downstream of the bridge the gradient steepens again. The town highway 18 crossing of North Bridgewater Brook is a 40-ft-long, two-lane bridge consisting of one 35-foot concrete span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The left and right abutments are not protected by stone fill. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 6 (IRASTH00050006) on Town Highway 5, crossing the Black River, Irasburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure IRASTH00050006 on town highway 5 crossing the Black River, Irasburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files were compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of north-central Vermont. The 91.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are forested and a residence is located on the downstream left overbank. In the study area, the Black River has an incised, sinuous channel with a slope of approximately 0.05 ft/ft, an average channel top width of 116 ft and an average bank-full channel depth of 2.8 ft. The predominant channel bed material is cobble (D 50 is 240 mm or 0.789 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 4, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 25 (ALBATH00250030) on Town Highway 25, crossing the Black River, Albany, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ALBATH00250030 on town highway 25 crossing the Black River, Albany, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files were compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of north-central Vermont in the town of Albany. The 58.8-mi 2 drainage area is in a rural, forested basin. In the vicinity of the study site, the banks have predominantly grass vegetation coverage with a few shrubs. In the study area, the Black River has a non-incised, highly meandering channel with a slope of approximately 0.0005 ft/ft, an average channel top width of 56 ft and an average channel depth of 4 ft. The predominant channel bed material is fine sand (D 50 is 1.68 mm or 0.00551 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 5, 1995, indicated that the reach was laterally unstable. The town highway 25 crossing of the Black River is a 42-ft-long, one-lane bridge consisting of one 40-foot span steel-beam superstructure with a timber deck (Vermont Agency of Transportation, written commun., August 3, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is not skewed to the opening and the opening-skew-to-roadway is zero degrees. A scour hole 0.5 ft deeper than the mean thalweg depth was observed along mid-channel from 40 feet upstream to about 10 feet under the bridge during the Level I assessment. The left abutment is slightly undermined at the downstream end. The only scour protection measures at the site were sparse type-1 stone fill (less than 12 inches diameter) on the upstream right road embankment, along the left and right abutments, and along the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices  D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 22 (CRAFTH00180022) on Town Highway 18, crossing Black River, Craftsbury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CRAFTH00180022 on town highway 18 crossing the Black River, Craftsbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of north-central Vermont in the town of Craftsbury. The 41.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks and floodplains are pasture and have no woody vegetation coverage. In the study area, the Black River is not incised, has a meandering channel with a slope of approximately 0.0004 ft/ft, an average channel top width of 66 ft, and an average channel depth of 3 ft. The predominant channel bed material is sand (D 50 is 0.148 mm or 0.000487 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 13, 1995, indicated that the reach was laterally unstable. The town highway 18 crossing of the Black Riveris a 60-ft-long, one-lane bridge consisting of one 55-foot clear-span riveted through-girder type structure with a timber deck (Vermont Agency of Transportation, written commun., August 3, 1994). The bridge is supported by concrete abutments with no wingwalls. The bridge skew is approximately 5 degrees and there is no opening-skew-to-roadway. A scour hole 3 ft deeper than the mean thalweg depth was observed 35 ft downstream of the bridge during the Level I assessment. There is also approximately 2 ft of channel scour upstream of the bridge. There is type-one (less than 12 in diameter) protection on both abutments that may act, in part, as spill-through abutments; the material however is partially made up of the remnants of older log-cribbing abutments, when the bridge length was significantly less than the current structure. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 26 (BRIDTH00340026) on Town Highway 034, crossing Ottauquechee River, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00340026 on town highway 34 crossing the Ottauquechee River, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files were compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 38.0-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have dense woody vegetation coverage except for the upstream right bank, which is grass covered. In the study area, the Ottauquechee River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 62.5 ft and an average channel depth of 4.5 ft. The predominant channel bed material is cobble (D 50 is 97.3 mm or 0.319 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 8, 1994, indicated that the reach was stable. The town highway 34 crossing of the Ottauquechee Riveris a 69-ft-long, two-lane bridge consisting of one 63-foot clear-span steel-pony truss-type superstructure (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 45 degrees. A scour hole 4.5 ft deeper than the mean thalweg depth was observed along the upstream left wingwall during the Level I assessment. The only scour protection measure at the site was type-1 stone fill (less than 12 inches diameter) at the upstream end of the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). These guidelines provide scour equations, which assume an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont