Geology Reports⌕ Search

SEARCH · Geology Reports

Results for “Mining Geology”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36Linked to original sources

Preliminary geotechnical and geophysical logs from drill hole 2C-80 in the Capps coal field, Cook Inlet region, Alaska

The drilling and logging information provided in this report was collected during September 1980 as part of the Energy Lands program of the U.S. Geological Survey. Drill hole 2C-80 is located in the Capps Coal Field, approximately 100 km (62 mi) west of Anchorage, Alaska (fig. 1). The drilling was undertaken to obtain information on the geotechnical characteristics of a part of the coal-bearing Tyonek Formation and overlying surficial deposits. The preliminary results of a previous drill hole (1C-79), located 1.3 km (0.8 mi) northeast of drill hole 2C-80, were reported by Chleborad and others (1980). The Tyonek Formation is early Oligocene to middle Miocene in age (Wolfe and Tanai, 1980). At the drill site it is overlain by a thin colluvial deposit of Quaternary age. The drilling and continuous core sampling penetrated 19.5 m (63.9 ft) of overburden, a major coal bed (Waterfall bed), and approximately 29 m (95.1 ft) of underlying material, to a total depth of 61 m (200 ft). Drill hole 2C-80 stratigraphically overlaps drill hole 1C-79 and continues down section approximately 33 m (108 ft). A proposed open pit coal-mining plan (Placer Amex, Inc., 1977, status report of December 1977) outlines a sequential mining and reclamation scheme for five areas in the Capps Coal Field. Figure 2 shows the location of drill holes 2C-80 and 1C-79 with respect to the proposed mining areas as well as selected surface features. A general description of the geology and natural hazards of the region are given by Schmoll and others (1981). The generalized lithology interpreted from core obtained from drilling and supplemented by outcrop mapping accomplished during the 1979 and 1980 field seasons is presented in figure 3. A more detailed lithologic log is presented as part of the geotechnical log. The geotechnical and geophysical logs presented herein (pls. 1 and 2) provide basic physical-property and engineering data useful in predicting the response of geologic materials to proposed large-scale coal mining and related development, and in identifying and assessing potential geologic hazards.

Alaska↗

Front matter: Preface, acknowledgements, table of contents

This volume is the fifth in a series of reports by the U.S. Geological Survey (USGS) on the assessment of the quantity and quality of the nation’s coal deposits that potentially could be mined during the next few decades. For eight years (1995-2003), geologic, geochemical, and resource information was collected and compiled for the five major coal-producing regions of the United States: the Appalachian Basin, Illinois Basin, Northern Rocky Mountains and Great Plains, Colorado Plateau, and the western part of the Gulf of Mexico Coastal Plain (Gulf Coast) region. The results of these other USGS coal assessments may be found at: http://energy.cr.usgs.gov/coal/coal_assessments/ index.html and a summary of the results from all assessment areas can be found in Ruppert et al. (2002) and Dennen (2009). This volume contains the assessment results for the Gulf Coast region. The contents of this volume were compiled mainly during the eight-year period mentioned above. However, every effort has been made to update the references and text to incorporate new work that has been completed since the original compilation period.

AAPG Studies in Geology↗

Terrestrial wildlife in the post-mined Appalachian landscape: Status and opportunities

Coal mining is an anthropogenic stressor that has impacted terrestrial and semi-aquatic wildlife in the Appalachian Plateau since European settlement. Creation of grassland and early-successional habitats resulting from mining in a forested landscape has resulted in novel, non-analog habitat conditions. Depending on the taxa, the extent of mining on the landscape, and reclamation practices, effects have ranged across a gradient of negative to positive. Forest-obligate species such as woodland salamanders and forest-interior birds or those that depend on aquatic systems in their life cycle have been most impacted. Others, such as grassland and early-successional bird species have responded favorably. Some bat species, as an unintended consequence, use legacy deep mines as winter hibernacula in a region with limited karst geology. Recolonization of impacted wildlife often depends on life strategies and species’ vagility, but also on altered or arrested successional processes on the post-surface mine landscape. Many wildlife species will benefit from Forest Reclamation Approach practices going forward. In the future, managers will be faced with decisions about reforestation versus maintaining open habitats depending on the conservation need of species. Lastly, the post-mined landscape currently is the focal point for a regional effort to restore elk ( Cervus canadensis ) in the Appalachians.

Appalachian Plateau↗

Understanding processes affecting mineral deposits in humid environments

Recent interdisciplinary studies by the U.S. Geological Survey have resulted in substantial progress toward understanding the influence that climate and hydrology have on the geochemical signatures of mineral deposits and the resulting mine wastes in the eastern United States. Specific areas of focus include the release, transport, and fate of acid, metals, and associated elements from inactive mines in temperate coastal areas and of metals from unmined mineral deposits in tropical to subtropical areas; the influence of climate, geology, and hydrology on remediation options for abandoned mines; and the application of radiogenic isotopes to uniquely apportion source contributions that distinguish natural from mining sources and extent of metal transport. The environmental effects of abandoned mines and unmined mineral deposits result from a complex interaction of a variety of chemical and physical factors. These include the geology of the mineral deposit, the hydrologic setting of the mineral deposit and associated mine wastes, the chemistry of waters interacting with the deposit and associated waste material, the engineering of a mine as it relates to the reactivity of mine wastes, and climate, which affects such factors as temperature and the amounts of precipitation and evapotranspiration; these factors, in turn, influence the environmental behavior of mineral deposits. The role of climate is becoming increasingly important in environmental investigations of mineral deposits because of the growing concerns about climate change.

Fact Sheet↗

Methods for Estimating Water Withdrawals for Mining in the United States, 2005

The mining water-use category includes groundwater and surface water that is withdrawn and used for nonfuels and fuels mining. Nonfuels mining includes the extraction of ores, stone, sand, and gravel. Fuels mining includes the extraction of coal, petroleum, and natural gas. Water is used for mineral extraction, quarrying, milling, and other operations directly associated with mining activities. For petroleum and natural gas extraction, water often is injected for secondary oil or gas recovery. Estimates of water withdrawals for mining are needed for water planning and management. This report documents methods used to estimate withdrawals of fresh and saline groundwater and surface water for mining during 2005 for each county and county equivalent in the United States, Puerto Rico, and the U.S. Virgin Islands. Fresh and saline groundwater and surface-water withdrawals during 2005 for nonfuels- and coal-mining operations in each county or county equivalent in the United States, Puerto Rico, and the U.S. Virgin Islands were estimated. Fresh and saline groundwater withdrawals for oil and gas operations in counties of six states also were estimated. Water withdrawals for nonfuels and coal mining were estimated by using mine-production data and water-use coefficients. Production data for nonfuels mining included the mine location and weight (in metric tons) of crude ore, rock, or mineral produced at each mine in the United States, Puerto Rico, and the U.S. Virgin Islands during 2004. Production data for coal mining included the weight, in metric tons, of coal produced in each county or county equivalent during 2004. Water-use coefficients for mined commodities were compiled from various sources including published reports and written communications from U.S. Geological Survey National Water-use Information Program (NWUIP) personnel in several states. Water withdrawals for oil and gas extraction were estimated for six States including California, Colorado, Louisiana, New Mexico, Texas, and Wyoming, by using data from State agencies that regulate oil and gas extraction. Total water withdrawals for mining in a county were estimated by summing estimated water withdrawals for nonfuels mining, coal mining, and oil and gas extraction. The results of this study were distributed to NWUIP personnel in each State during 2007. NWUIP personnel were required to submit estimated withdrawals for numerous categories of use in their States to a national compilation team for inclusion in a national report describing water use in the United States during 2005. NWUIP personnel had the option of submitting the estimates determined by using the methods described in this report, a modified version of these estimates, or their own set of estimates or reported data. Estimated withdrawals resulting from the methods described in this report may not be included in the national report; therefore the estimates are not presented herein in order to avoid potential inconsistencies with the national report. Water-use coefficients for specific minerals also are not presented to avoid potential disclosure of confidential production data provided by mining operations to the U.S. Geological Survey.

Scientific Investigations Report↗

Physical exploration for uranium during 1951 in the Silver Reef district, Washington County, Utah

During 1951 a joint exploration program of the most promising uraniferous areas in the Silver Reef district was made by the U.S. Geological Survey and the u.S. Atomic Energy Commission. A U.S. Bureau of Mines drill crew, on contract to the Atomic Energy Commission, did 2,450 feet of diamond drilling under the geological supervision of the U.S. Geological Survey. The purpose of the drilling was to delineate broadly the favorable ground for commercial development of the uranium depostis. Ten drill holes were located around Pumpkin Point, which is the northeastern end of Buckeye Reef, to probe for extensions of small ore shootsmined on the Point in fine-grained sandstones of the Chinle formation. Three additional holes were located around teh Tecumseh Hill to prbe for extensions of the small showings of uranium-bearing rocks of Buckeye Reef.

Utah↗

Geological, geochemical, and geophysical studies by the U.S. Geological Survey in Big Bend National Park, Texas

Big Bend National Park (BBNP), Tex., covers 801,163 acres (3,242 km 2 ) and was established in 1944 through a transfer of land from the State of Texas to the United States. The park is located along a 118-mile (190-km) stretch of the Rio Grande at the United States-Mexico border. The park is in the Chihuahuan Desert, an ecosystem with high mountain ranges and basin environments containing a wide variety of native plants and animals, including more than 1,200 species of plants, more than 450 species of birds, 56 species of reptiles, and 75 species of mammals. In addition, the geology of BBNP, which varies widely from high mountains to broad open lowland basins, also enhances the beauty of the park. For example, the park contains the Chisos Mountains, which are dominantly composed of thick outcrops of Tertiary extrusive and intrusive igneous rocks that reach an altitude of 7,832 ft (2,387 m) and are considered the southernmost mountain range in the United States. Geologic features in BBNP provide opportunities to study the formation of mineral deposits and their environmental effects; the origin and formation of sedimentary and igneous rocks; Paleozoic, Mesozoic, and Cenozoic fossils; and surface and ground water resources. Mineral deposits in and around BBNP contain commodities such as mercury (Hg), uranium (U), and fluorine (F), but of these, the only significant mining has been for Hg. Because of the biological and geological diversity of BBNP, more than 350,000 tourists visit the park each year. The U.S. Geological Survey (USGS) has been investigating a number of broad and diverse geologic, geochemical, and geophysical topics in BBNP to provide fundamental information needed by the National Park Service (NPS) to address resource management goals in this park. Scientists from the USGS Mineral Resources and National Cooperative Geologic Mapping Programs have been working cooperatively with the NPS and several universities on several research studies within BBNP. Because the last geologic map of the entire BBNP was published in the 1960s, one of the primary goals of the USGS is to provide a new geologic map of BBNP at a scale 1:100,000; this work is ongoing among the USGS, NPS, the Texas Bureau of Economic Geology, and university scientists. This USGS Circular summarizes eight studies funded and primarily carried out by the USGS, but it is not intended to be a comprehensive reference of work conducted in BBNP. This Circular describes topical research of the recently completed interdisciplinary USGS project, which has provided information leading to a more complete understanding of the following topics in BBNP: Tectonic and geologic history (Chapters 1, 2, and 3), Age and formation processes of a skarn mineral deposit (Chapter 4), Geoenvironmental effects of abandoned mercury mines (Chapter 5), Age, source, and geochemistry of surface and subsurface water resources (Chapter 6), Isotopic tracing of food sources of bears (Chapter 7), and Geophysical characteristics of surface and subsurface geology (Chapter 8). Additional information and the geochemical and geophysical data of the USGS studies in BBNP are available on line at http://minerals.cr.usgs.gov/projects/big_bend/index.html.

Texas↗

Mass-balance-consistent geological stock accounting: A new approach toward sustainable management of mineral resources

Global resource extraction raises concerns about environmental pressures and the security of mineral supply. Strategies to address these concerns depend on robust information on natural resource endowments, and on suitable methods to monitor and model their changes over time. However, current mineral resources and reserves reporting and accounting workflows are poorly suited for addressing mineral depletion or answering questions about the long-term sustainable supply. Our integrative review finds that the lack of a robust theoretical concept and framework for mass-balance (MB)-consistent geological stock accounting hinders systematic industry-government data integration, resource governance, and strategy development. We evaluate the existing literature on geological stock accounting, identify shortcomings of current monitoring of mine production, and outline a conceptual framework for MB-consistent system integration based on material flow analysis (MFA). Our synthesis shows that recent developments in Earth observation, geoinformation management, and sustainability reporting act as catalysts that make MB-consistent geological stock accounting increasingly feasible. We propose first steps for its implementation and anticipate that our perspective as “resource realists” will facilitate the integration of geological and anthropogenic material systems, help secure future mineral supply, and support the global sustainability transition.

Environmental Science and Technology↗

Suspended-sediment yields from an unmined area and from mined areas before and after reclamation in Pennsylvania, June 1978-September 1983

The U.S. Geological Survey, in cooperation with the Pennsylvania Department of Environmental Resources, has collected hydrologic data from areas in Tioga, Clearfield, and Fayette Counties to determine the effects of surface coal mining on sediment yields. The data were collected from June 1978 through September 1983. Rainfall, streamflow and suspended-sediment data were collected with automatic recording and sampling equipment. Data were collected in Tioga County from an agricultural area that was unaffected by mining and from a forested area prior to surface mining. Data were collected from two areas affected by active surface mining in Tioga County and from an area in Clearfield County being mined by the contour-surface method. Data also were collected from three areas, Tioga, Clearfield, and Fayette Counties, during and after reclamation. The efficiencies of sediment-control pounds in Clearfield and Fayette Counties also were determined. The average annual sediment yield from the agricultural area in Tioga County, which was 35 percent forested, was 0.48 ton per acre per year, and the yield from the forested area prior to mining was 0.0036 ton per acre per year. The average annual sediment yields from the areas affected by active surface mining were 22 tons per acre from the improved haul road and 148 tons per acre from the unimproved haul road. The average annual sediment yield from the site in Clearfield County that had been prepared for mining was 6.3 tons per acre. The average annual sediment yield from the same site while it was being mined by the contour method was 5.5 tons per acre per year. The sediment-control pond reduced the average annual sediment yield to 0.50 ton per acre while the site was prepared for mining and to 0.14 ton per acre while the site was being mined. Because the active surface mining reduced the effective drainage area to the pond, the sediment yield decreased from 0.50 to 0.14 ton per acre. Average annual suspended-sediment yields from the reclaimed site in Tioga County were 1.0 ton per acre during the first year, when vegetation was becoming established, and 0.037 ton per acre during the second year, when vegetation was well established. The average annual sediment yield below a 21.2-acre, reclaimed, surface mine in Clearfield County that had been mined by the contour method was 15 tons per acre during the first year when vegetation was becoming established. However, the average annual sediment yield below a sediment-control pond at this reclaimed site in Clearfield County was 0.30 ton per acre. Data collected from a 4.2-acre reclaimed area that had been surface mined by the block-cut method in Fayette County showed that annual sediment yields from the area were 77 tons per acre in 1981 (no vegetation), 32 tons per acre in 1982 (sparse vegetation), and 1.0 ton per acre in 1983 (well-esatablished vegetation). The average annual yield below a sediment-control pond at the mine site in Fayette County was 0.19 ton per acre during the 27 months of data collection.

Water-Resources Investigations Report↗

Indexes of hydrologic data from selected coal-mining areas in northwestern Colorado

Currently (1988), data from hydrologic studies related to coal mining that have been done in northwestern Colorado since the early 1970 's are stored in the files of private companies and government offices and in various computer systems. To compile these data for additional research, a trip to each office would have to be made to determine the availability and acceptability of the data. The U.S. Geological Survey, in cooperation with the U.S. Bureau of Land Management and the Colorado Mined Land Reclamation Division, has created a database (COALDATA) that includes stream discharge, groundwater levels, and chemical analysis of water samples that were collected by private companies and government agencies other than the U.S. Geological Survey in and near selected coal mines in northwestern Colorado. Indexes in this report list 93 surface water sites and 95 groundwater sites where hydrologic data are available in the COALDATA data base. The indexes also list 62 surface water sites and 480 groundwater sites in the U.S. Geological Survey data base, which is separate from the COALDATA data base and contains only data collected by the U.S. Geological Survey. The combined output of the COALDATA data base and the U.S. Geological Survey data base provides surface water and groundwater data that include most of the study area. (USGS)

Open-File Report↗

Hydrologic change in the St. Louis River Basin from iron mining on the Mesabi Iron Range, northeastern Minnesota

This study compares the results of two regional steady-state U.S. Geological Survey Modular Three-Dimensional Finite-Difference Ground-Water Flow (MODFLOW) models constructed to quantify the hydrologic changes in the St. Louis River Basin from iron mining on the Mesabi Iron Range in northeastern Minnesota. The U.S. Geological Survey collaborated in this study with bands of the Minnesota Chippewa Tribe, and the Minnesota Pollution Control Agency to inform management decisions about aquatic resources in the St. Louis River Basin. A model constructed and calibrated to represent average 1995–2015 mining conditions produced regional groundwater heads and flows. A pre-mining scenario model was constructed from this mining model but had the land and bedrock surfaces restored to pre-mining topographies and had modeled mining features (mine pits, tailings basins, waste-rock piles, and mining-disturbed areas) eliminated to represent general pre-mining stratigraphy and hydrogeology. Many of the features important to the hydrology of this mining area (like individual mine pits) are difficult to represent in groundwater models and required the use of modeling tools to indirectly account for their effects. The difference between the results of these two models represents mining’s effects on the hydrology in the Mesabi Iron Range area of the St Louis River Basin. The mining and pre-mining regional models also can provide boundary conditions and initial properties for future local or site-specific groundwater-flow models in the area. Total groundwater flow through the mining model is 171 million cubic feet per day. Areal recharge is the largest source of groundwater (78 and 81 percent of total groundwater flow in the mining and pre-mining scenario models, respectively). Seepage from streams and lakes provides another 17 percent of the total groundwater flow through both models. Water leaves aquifers through seepage to streams (discharge as base flow, 43 percent in both models) and areal seepage to the land surface (surface seepage), for example to wetlands (45 and 49 percent, mining and pre-mining scenario models respectively). Comparison of the results from the mining and pre-mining scenario models shows that iron mining has produced measurable hydrologic changes in the St. Louis River Basin, but that most of those changes and the highest magnitude changes occur near the mining features. Flow changes to and from surface-water bodies like streams and wetlands were analyzed in detail because of their importance in sustaining surface waters and aquatic life. Overall, groundwater flow in the mining model was 3.62 million cubic feet per day (2.2 percent) greater than total pre-mining model groundwater flow. This was caused by an increase in recharge from tailings basins and a decrease in discharge from surface seepage. Groundwater discharge to mine pits was the largest change in groundwater flows between the models (a change representing 2.8 percent of total pre-mining model groundwater flow). Net recharge to groundwater from tailings basins (2.4 percent), net decrease in surface seepage from groundwater (2.7 percent), and net increase in seepage to streams (1.0 percent) were all in this same range of total pre-mining model groundwater flow. Groundwater lost through mine-pit withdrawals was nearly offset by groundwater gained through recharge from tailings basins. However, because losses and gains occurred in different areas, the effect of mining can have more substantial effects on local areas than the model-wide averages represent.

Minnesota↗

Water-quality, bed-sediment, and biological data, for streams in the upper Prickly Pear Creek watershed, Montana, 2001

The upper Prickly Pear Creek watershed encompasses the upstream 15 miles of Prickly Pear Creek, south of Helena, Montana (fig. 1). The headwaters of Prickly Pear Creek and its tributaries (Beavertown Creek, Clancy Creek, Dutchman Creek, Golconda Creek, Lump Gulch, Spring Creek, and Warm Springs Creek) are primarily in the Helena National Forest, whereas the central part of the watershed primarily is within either Bureau of Land Management (BLM) or privately owned property. Three mining districts are present in the upper Prickly Pear Creek watershed: Alhambra, Clancy, and Colorado. Numerous prospects, adits, tailings piles, mills, dredge piles, and mines (mostly inactive) are located throughout the watershed. These districts contain polymetallic (Ag, Au, Cu, Pb, Zn) vein deposits and precious-metal (Au-Ag) vein and disseminated deposits that were exploited beginning in the 1860’s. Placer Au deposits in the major streams were extensively mined in the late 1800’s and early 1900’s. As part of a cooperative effort with Federal land management agencies, the U.S. Geological Survey (USGS) is currently using an integrated approach to investigate two mining impacted watersheds in the western United States (the Animas River in Colorado and the Boulder River in Montana). These studies provide the USDA Forest Service and BLM scientific data for implementing informed land-management decisions regarding cleanup of abandoned mine lands within each watershed. A similar integrated-science approach will be used to characterize the upper Prickly Pear Creek watershed with respect to water and streambed sediment chemistry, aquatic biota, and geologic framework. This integrated database presents data that will be used to identify important pathways of metals movement and biological impacts, thereby guiding resource management decisions of land-managers in several publications that are in preparation. Watershed-level characterization in terms of water quality, streambed sediment chemistry, and fish health will facilitate determinations of whether removal of contaminated materials or other cleanup activities are necessary, planning of short- and long-term restoration efforts, and development of a monitoring plan to document cleanup effectiveness.

Montana↗

Potential minability and economic viability of the Antaramut-Kurtan-Dzoragukh coal field, north-central Armenia; a prefeasibility study

The U. S. Geological Survey (USGS) conducted a coal resource assessment of several areas in Armenia from 1997 to 1999. This report, which presents a prefeasibility study of the economic and mining potential of one coal deposit found and studied by the USGS team, was prepared using all data available at the time of the study and the results of the USGS exploratory work, including core drilling, trenching, coal quality analyses, and other ongoing field work. On the basis of information currently available, it is the authors? opinion that a small surface coal mine having about a 20-year life span could be developed in the Antaramut-Kurtan-Dzoragukh coal field, specifically at the Dzoragukh site. The mining organization selected or created to establish the mine will need to conduct necessary development drilling and other work to establish the final feasibility study for the mine. The company will need to be entrepreneurial, profit oriented, and sensitive to the coal consumer; have an analytical management staff; and focus on employee training, safety, and protection of the environment. It is anticipated that any interested parties will be required to submit detailed mining plans to the appropriate Armenian Government agencies. Further development work will be required to reach a final decision regarding the economic feasibility of the mine. However, available information indicates that a small, economic surface mine can be developed at this locality. The small mine suggested is a typical surface-outcropstripping, contour mining operation. In addition, auger mining is strongly suggested, because the recovery of these low-cost mining reserves will help to ensure that the operation will be a viable, economic enterprise. (Auger mining is a system in which large-diameter boreholes are placed horizontally into the coal seam at the final highwall set as the economic limit for the surface mining operation). A special horizontal boring machine, which can be imported from Russia, is required for auger mining. Although auger-mining coal reserves do exist, the necessary development work will further verify the extent of these reserves and all of the other indicated reserves. The following items are based on the detailed study reported in this publication. Initial investment.?Following an investment of US $85,000 over a 12-month period in mine development drilling and other activities, a decision must be taken regarding further investment in an ongoing mining operation. If the new data support the opening of the surface mine, __________________________ 1Consultant, 6024 Morning Dew Drive, Austin, TX 78749. 2 U.S. Geological Survey, 956 National Center, Reston, VA 20192 1 2 MINABILITY AND ECONOMIC VIABILITY, ANTARAMUT-KURTAN-DZORAGUKH COAL FIELD the $85,000 development cost is amortized over the first 10 years of mine production. If the new data do not support the opening of the mine, the $85,000 is considered a business development expense that may be written off against profits from other operations for income or other tax purposes or simply as a business loss. Total capital required.?The equipment costs will reach a total of $900,500 which will be amortized over a 7-year period to establish estimated coal mining costs. Estimated working capital costs are $300,000, which will be borrowed. Surface mining reserves.?Approximately 840,200 metric tonnes of surface minable coal reserves at 9.3 m3 of overburden per metric tonne of minable coal is indicated. Recovery of the minable coal at 85 percent will yield 714,000 recoverable metric tonnes of marketable as-mined coal. Auger mining reserves.?Auger-mining reserves of 576,000 metric tonnes are indicated. Recoverable auger-mining reserves of 202,000 metric tonnes (at 35-percent recovery) can be expected. Auger-mining production will vary according to the hole size being used, but, in either case, augering is a very profitable addition to the mining oper

Bulletin↗

Geochemistry of standard mine waters, Gunnison County, Colorado, July 2009

In many hard-rock-mining districts water flowing from abandoned mine adits is a primary source of metals to receiving streams. Understanding the generation of adit discharge is an important step in developing remediation plans. In 2006, the U.S. Environmental Protection Agency listed the Standard Mine in the Elk Creek drainage basin near Crested Butte, Colorado as a superfund site because drainage from the Standard Mine enters Elk Creek, contributing dissolved and suspended loads of zinc, cadmium, copper, and other metals to the stream. Elk Creek flows into Coal Creek, which is a source of drinking water for the town of Crested Butte. In 2006 and 2007, the U.S. Geological Survey undertook a hydrogeologic investigation of the Standard Mine and vicinity and identified areas of the underground workings for additional work. Mine drainage, underground-water samples, and selected spring water samples were collected in July 2009 for analysis of inorganic solutes as part of a follow-up study. Water analyses are reported for mine-effluent samples from Levels 1 and 5 of the Standard Mine, underground samples from Levels 2 and 3 of the Standard Mine, two spring samples, and an Elk Creek sample. Reported analyses include field measurements (pH, specific conductance, water temperature, dissolved oxygen, and redox potential), major constituents and trace elements, and oxygen and hydrogen isotopic determinations. Overall, water samples collected in 2009 at the same sites as were collected in 2006 have similar chemical compositions. Similar to 2006, water in Level 3 did not flow out the portal but was observed to flow into open workings to lower parts of the mine. Many dissolved constituent concentrations, including calcium, magnesium, sulfate, manganese, zinc, and cadmium, in Level 3 waters substantially are lower than in Level 1 effluent. Concentrations of these dissolved constituents in water samples collected from Level 2 approach or exceed concentrations of Level 1 effluent suggesting that water-rock interaction between Levels 3 and 1 can account for the elevated concentration of metals and other constituents in Level 1 portal effluent. Ore minerals (sphalerite, argentiferous galena, and chalcopyrite) are the likely sources of zinc, cadmium, lead, and copper and are present within the mine in unmined portions of the vein system, within plugged ore chutes, and in muck piles.

Colorado↗