Level II scour analysis for Bridge 36 (ANDOVT00110036) on VT 11, crossing Middle Branch Williams River, Andover, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110036 on State Route 11 crossing the Middle Branch Williams River, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 5.10-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the upstream left bank and forested elsewhere throughout the reach. In the study area, the Middle Branch Williams River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 38 ft and an average bank height of 2 ft. The channel bed material ranges from sand to boulders with a median grain size (D 50 ) of 60.1 mm (0.197 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 28, 1996, indicated that the reach was laterally unstable due to a cut-bank on the left bank upstream, side bar formation on the left bank upstream, and a combination of side bar formation and erosion occurring on the downstream right bank. The State Route 11 crossing of the Middle Branch Williams River is a 28-ft-long, two-lane bridge consisting of one 25-foot concrete-beam span (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 25.3 ft.The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 30 degrees to the opening and the opening-skew-to-roadway is also 30 degrees. A scour hole 0.5 ft deeper than the mean thalweg depth was observed 5 feet upstream of the bridge during the Level I assessment. Scour protection measures at the site include: type-2 stone fill (less than 36 inches diameter) along the left bank upstream, and type-4 stone fill (less than 60 inches diameter) along the entire base length of the upstream left wingwall, and at the upstream end of the upstream right wing wall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 9.5 to 13.7 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 41 (WODSTH00750041) on Town Highway 75, crossing Happy Valley Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00750041 on town highway 75 crossing Happy Valley Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province of east-central Vermont. The 3.45-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is brush with scattered trees. In the study area, Happy Valley Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 23 ft and an average channel depth of 5 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 82.8 mm (0.272 ft). The geomorphic assessment at the time of the Level II site visits on September 13, 1994 and December 14, 1994, indicated that the reach was degrading. Five logs are embedded across the channel under the bridge in an attempt to prevent further degradation (see Figures 5 and 6). The town highway 75 crossing of Happy Valley Brook is a 27-ft-long, two-lane bridge consisting of one 25-foot steel-beam span. The clear span is 17 ft. (Vermont Agency of Transportation, written communication, August 3, 1994). The bridge is supported by vertical, stone abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening and the opening-skew-to-roadway is also 40 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.3 to 2.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 7.2 to 12.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 8 (STAMVT01000008) on State Highway 100, crossing the North Branch of the Hoosic River, Stamford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STAMVT01000008 on Vermont Highway 100 crossing the North Branch of the Hoosic River, Stamford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southern Vermont. The 6.8-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the upstream right bank surface cover is short grass and the upstream left bank is a sand/gravel lot while the immediate banks are covered by shrubs and trees. Downstream of the bridge banks are forested. In the study area, the North Branch of the Hoosic River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 37 ft and an average bank height of 3 ft. The channel bed material is predominantly cobble with a median grain size (D 50 ) of 88.0 mm (0.289 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 1, 1996, indicated that the reach was laterally unstable. The Vermont Highway 100 crossing of the North Branch of the Hoosic River is a 39-ft-long, two-lane bridge consisting of one 37-foot steel-beam span (Vermont Agency of Transportation, written communication, November 1, 1995). The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 2.5 ft deeper than the mean thalweg depth was observed along the upstream end of the right abutment during the Level I assessment. The only scour protection measure at the site was type-3 stone fill (less than 48 inches diameter) at the downstream ends of the left and right abutments extending downstream along the left bank for 13 feet and along the right bank for 16 feet. The plans show stone fill placed at the upstream ends of the abutments. The protection at the upstream end of the right abutment has failed due to stream migration towards the right bank. The protection at the upstream end of the left abutment was not detected due to the sand/gravel pile, for District 1 maintenance, migrating into the channel (Figure 3). Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.6 to 3.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 14.4 to 17.8 ft. Right abutment scour ranged from 8.1 to 11.1 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 71 (WODSTH00050071) on Town Highway 5, crossing Kedron Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00050071 on Town Highway 5 crossing Kedron Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 16.1-mi 2 drainage area is in a predominantly rural and forested basin. However, the bridge site is within the Village of Woodstock. In the vicinity of the study site, the surface cover is best described as suburban downstream of the bridge and forest and brush upstream of the bridge. In the study area, Kedron Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 33 ft and an average bank height of 11 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 112 mm (0.368 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 14, 1994, indicated that the reach was vertically degraded. Evidence of the degradation was observed at the outlet of the bridge where the stream bed is 4 ft below the downstream invert of the structure (see figure 6). The Town Highway 5 crossing of Kedron Brook is a 30-ft-long, two-lane bridge/box culvert consisting of one 25-foot concrete span (Vermont Agency of Transportation, written communication, August 3, 1994). The opening length of the structure parallel to the bridge face is 23.5 ft.The bridge is supported by vertical, concrete abutments with wingwalls. The channel bed under the bridge is covered entirely by a concrete slab. The channel is skewed approximately 45 degrees to the opening and the opening-skew-to-roadway is also 45 degrees. Scour countermeasures at the site include concrete retaining walls on both the left and right downstream banks extending approximately 130 ft downstream; a drywall constructed of stone on the upstream right bank extending to the next bridge upstream; type-2 stone fill (less than 36 inches diameter) along the upstream left bank, at the upstream end of the upstream right wingwall, and along the base of the retaining wall on the downstream left bank; and type-3 stone-fill (less than 48 inches diameter) along the base of the retaining wall on the downstream right bank. In addition, the channel under the bridge is concrete. Further details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. The contraction scour depths do not take the concrete channel bed under the bridge into account. Abutment scour ranged from 8.7 to 18.2 ft. The worstcase abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Geographic information systems (GIS) spatial data compilation of geodynamic, tectonic, metallogenic, mineral deposit, and geophysical maps and associated descriptive data for northeast Asia

This is the online version of a CD-ROM publication. It contains all of the data that are on the disc but extra files have been removed: index files, software installers, and Windows autolaunch files. The purpose of this publication is to provide a high-quality spatial data compilation (Geographical Information System or GIS) of geodynamic, mineral deposit, and metallogenic belt maps, and descriptive data for Northeast Asia for customers and users. This area consists of Eastern Siberia, Russian Far East, Mongolia, northern China, South Korea, and Japan. The GIS compilation contains integrated spatial data for: (1) a geodynamics map at a scale of 1:5,000,000; (2) a mineral deposit location map; (3) metallogenic belt maps; (4) detailed descriptions of geologic units, including tectonostratigraphic terranes, cratons, major melange zones, and overlap assemblages, with references; (5) detailed descriptions of metallogenic belts with references; (6) detailed mineral deposit descriptions with references; and (7) page-size stratigraphic columns for major terranes.

Open-File Report↗

System requirements specification for the U.S. Geological Survey's National Water Information System II

The U.S. Geological Survey's Water Resources Division is designing and developing a new computer software system for processing and storing hydrologic data. This system, the National Water Information System (NWIS-II) will replace the current water-data and information systems: the National Water Data Storage and Retrieval System (WATSTORE), the National Water Data Exchange (NAWDEX), and the National Water-Use Information System, as well as the current National Water Information System (NWIS-I). The new system will be utilized across the Nation on the Distributed Information System (DIS-II), a network of 32-bit microcomputers on a wide-area network of desktop workstations and related hardware. The purpose of the NWIS-II System Requirements Specification is to integrate requirements described by eight User Groups representing the disciplines for Surface Water, Ground Water, Water Quality, Water Sediment, Water Use, Biology, Geographic Information, and National Water Data Exchange. The requirements specified in this document will serve as the framework for subsequent design and development activities throughout the life cycle of NWIS-II to ensure that the development products reflect the needs of the users. Specification details and associated data-base plans are contained in the description of the integrated functional requirements, the logical data model and the data dictionary, the plan for transferring data from the existing system to NWIS-II, and the descriptions of performance requirements and design constraints. The NWIS-II will be consistent across hydrologic disciplines and the other major Division software systems. The color-graphics desktop environment of NWIS-II will utilize multi-window and multi-tasking capabilities with multilevel of help for the users. Data will be distributed among nodes and be automatically accessible during input, editing, verification and analysis of data. Hydrologic data will be cataloged independent of the Environmental Protection Agency's storage and retrieval (STORET) codes. Character, digital, and graphical data will be entered into NWIS-II from digital and analog recorders, external files, or keyboard through standard and user-defined input forms. Data will be verified manually or automatically during input, retrieval, and editing of data. Numerous reference lists will be maintained so that entry of codes on forms will not be required. User-defined series of computer actions for standard programs will be supported for processing basic data and other frequently repeated processes. Data will be verified and exchanged through links to other DIS-II software, including a Geographic Information System, and selected external software. Quality assurance of data will include aging of data through change on status type and tracking access violations. Output of data will be to a variety of media in standard and user-defined formats. The data base will be preserved by operations such as backup, recovery, audit trails, archiving, and data histories. In addition, an index of water data from USGS and other agencies will be maintained.

Open-File Report↗

Level II scour analysis for Bridge 99 (LUDLVT01000099) on State Highway 99, crossing Branch Brook, Ludlow, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure LUDLVT01000099 on State Highway 100 crossing Branch Brook, Ludlow, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 15.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the channel banks are densely covered by trees and brush. The overbanks are primarily covered by field grasses. In the study area, Branch Brook has an incised, straight channel with a slope of approximately 0.003 ft/ft, an average channel top width of 73 ft and an average channel depth of 5 ft. The predominant channel bed materials are cobble and gravel with a median grain size (D 50 ) of 60.5 mm (0.198 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 13, 1995, indicated that the reach was stable. The State Highway 100 crossing of Branch Brook is a 84-ft-long, two-lane bridge consisting of one 82-foot steel-beam span (Vermont Agency of Transportation, written communication, March 13, 1995). The bridge is supported by vertical, concrete abutments. The abutments are set back from the channel edge and have a spill-through slope consisting of type-4 stone fill (median size less than 60 inches in diameter). The channel skew and the opening-skew-to-roadway is zero degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.5 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 1.0 to 7.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 39 (ANDOVT00110039) on State Route 11, crossing the Middle Branch Williams River, Andover, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110039 on State Route 11 crossing the Middle Branch Williams River, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southern Vermont. The 5.75-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream left bank and downstream right bank. The surface cover on the upstream right and downstream left banks is brush. In the study area, the Middle Branch Williams River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 58 ft and an average bank height of 8 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 96.8 mm (0.317 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 9, 1996, indicated that the reach was laterally unstable. The State Route 11 crossing of the Middle Branch Williams River is a 43-ft-long, two-lane bridge consisting of one 41-foot concrete-beam span and two additional steel beams on the upstream face (Vermont Agency of Transportation, written communication, March 29, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is 45 degrees. The only scour protection measures at the site was type-2 stone fill (less than 36 inches diameter) at the upstream end of the upstream right wingwall and type-3 stone fill (less than 48 inches diameter) along the entire base length of the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.9 to 11.2 ft. The worst-case abutment scour occurred at the incipient-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 8 (ATHETH00090008) on Town Highway 9, crossing Bull Creek, Athens, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ATHETH00090008 on Town Highway 9 crossing Bull Creek in Athens, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 9.04-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left overbank surface cover is shrub and brushland and the right overbank surface cover is pasture. In the study area, Bull Creek has an sinuous channel with a slope of approximately 0.01 ft/ ft, an average channel top width of 41 ft and an average bank height of 4 ft. The predominant channel bed materials are cobbles and gravel with a median grain size (D 50 ) of 72.1 mm (0.236 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 14, 1996, indicated that the reach was laterally unstable. There are several point bars and cut banks along the reach in the vicinity of this site. The Town Highway 9 crossing of Bull Creek is a 32-ft-long, one-lane bridge consisting of one 28-foot steel-beam span (Vermont Agency of Transportation, written communication, April 5, 1995). The bridge is supported by vertical, “laid-up” stone abutments with concrete caps and no wingwalls. The channel is skewed approximately 15 degrees to the opening. The VTAOT bridge records indicate the opening-skew-to-roadway is 9 degrees while that computed from surveyed points is 5 degrees. A scour hole 1.75 feet deeper than the mean thalweg depth was observed under the bridge during the Level I assessment. The scour hole has lowered the streambed along the entire length of the left abutment and the upstream end of the right abutment. The scour depth at each abutment wall is 0.75 feet deeper than the mean thalweg depth elsewhere in the reach. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) on the upstream banks and downstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.4 feet. The worst-case contraction scour occurred at the incipient-overtopping discharge of 1730 cubic feet per second, which was less than the 100-year discharge. Abutment scour ranged from 7.6 to 11.4 feet. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 34 (WWINTH00370034) on Town Highway 37, crossing Mill Brook, West Windsor, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WWINTH00370034 on Town Highway 37 crossing Mill Brook, West Windsor, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 16.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture except for the upstream left bank where there is mostly shrubs and brush. In the study area, Mill Brook has a sinuous channel with a slope of approximately 0.003 ft/ ft, an average channel top width of 52 ft and an average bank height of 5 ft. The channel bed material ranges from sand to cobbles with a median grain size (D 50 ) of 43.4 mm (0.142 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 5, 1996, indicated that the reach was laterally unstable. Point bars were observed upstream and downstream of this site. Furthermore, slip failure of the bank material was noted downstream at a cut-bank on the left side of the channel across from a point bar. The Town Highway 37 crossing of Mill Brook is a 37-ft-long, one-lane covered bridge consisting of one 32-foot wood thru-truss span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 29.6 ft. The bridge is supported by vertical, laid-up stone abutment walls with concrete facing and laid-up stone wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. Scour protection measures at the site included type-3 (less than 48 inches diameter) and type-4 (less than 60 inches diameter) stone fill. Type-3 stone fill was observed along the upstream right bank and along the right abutments. Type-4 stone fill was observed at the upstream end of the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. There was no contraction scour predicted for any of the modeled flows. Abutment scour at the left abutment ranged from 5.7 to 7.3 ft, while that at the right abutment ranged from 11.6 to 17.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results.” Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 46 (CHELTH00680046) on Town Highway 68, crossing the First Branch of the White River, Chelsea, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHELTH00680046 on town highway 68 crossing the First Branch of the White River, Chelsea, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of central Vermont in the town of Chelsea. The 58.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, the First Branch of the White River has a sinuous channel with a slope of approximately 0.0054 ft/ft, an average channel top width of 92 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobble (D 50 is 52.7 mm or 0.173 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 16, 1994, indicated that the reach was stable. The town highway 68 crossing of the First Branch of the White River is a 61-ft-long, onelane covered bridge with a 52-foot clear-span (Vermont Agency of Transportation, written commun., August 26, 1994). The bridge is supported by vertical, stone abutments with a concrete wingwall on the downstream right. The left abutment is laid-up stone supported by concrete at the upstream and downstream ends of the laid-up stone abutment. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed under the bridge during the Level I assessment. The scour protection measures in place at the site were type- 2 stone fill (less than 36 inches diameter) at the road approach embankments except the downstream left embankment which had no protection. The upstream right road embankment, impacted by the channel bend, has an extensive covering of stone fill for erosion protection. Type-3 stone fill (less than 48 inches diameter) was noted along the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.9 to 2.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 14.3 to 24.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The left abutment sits atop a bedrock outcrop. The results of the calculated scour depths will be limited by the bedrock. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 108 (STJOUS00020108) on U.S. Highway 2, crossing the Moose River, St. Johnsbury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STJOUS00020108 on U.S. Highway 2 crossing the Moose River, St. Johnsbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland/White Mountain sections of the New England physiographic province in north-east Vermont. The 117-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the upstream right bank, forest on the upstream left bank, shrub and brush on the downstream left bank, and forest on the downstream right bank. In the study area, the Moose River has an incised, sinuous channel with a slope of approximately 0.008 ft/ft, an average channel top width of 96 ft and an average channel depth of 6 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 94.1 mm (0.309 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 14, 1995, indicated that the reach was stable. The U.S. Highway 2 crossing of the Moose River is a 103-ft-long, two-lane bridge consisting of three spans with a maximum 57-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 28, 1995). The bridge is supported by two piers, and vertical, concrete abutments with no wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) at the upstream and downstream channel banks. There is also type-3 stone fill (less than 48 inches diameter) at both the upstream and downstream ends of the left and right abutments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.4 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 9.3 to 12.2 ft. The worst-case abutment scour occurred at the left abutment 500-year discharge. Pier scour ranged from 8.3 to 15.7 for both piers. The worst case pier scour occurred at the left pier, for the 100-year discharge analysis. Additional in formation on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross- section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Topographic and Hydrographic GIS Datasets for the Afghanistan Geological Survey and U.S. Geological Survey 2014 Mineral Areas of Interest

Mineral extraction and associated industries play an important role in the Afghan economy, particularly in the “transitional era” of declining foreign aid and withdrawal of foreign troops post 2014. In addition to providing a substantial source of government revenue, other potential benefits of natural resource development include boosted exports, employment opportunities, and strengthened industrialization (Joya, 2012). Continued exploration and investment in these industries has resulted in large economic improvements since 2007, when this series of studies was initiated. At that time, the “Preliminary Non-Fuel Mineral Resource Assessment of Afghanistan” was completed by members of the U.S. Geological Survey and Afghanistan Geological Survey (Peters and others, 2007). The assessment published a series of country-wide datasets, including a digital elevation model (DEM), elevation contours, hydrography, transportation routes, geophysics, and cultural datasets (Peters and others, 2007). It also delineated 20 mineralized areas for further study using a geologic-based methodology. A second data product, “Summaries of Important Areas for Mineral Investment and Production Opportunities of Nonfuel Minerals in Afghanistan,” was released by Peters and others in 2011. This work highlighted geologic, geohydrologic, and hyperspectral studies that were carried out in specific Areas of Interest (AOIs) to assess the location and characteristics of mineral resources. Also included in the 2011 publication is a collection of appendixes and inventories of Geographic Information System (GIS) datasets for each of the 24 identified AOIs. A third data product was released in 2013 (Casey and Chirico, 2013), publishing datasets for five different AOIs, two subareas, and one AOI extension. Each dataset contains vector shapefiles of the AOI boundary, streams, roads, and contours at 25-, 50-, and 100-meter (m) intervals, as well as raster files of the AOI’s DEM and hillshade. This work represents the fourth installment of the series, and publishes a dataset of eight new AOIs and one subarea within Afghanistan. These areas include Dasht-e-Nawar, Farah, North Ghazni, South Ghazni, Chakhansur, Godzareh East, Godzareh West, and Namaksar-e-Herat AOIs and the Central Bamyan subarea of the South Bamyan AOI (datasets for South Bamyan were published previously in Casey and Chirico, 2013). For each AOI and subarea, this dataset collection consists of the areal extent boundaries, elevation contours at 25-, 50-, and 100-m intervals, and an enhanced DEM. Hydrographic datasets covering the extent of four AOIs and one subarea are also included in the collection. The resulting raster and vector layers are intended for use by government agencies, developmental organizations, and private companies in Afghanistan to support mineral assessments, monitoring, management, and investment.

Open-File Report↗

Level II scour analysis for Bridge 49 (WODSTH00990049) on Town Highway 99, crossing Gulf Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00990049 on Town Highway 99 crossing the Gulf Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 16.8-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the primary surface cover is pasture except for upstream right of the bridge which is cover by trees and brush. The immediate banks throughout the reach have scattered woody vegetation. In the study area, the Gulf Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 91 ft and an average channel depth of 6 ft. The channel bed materials range from sand to cobble with a median grain size (D 50 ) of 85.3 mm (0.280 ft). The geomorphic assessment at the time of the Level I site visits on September 15, 1994 and December 14, 1994, indicated that the reach was stable. The Town Highway 99 crossing of the Gulf Brook is a 56-ft-long, one-lane bridge consisting of one 55-foot steel-beam span (Vermont Agency of Transportation, written communication, April 4, 1995). The bridge is supported by vertical, concrete abutments with a spill-through slope constructed of large quarried stone. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Erosion at the right abutment has undermined the toe of the spill-through slope by nearly a foot. Material has been removed from under the stone spill-through slope so that 0.5 feet of horizontal penetration was possible at the time of the visits. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.9 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour at the left abutment ranged from 3.1 to 10.3 ft. with the worst-case occurring at the 500-year discharge. Abutment scour at the right abutment ranged from 6.4 to 10.4 ft. with the worst-case occurring at the 100-year discharge.Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 137 (FERRUS00070137) on U.S. Route 7, crossing Little Otter Creek, Ferrisburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FERRUS00070137 on U.S. Route 7 crossing Little Otter Creek, Ferrisburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Champlain section of the St. Lawrence Valley physiographic province in northwestern Vermont. The 56.7-mi 2 drainage area is in a predominantly rural and forested basin with some pasture on the valley bottom. In the vicinity of the study site, the surface cover consists of pasture upstream of the bridge. Downstream of the bridge the surface cover consists of trees, shrubs, and grass. In the study area, Little Otter Creek has a meandering channel with a slope of approximately 0.007 ft/ft, an average channel top width of 86 ft and an average channel depth of 3 ft. The predominant channel bed materials are cobbles and gravel with a median grain size (D 50 ) of 54.9 mm (0.180 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 1, 1996, indicated that the reach was laterally unstable. The U.S. Route 7 crossing of Little Otter Creek is a 157-ft-long, two-lane bridge consisting of three steel-beam spans (Vermont Agency of Transportation, written communication, December 12, 1995). The bridge is supported by vertical, concrete abutment walls with spill-through embankments in front of each abutment wall and two solid concrete piers. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is zero degrees. The scour protection measures at the site consist of type-3 stone fill (less than 48 inches diameter) on the banks upstream and downstream of the bridge and the lower half of the spill-through embankment slopes on each abutment. Type-1 stone fill (less than 12 inches diameter) protects the upper half of the spill-through embankments and each roadway embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.8 to 2.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 10.4 to 14.9 ft. The worst-case abutment scour occurred at the 500-year discharge. There are two piers for which computed pier scour ranged from 7.5 to 13.4 ft. The left and right piers in this report are presented as pier 1 and pier 2 respectively. The worst-case pier scour occurred at pier 1 for the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 19 (CHARTH00390019) on Town Highway 39, crossing Mad Brook, Charleston, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHARTH00390019 on Town Highway 39 crossing Mad Brook, Charleston, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I investigation also are included in this report in Appendix E. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the White Mountain section of the New England physiographic province in northeastern Vermont in the town of Charleston. The 6.54-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest except for the upstream left side which is covered primarily with shrubs and brush. The immediate banks have dense woody vegetation. In the study area, Mad Brook has an incised, sinuous channel with a slope of approximately 0.023 ft/ft, an average channel top width of 40 ft and an average channel depth of 4 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 135.0 mm (0.443 ft). The geomorphic assessment on October 26, 1994 indicated that the reach was laterally unstable due to long-term lateral migration of the channel. Data collection for the level II analysis was accomplished on October 26, 1994 and July 24, 1995. The Town Highway 39 crossing of Mad Brook is a 34-ft-long, two-lane bridge consisting of one 31-foot steel-beam span (Vermont Agency of Transportation, written communication, August 4, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 45 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. The scour protection measures evident at the site were type-2 stone fill (less than 36 inches diameter) on the upstream left wingwall and upstream end of the left abutment wall. Type-3 stone fill (less than 48 inches diameter) was noted on the upstream right wingwall and the upstream side of the left road approach embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was 0.0 ft. Abutment scour ranged from 9.5 to 16.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 10 (WNDHTH00020010) on Town Highway 2, crossing the Middle Branch of the Williams River, Windham, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WNDHTH00020010 on Town Highway 2 crossing the Middle Branch Williams River, Windham, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south central Vermont. The 1.44-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the predominate surface cover upstream of the bridge is pasture on the left bank and forest on the right bank. Downstream of the bridge the surface cover consists of forest on the right bank and grass on the left bank. In the study area, the Middle Branch Williams River has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 28 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 61.4 mm (0.201 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 22, 1996, indicated that the reach was stable. The Town Highway 2 crossing of the Middle Branch Williams River is a 25-ft-long, two-lane bridge consisting of one 22-foot concrete slab span (Vermont Agency of Transportation, written communication, March 31, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 60 degrees to the opening while the opening-skew-to-roadway is 50 degrees. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along both upstream banks. The scour protection measures downstream were type -1 stone fill (less than 12 inches diameter) on the left bank and type-3 stone fill (less than 48 inches diameter) on the right bank. Scour protection measures do not exist underneath the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for modelled flows ranged from 0.9 to 2.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.5 to 8.8 ft along the right abutment and from 8.7 to 10.1 ft along the left abutment. The worst-case abutment scour at the right abutment occurred at the 100-year discharge and at the left abutment at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 32 (FERRTH00190032) on Town Highway 19, crossing the South Slang Little Otter Creek, Ferrisburgh, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FERRTH00190032 on Town Highway 19 crossing the South Slang Little Otter Creek (Hawkins Slang Brook), Ferrisburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Champlain section of the St. Lawrence Valley physiographic province in west-central Vermont. The 8.00-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of wetlands upstream and downstream of the bridge with trees and pasture on the wide flood plains. In the study area, the South Slang Little Otter Creek has a meandering channel with essentially no channel slope, an average channel top width of 932 ft and an average bank height of 6 ft. The channel bed material ranges from clay to sand. Sieve analysis indicates that greater than 50% of the sample is coarse silt and clay and thus a medium grain size by use of sieve analysis was indeterminate. The median grain size was assumed to be a course silt with a size (D 50 ) of 0.061mm (0.0002 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 2, 1996, indicated that the reach was stable. The Town Highway 19 crossing of the South Slang Little Otter Creek is a 45-ft-long, twolane bridge consisting of one 42-foot concrete box-beam span (Vermont Agency of Transportation, written communication, December 11, 1995). The opening length of the structure parallel to the bridge face is 41.8 ft. The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 3.5 ft deeper than the mean thalweg depth was observed in the upstream channel. Also a scour hole 2.0 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. The scour protection measures at the site are type-1 stone fill (less than 12 inches diameter) around the left and right abutments, along the upstream and downstream road embankments, and across the entire upstream and downstream bridge face. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 14.0 to 20.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.2 to 8.3 ft. The worst-case abutment scour occurred at the 500-year discharge. The predicted scour is well above the pile bottom elevations. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗