Geology ReportsSearch

SEARCH · Geology Reports

Results for “Applied Computing and Geosciences”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,657 records · Page 18Linked to original sources

Geohydrology of the Cross-Florida Barge Canal area, with special reference to the Ocala vicinity

The Cross-Florida Barge Canal route commences at Palatka on the St. Johns River, about 75 miles upstream from the Atlantic Ocean, and extends 110 miles southwestward across Peninsular Florida into deep water in the Gulf of Mexico near Yankeetown. The canal will be equipped with five locks, each 600 feet long and 84 feet wide, and the channel will be a minimum of 12 feet deep and 150 feet wide. From near Ocala northeastward, the canal channel will replace much of the natural channel of the Oklawaha River, and will be excavated into beds of the so-called shallow sand aquifer of Miocene age and younger, which overlies limestone of the Floridan aquifer. Westward from Ocala, most of the canal will be excavated below the potentiometric surface into limestone and dolomite of the Floridan aquifer. Water levels of Rodman, Eureka, and Inglis Pools will be controlled by dams and spillways with the limited exchange of water between the pools and the aquifers. The water levels in the Summit Pools will fluctuate with the natural changes in the ground-water level of the Floridan aquifer, although the stage of the pool will be controlled partly by the stage held in the Eureka Pool. A dynamic inflow-outflow relationship will exist between the Summit Pool and the Floridan aquifer. The Floridan aquifer in the canal area is 1,000 to 1,200 feet thick and consists of limestone and dolomite of middle Eocene Miocene age, including from older to younger, the Lake City, Avon Park, and Ocala limestones plus permeable sandy, dolomitic limestone in the lower part of the Hawthorn Formation. It is possible that most of the flow to the two major springs in the area occurs in the upper 100 feet or so of the aquifer in the Ocala Limestone. The aquifer is underlain by the Oldsmar limestone of early Eocene age and is overlain by sand, clayey sand, clay and shell beds of Miocene through Holocene age, in thickness from a few feet to 300 feet. The permeable beds overlying the Floridan aquifer constitute the shallow aquifer, while the poorly permeable ones act as confining beds where the Floridan aquifer is under artesian conditions. A north-south line drawn separating the head of Silver Springs on the west from the Oklawaha River on the east marks the approximate western limit of a continuous blanket of materials of Miocene-Pliocene(?) age covering the rocks of the Floridan aquifer. East of the line, much of the aquifer is under artesian conditions, particularly in the Oklawaha River valley, although in some areas east of the valley, direct recharge through thick permeable Miocene-Pliocene(?) sands occurs. West of the line, only scattered remnants of a once continuous Miocene-Pliocene(?) cover remain. Lack of the cover is a result of erosion on the crest and flank of the Ocala Uplift, a broad northwest-southeast trending anticlinal upwarp, the axis of which is crossed by the canal route in the Dunnellon area. Over most of this area the Floridan aquifer is unconfined and receives direct recharge through a cover of a few tens of feet of sand and clayey sand of Quaternary age. Tensional stresses during the structural evolution of the Ocala Uplift produced an intersecting system of fractures and normal faults in rocks of the Floridan aquifer. The fractures and faults are important controls for orientation of solution channels and, therefore, for development of ground-water circulation patterns. When the system surface streams, which once drained the Barge Canal area, eroded the poorly permeable Miocene-Pliocene(?) cover from the flanks of the Ocala Uplift, surface runoff was reduced and precipitation began to directly infiltrate the underlying limestones. Now only principal streams remain, such as the Oklawaha and Withlacoochee Rivers and a few short tributaries, while one of the most highly developed subsurface drainage systems in the world has evolved in cavernous limestone of the Floridan aquifer. Two of the larger freshwater springs in the world now discharge from the Floridan aquifer in the canal area. Silver Springs near Ocala discharges an average 531 mgd (million gallons per day) down the 4-mile long Silver River, which flows on poorly permeable beds to the Oklawaha River. Rainbow Springs near Dunnellon discharges on average 468 mgd from numerous orifices in the bed of the 5-mile-long Rainbow River, which flows into the Withlacoochee River. The heads of the springs have migrated to their present positions partly because of a tendency of ground-water levels to decline as permeability in the aquifer is increased due to removal of limestone by solution, and because of mechanical erosion of the limestone in the vicinity of the spring heads. Also, points of principal spring discharges have shifted in the past due to changes in ground-water levels in response to changes in sea level. The subsurface drainage system is continuing to evolve today, as evidenced in part by frequent occurrence of new sinkholes and by the presence of significant amounts of calcium bicarbonate in the spring waters. Rodman Pool, at the east end of the canal, is separated from the Floridan aquifer by poorly permeable materials. The pool's operating water level will be only a few feet above the potentiometric surface at the downstream end, and at or slightly below the potentiometric surface at the upstream end. Little exchange of water between the Rodman Pool and the Floridan aquifer is expected. Eureka Pool, just upstream from Rodman Pool, will also be separated from the Floridan aquifer by poorly permeable beds. However, the stage of the pool will be about 15 feet higher than the natural potentiometric surface at the pool's downstream end, and some seepage into the Floridan aquifer is anticipated through faults and leaky parts of the poorly permeable beds, with a consequent rise in ground-water levels in areas adjacent to the lower end of the pool. Possibilities for particulate contamination of the aquifer will tend to be minimized because of the filtering capacity of the materials through which water must pass to reach the aquifer, although the natural filter will not preclude movement into the aquifer of contaminants which might become dissolved in the pool waters. No significant interchange of water between the pool and the aquifer is expected at the upstream end of the Eureka Pool. Present construction plans indicate an operating stage for Eureka Pool which will range between 38 and 40 feet above mean sea level, although it is possible to dredge the pool deep enough to permit a range in stage of 36 to 40 feet. A backwater effect extending up Silver River from the Eureka Pool is expected to regulate the stage at the head of Silver Springs between 39 and 44 feet above mean sea level if the pool ranges between 36 and 40 feet. If Eureka Pool ranges only between 38 and 40 feet, the range of stage at the head of the springs should be about 41 to 44 feet above mean sea level. From Inglis Lock west, the canal will have direct connection with the Gulf, and canal stage will fluctuate with the Gulf tide. Since the canal stage will be slightly lower than the adjacent ground-water levels along much of the reach, there will be some ground-water inflow to the canal. No significant changes in the existing ground-water regime are expected in the vicinity of Inglis Pool, the first step up in the canal east of the Gulf. Existing ground-water and surface-water levels in the area will not change appreciable, and the natural stage and flow of Rainbow Springs, which will flow by way of Rainbow River into Inglis Pool, should not be affected by canal operations. A possible adverse effect of the canal on the Inglis Pool area could result if sea water is locked up from the Gulf through Inglis Lock. However, the high step of 25 feet at the lock, flushing action of continuous flow from Inglis Pool to the lower reaches of the Withlacoochee River, and use of possible preventive locking procedures should minimize the problem. The potential for adverse effects on the ground-water regime is greatest in the area of the Summit Pool. Through most of the length of the pool, the canal channel will be excavated into limestone of the Floridan aquifer to depths of 12 to 27 feet below the potentiometric surface. Changes that will take place in the ground-water flow system in the Silver Springs drainage area, once the canal is completed, were estimated by flow-net analysis. Variation in aquifer transmissivity was determined by calculating transmissivity in 25 different flow cells surrounding Silver Springs. Transmissivity in the 25 cells averages about 15,600,000 gpd/ft [2,090,000 ft2/day (feet squared)], but transmissivity in the six cells through which the Summit Pool passes ranges from 9,000,000 to 44,000,000 gpd/ft (1,210,000 to 5,900,000 ft2/day). Transmissivity was used to compute static stage of the Summit Pool under given ground-water level conditions. Had the canal existed in May 1968 and had the stage of Eureka Pool been held at 36 feet at the time, the static stage in Summit Pool would have been about 42.1 feet above mean sea level. Thus, a conceptual model of the changes in the potentiometric surface wrought by the finished canal was drawn, and zones of ground-water inflow and outflow were delineated. Most outflow from the Summit Pool to the aquifer should be limited to one 4-mile-long zone along the north side of the pool, about 5 miles south of Silver Springs. It is estimated that a water volume equivalent to about 8 percent of the daily flow of Silver Springs will enter the Summit Pool each day from the southern one-third of the Silver Springs drainage area. A like amount will reenter the aquifer at the main zone of outflow and move toward Silver Springs at an estimated average velocity of about 200 feet per day, if something close to the natural static stage of the pool is maintained by return pumpage of the lockage losses. At a velocity of 200 feet per day, water from the Summit Pool would discharge at Silver Springs about 140 days later. However, any estimate of velocity in the highly cavernous limestone aquifer in the area should be used with caution, because difficult to measure changes in porosity and thickness of major zones of flow may cause large variations in velocity. If all lockage losses are returned to the Summit Pool by pumping from Eureka Pool, no net loss from the Silver Springs drainage area, except for some evaporation from the water surface in the canal and possible leakage around locks, will result from canal operations. The zone of outflow from the Summit Pool to the aquifer will be in a natural potentiometric trough, and the zone of inflow will be in a potentiometric ridge area. The equilibrium water level in the pool will tend to be about 1 foot higher than the altitude of the lowest level in the pre-canal potentiometric trough, and about 2 feet lower than the highest level on the pre-canal potentiometric ridge. West of the Silver Springs drainage area just east of Dunnellon Lock, in the area of a local potentiometric high, the water level in the Summit Pool is expected to be about 15 feet below the natural potentiometric surface. In most areas 2 to 3 miles away from the Summit Pool, effects of the canal on the natural potentiometric surface should be slight. The stage of the Summit Pool, judging from the 36-year record for ground-water level changes and the anticipated indirect effect of the controlled stage in Eureka Pool, should have a maximum of about 10.5 feet with a maximum water level of about 51.5 feet above mean sea level and a minimum of about 41.0 feet above mean sea level. Of particular importance in the Summit Pool is an implementation of well planned construction and operational procedures designed to minimize risks of ground-water contamination.

Florida

Treatability study to evaluate bioremediation of trichloroethene at Site K, former Twin Cities Army Ammunition Plant, Arden Hills, Minnesota, 2020–22

Executive Summary Chlorinated solvents, including trichloroethene (TCE) and other chlorinated volatile organic compounds (cVOCs), are widespread contaminants that can be treated by bioremediation approaches that enhance anaerobic reductive dechlorination. Reductive dechlorination can be enhanced either through the addition of an electron donor (biostimulation) or the addition of a known dechlorinating culture (bioaugmentation) along with an electron donor. Although bioremediation has been applied at many TCE-contaminated groundwater sites, application in source zones at sites where residual dense nonaqueous phase liquid (DNAPL) is present is more limited. In this study, laboratory and field treatability tests were completed to evaluate the potential application of anaerobic bioremediation for a shallow groundwater plume containing TCE in a perched alluvial aquifer at Site K, former Twin Cities Army Ammunition Plant, Arden Hills, Minnesota, which was on the National Priorities List as the New Brighton/Arden Hills Superfund site until 2019. In addition to the presence of residual DNAPL at the site, temporal variability in groundwater flow directions and input of oxygenated recharge were possible complicating factors for the application of enhanced anaerobic biodegradation in the shallow plume. The Site K plume extends beneath the footprint of Building 103, which was demolished in 2006, and soil excavations to a maximum depth of 6 feet (ft) below ground surface in 2014 were known to leave some deeper contaminated soil in place in the TCE source area. Groundwater treatment at the site, formalized as part of the 1997 Record of Decision, has been in operation since 1986 and consists of an extraction trench at the downgradient edge of the plume to collect groundwater, which is then pumped to an on-site air stripper. Groundwater concentrations in the plume have been relatively stable since treatment began, indicating a continued source of TCE in the aquifer. The desire for a destructive remedy that would enhance the removal of cVOCs in the aquifer at Site K and shorten the remediation timeframe led the U.S. Army to request that the U.S. Geological Survey conduct a groundwater treatability study to assess bioremediation. This report describes the U.S. Geological Survey bioremediation treatability study conducted during 2020–22, including pre-design site characterization to assist in formulating the bioremediation approach, laboratory experiments to support the design of the field pilot test, and implementation and 1-year performance monitoring results for the pilot test. Pre-design site characterization included the collection of soil cores for cVOC analysis and lithologic descriptions and the re-installment of three wells to obtain hydrologic measurements and initial groundwater chemistry. Relatively flat head gradients were measured at the site, and substantial decreases in water-level elevations occurred from spring to summer (May–July 2021). Continuous water-level monitoring indicated a rapid response to precipitation. Groundwater flow velocities were consistently less than 0.5 foot per day, and the pilot bioremediation test was therefore designed with short lateral distances (about 5 ft) between injection and individual monitoring points. Soil analyses confirmed that high volatile organic compound contamination was left in place in the source area. The highest concentrations were near or in clay at the base of the perched aquifer. Concentrations of cVOCs measured in the replaced wells were consistent with historical data and had a maximum TCE concentration of 57,700 micrograms per liter (μg/L), indicative of nearby residual DNAPL based on the general rule of observed concentrations exceeding 1 percent of solubility. The primary TCE daughter product detected was 1,2-cis-dichloroethene (cisDCE), which indicated limited reductive dechlorination in the plume. Groundwater in both the source and downgradient areas was relatively reducing during the pre-design characterization, particularly in the source area where methane concentrations greater than 400 μg/L were measured. Initial laboratory tests conducted using native aquifer microorganisms from the three replacement wells showed that anaerobic TCE biodegradation rates were low when biostimulated with the addition of sodium lactate as an electron donor, also known as a carbon donor, and resulted in the production of only cisDCE. Addition of a known dechlorinating culture, WBC-2, however, resulted in rapid biodegradation and production of ethene, verifying complete reductive dechlorination of TCE. Microcosms constructed with aquifer soil collected from the site were used to evaluate other electron donors besides lactate to support reductive dechlorination by WBC-2, including corn syrup as an alternative fast-release compound and whey, soy-based vegetable oil, and 3-D Microemulsion (Regenesis, San Clemente, California) as slow-release compounds. First-order rate constants for total organic chlorine removal in these WBC-2 amended microcosms were greatest with either lactate or vegetable oil as the donor, ranging between 0.061 and 0.047 per day or corresponding half-lives of 11–15 days. Testing of commercial products in other WBC-2-bioaugmented microcosms led to selection for the field pilot test of an emulsified vegetable oil product that also contained some sodium lactate as a fast-release donor. Delaying the addition of WBC-2 relative to the donor in the microcosms resulted in the most rapid overall biodegradation rates. The selected design for the pilot test utilized three separate test plots, each about 30-ft wide and 60-ft long: plots GS1 and GS2 in the source area of the plume and plot GS3 in the downgradient area of the plume near the excavation trench. Each test plot had one injection well, one monitoring well upgradient from the injection point, and 12 surrounding monitoring wells in a grid to capture variable groundwater flow directions. Donor injections, which included a bromide tracer, were completed in October 2021, immediately following baseline sampling, and the WBC-2 culture was injected about 40 days later, between November 30 and December 2, 2021. Performance monitoring conducted until December 2022 included hydrologic measurements and analyses of cVOCs, redox-sensitive constituents, dissolved organic carbon, bromide, volatile fatty acids, compound-specific carbon isotopes, and microbial communities. The biogeochemical data collected during the pilot tests in the three treatment plots showed that enhanced, complete reductive dechlorination of cVOCs in the groundwater was achieved in the GS1 and GS3 plots. In contrast, evidence of distribution of the injected amendments and subsequent biodegradation was limited in GS2, which was in an area of more heterogeneous soil lithology and low water table elevations. The molar composition of volatile organic compounds in the GS1 and GS3 plots was dominated by ethene in wells that were reached by the injected amendments by the end of the monitoring period. In the GS1 and GS3 plots, similar patterns were observed of cVOC concentrations decreasing to near detection levels, or below, at some wells sampled in July and October 2022, whereas ethene became dominant and indicated sustained complete reductive dechlorination. Baseline cVOC concentrations were more than a factor of 10 higher in the groundwater in the GS1 plot than in GS3, but no apparent inhibition of complete dechlorination occurred. As expected from the initial pre-design site data and the laboratory experiments, enhanced dissolution of residual DNAPL coupled to biodegradation was evident in the GS1 plot, where a marked increase in dichloroethene (DCE) above the initial baseline and upgradient TCE and DCE concentrations occurred. DCE concentrations subsequently declined where DNAPL dissolution was evident, concurrent with production of vinyl chloride and then predominantly ethene. Thus, overall biodegradation rates outpaced the DNAPL dissolution and desorption and DCE production in the source area. This success in complete degradation to predominantly ethene was achieved even in areas where the DCE concentrations reached a maximum of about 30,000 μg/L. Compound specific isotope analysis of carbon in TCE, cisDCE, trans-1,2-dichloroethene, and vinyl chloride was conducted to provide another line of evidence of the occurrence and extent of anaerobic biodegradation. Along a flow path in each plot that was affected by the injected amendments, carbon isotopes in the TCE and daughter cVOCs in the groundwater became isotopically heavier, indicating biodegradation. Enhanced biodegradation rates calculated from the field tests in GS1 and GS3 showed half-lives of 36.9–75.3 days for DCE degradation and 9.48–38.5 days for ethene production. Notably, these ethene production rates calculated from the field tests are consistent with the results of WBC-2-bioaugmented microcosms amended with either lactate or vegetable oil, which had half-lives for total organic chlorine removal that ranged from 11 to 15 days. These rates indicated rapid enhanced biodegradation, which is promising for application of a full-scale bioremediation remedy. Ultimately, however, the mass of residual or sorbed TCE in the aquifer that remains accessible for dissolution and biodegradation would likely control the time required for a full-scale bioremediation effort to achieve performance goals for TCE and cisDCE specified in the Record of Decision for Site K. The field pilot tests showed that the relatively low hydraulic head gradients and temporal changes in groundwater flow directions in the shallow aquifer would add complexity to a full-scale bioremediation effort. The radius of influence (ROI) at GS1 and GS3 (16.3 ft and 12.7 ft, respectively) were close to the design ROI of 15 ft. The estimated ROI at GS2 was about four times the design ROI, but may be less reliable at this location owing to groundwater flow direction. In addition, the low temperatures following WBC-2 injection in late November to early December 2021, in combination with the low hydraulic head gradients, were probably major factors in the delay observed before the onset of enhanced biodegradation following injection of the culture. Additional test injections could be beneficial to optimize the timing of donor and culture injections with the variable temperatures and hydraulic head in the shallow aquifer.

Minnesota

Preliminary geologic map of the Sparta East, Sparta West, and parts of the Glade Valley and Whitehead 7.5-minute quadrangles, North Carolina and Virginia, and the epicentral area of the August 9, 2020, Mw 5.1 earthquake near Sparta, North Carolina

Introduction New bedrock and surficial geologic mapping in the Sparta East, Sparta West, and parts of the Glade Valley and Whitehead 7.5-minute quadrangles, North Carolina and Virginia, investigates the geologic framework and causative mechanisms of the August 9, 2020, Mw 5.1 earthquake near Sparta, North Carolina. The mapping documents (1) the coseismic surface rupture from the 2020 earthquake and related brittle structures in the bedrock; (2) the fault contact between the western Blue Ridge and eastern Blue Ridge; (3) lithostratigraphy in the Lynchburg Group, Ashe Metamorphic Suite, and Alligator Back Metamorphic Suite; (4) the nature of the contact between the Lynchburg Group, Ashe Metamorphic Suite, and Alligator Back Metamorphic Suite; and (5) surficial deposits.

North Carolina, Virginia

2023 Earthquake Ground-Motion Workshop for the Central and Eastern United States, with a focus on the Gulf and Atlantic Coastal Plains—Agenda and abstracts

The U.S. Geological Survey held a virtual workshop December 7–8, 2023, to share research and ideas about earthquake ground motions in the Central and Eastern United States, with a focus on the Atlantic and Gulf Coastal Plains. The workshop was organized to learn about potential regionalization of ground-motion characteristics (source, path, and site), consider new explanatory variables for site response, and hear and discuss updates on ground-motion research on the Atlantic and Gulf Coastal Plains. The workshop was organized into a series of contributed presentations and three panel discussions held during 2 days. This report documents the agenda, contributed abstracts, and panel summaries.

Scientific Investigations Report

Hydrogeologic framework and considerations for drilling and grouting of closed-loop geothermal bores in the Erie-Ontario Lowlands and Allegheny Plateau of New York State

The hydrogeologic framework at closed-loop geothermal sites in the Erie-Ontario Lowlands and Allegheny Plateau of central and western New York is the result of the complex interaction of bedrock geology, glacial geology, and groundwater hydrology, and the occurrence of petroleum and gas. Considerations for closed-loop geothermal bore installation include the thickness and character of glacial deposits, bedrock solubility and depth to competent rock, karst development, the distribution of highly permeable zones and their hydraulic heads, and the presence of saline water, gas, and oil. The hydrogeology of the Erie-Ontario Lowlands and Allegheny Plateau poses challenges to closed-loop geothermal bore drilling and casing; managing drill cuttings, discharge water, and gas; and grouting. The potential to encounter severe challenges typically increases with bore depth. This report highlights hydrogeologic considerations for closed-loop geothermal bore installation in New York’s Erie-Ontario Lowlands and Allegheny Plateau to help guide the efficient and safe development of geothermal resources in the regions.

New York

Coastal and Marine Hazards and Resources Program decadal science strategy 2020–2030

Overview The decadal science strategy of the Coastal and Marine Hazards and Resources Program (CMHRP) of the U.S. Geological Survey for 2020 to 2030 describes the CMHRP's vision and mission and the strategic framework needed to support key program goals: Conduct research and develop science-based tools that lead to safer, more productive coastal communities and improved stewardship of natural resources.

Circular

AAPG Energy and Minerals Division Tight Oil and Gas Committee Activities and Commodity Report for 2021-2022: Tuscaloosa Marine Shale, Gulf Coast basin, Louisiana and Mississippi

The Upper Cretaceous Tuscaloosa marine shale (TMS) potential production area encompasses 20.4 million acres across central Louisiana (LA), southern Mississippi (MS), southwestern Alabama (AL), and a small southwestern section of the Florida panhandle (Hackley et al., 2018). It remains a minor and largely undeveloped unconventional shale oil play with production from the TMS confined along the east-west LA-MS State boundary (Fig. 1). The mean undiscovered, technically recoverable resources in the TMS are estimated at 1.5 billion barrels of oil and 4.6 trillion cubic feet of gas (Hackley et al., 2018). Geochemical analyses of source rock solvent extracts and oil samples indicate that, in the play area, the TMS is the primary source of shale oil produced from the TMS as well as of accumulated oils in the underlying conventional reservoirs of the lower Tuscaloosa (Hackley et al., 2020). The API gravity of TMS oils ranges from approximately 34 to 46 degrees (Hackley et al., 2020; Croke et al., 2020).

AAPG Wiki

Geologic framework and hydrostratigraphy of the Edwards and Trinity aquifers within parts of Bandera and Kendall Counties, Texas

The karstic Edwards and Trinity aquifers are classified as major sources of water in south-central Texas by the Texas Water Development Board. During 2019–23 the U.S. Geological Survey, in cooperation with the Edwards Aquifer Authority, mapped and described the geology and hydrostratigraphy of the rocks composing the Edwards and Trinity aquifers within parts of Bandera and Kendall Counties from field observations of the surficial expressions of the rocks. The thicknesses of the mapped lithostratigraphic and hydrostratigraphic units were also estimated from field observations in the study area. The Cretaceous rocks in the study area are part of the Trinity Group and Edwards Group. The groups, formations, and members are composed primarily of layers of marls, shales, and limestones. The limestones are composed of mudstone through grainstone, framestone and boundstone, dolomite, and argillaceous and evaporitic rocks. The principal structural feature in the study area is the Balcones fault zone. The Balcones fault zone is the result of late Oligocene and early Miocene extensional faulting and fracturing that was a result of the eastern Edwards Plateau uplift. In the Balcones fault zone, most of the faults in the study area are high-angle to vertical, en echelon, normal faults that are predominantly downthrown to the southeast. Hydrostratigraphically, the rocks exposed in the study area are those that contain the Edwards aquifer, the upper zone of the Trinity aquifer, and the middle zone of the Trinity aquifer. Descriptions of the hydrostratigraphic units, thicknesses, hydrologic function, porosity types, and field identification and observations are provided, including those for the informal Bandera and Love Creek hydrostratigraphic units of the Edwards aquifer, which were identified through the mapping for this study.

Texas

The U.S. Geological Survey, the U.S. Department of Defense, and the U.S. Intelligence Community—100 years of mapping and remote sensing collaboration, 1879–1979

Introduction The U.S. Geological Survey (USGS)—a Federal civilian agency—and U.S. military and intelligence agencies collaborate on mapping and remote sensing and have since the establishment of the USGS. The organizations exchange data and information and share technology to further their respective missions in service to the American people. Often referred to as examples of “good government” or “whole of government,” the collaboration avoids costly duplication and maximizes time and effort for the government sectors. Collaboration between these sectors started with the original mapping of the United States and evolved to include remote sensing after the advent of aerial photography and satellite imagery.

Circular

Water-resources inventory and assessment at Katahdin Woods and Waters National Monument

The U.S. Geological Survey, in cooperation with the National Park Service, prepared a water-resources inventory and assessment for Katahdin Woods and Waters National Monument (KAWW). This compilation includes published and publicly accessible hydrologic data and resource assessments of streams, rivers, ponds, lakes, wetlands, vernal pools, and groundwater in and near KAWW. It also includes reports and datasets summarizing attributes of KAWW’s hydrologic infrastructure, such as stream crossings, dams, wastewater discharge plants, groundwater monitoring wells, and U.S. Geological Survey streamflow-gaging stations. Descriptions of data and details of current limitations in available datasets are included. Wetland, groundwater, streamflow, and water-quality information are all limited. Hydrography data are available; however, there are limited ground-truth data. Accurate streamlines within KAWW were developed from light detection and ranging (lidar) as a part of this work. Hydrologic infrastructure information is available from multiple sources; however, differences exist among the datasets. Datasets are summarized in appendix 1.

Maine

Projected sea-level rise and high tide flooding at Timucuan Ecological and Historic Preserve, Florida

Introduction National parks and preserves in the South Atlantic-Gulf Region contain valuable coastal habitats such as tidal wetlands and mangrove forests, as well as irreplaceable historic buildings and archeological sites located in low-lying areas. These natural and cultural resources are vulnerable to accelerated sea-level rise and escalating high tide flooding events. Through a Natural Resources Preservation Program-funded project during 2021–23, the U.S. Geological Survey, in collaboration with the National Park Service, estimated the probability of inundation at Timucuan Ecological and Historic Preserve, Florida, and several other parks under various sea-level rise scenarios and contemporary high tide flooding thresholds. The maps produced for this effort can be used to assess potential habitat change and explore how infrastructure and cultural resources within the park may be exposed to future flooding-related hazards.

Florida

Geochemistry and thermometry of magnetite veins and replacements in iron ore deposits from the Iron Springs district, SW Utah, USA: Relation to magmatic and hydrothermal processes

Ore-genesis, texture, chemical compositions, and thermometry of magnetite were used to better evaluate the origins of iron ore deposits across the Iron Spring district, Utah. Trace element compositions, determined by LA-ICP-MS, were used to calculate temperatures based on X Mg numbers and characterize the trace element signatures of magmatic and hydrothermal magnetite. Magnetite occurs as coarser crystalline grains within veins, breccias, and cavities along with finer crystalline replacements. Magnetite is most commonly intergrown with apatite, phlogopite, and carbonate in veins, breccias, and cavities where apatite occurs separately from the other gangue minerals. The results using empirical trace element discrimination diagrams generally suggest that the magnetite is overall of hydrothermal origin regardless of textural variations or field relationships. The X Mg numbers of the magnetite in the magnetite-apatite ores, however, are suggestive of high temperature magmatic conditions; whereas those of vein, breccia, and replacement occurrences containing other gangue minerals are suggestive of lower temperature hydrothermal processes.

Utah

Prioritizing US Geological Survey science on salinization and salinity in candidate and selected priority river basins

The US Geological Survey (USGS) is selecting and prioritizing basins, known as Integrated Water Science basins, for monitoring and intensive study. Previous efforts to aid in this selection process include a scientifically defensible and quantitative assessment of basins facing human-caused water resource challenges (Van Metre et al. in Environmental Monitoring and Assessment , 192(7), 458 2020). In the present work, we explore this ranking process based on water quality considerations, specifically salinity and salinization. We selected top candidate basins to study salinity and salinization issues in 18 hydrologic regions that include 163 candidate basins. Our prioritization is based on quantitative assessment of sources of salinity, drivers of change, and receptors that must respond to those sources and drivers. Source terms represented in the prioritization include geology, depth to brackish groundwater, stream conductivity, chloride in precipitation, urban and agricultural land use, application of road salt as a deicer, and irrigation. Drivers represented in prioritization include changes in chemical weathering as a result of changes in rainwater chemistry. Receptors include measures of water stress, measurements of stream ecological health, and socioeconomic factors. In addition, we present research activities for the USGS on salinity and salinization that can be pursued in these basins including assessment of sources, pathways, and loadings; predicting and understanding changes in sources, peaks, and trends; understanding the components of salinity and mobilization of contaminants; understanding the relationship between salinization and changing ecosystems; and developing knowledge on the causes and distribution of groundwater salinity, brackish water resources, and challenges related to desalination.

Enviornmental Monitoring and Assessment