Abstract

The Marble exploration hole 4 was drilled to determine the chemical and physical properties of marble from the surface to depth of about 1,200 feet. The drill hole is in the north-central part of the Tippipah Spring quadrangle, approximately 40 miles north of Mercury, Nev. The collar of the hole is at an elevation of 5,490.28 feet and has the Nevada State grid coordinates of N. 904,480.13 and E. 637,758.38. The hole is accessible by a graded dirt road easily traversed by heavy construction equipment, that connects to the highway between Mercury and Groom Lake. The hole was core drilled by Minerals Engineering Company, Grand Junction, Colo., with a 2,000-foot capacity Portadrill drilling rig and conventional NX coring equipment. Drilling was started July 13, and completed August 30, 1959. The drilling fluid was water for most of the hole. At some places in the hole, where loss of drilling fluid was high, the water was thickened with bentonitic mud. At 1,103 feet, presumed caving of the hole caused the drill stem to stick so that it could not be withdrawn; subsequently about 920 feet of the drill stem was recovered. The hole was then reamed to 800 feet and cemented from 785 to 855 feet. A whipstock was emplaced at depth of 805 feet so that the hole, which was vertical to this depth, would be deflected 4° from the vertical. Core was recovered for this part of the hole from 1,088 to 1,187 feet, the total depth. Seven feet of 8-inch outside diameter casing was set from the collar. This report summarizes the information obtained during preparation of the lithologic log of the core and presents results of chemical analyses of marble samples collected from surface near the drill hole. The report was prepared by the U.S. Geological Survey on behalf of the Albuquerque Operations Office, U.S. Atomic Energy Commission. The writers acknowledge the assistance of Mr. John Foster, drilling foreman for Minerals Engineering Company and Mr. Walter A. Johnson, field engineer for Holmes and Narver, Inc., the engineering-contracting firm.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 36.0015° to 39.1634° latitude; -118.1972° to -114.999° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Francis Alexander McKeown, Verl Richard Wilmarth. 1959. Geology of the Marble exploration hole 4, Nevada Test Site, Nye County, Nevada. https://doi.org/10.3133/tem1036

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

"Granite" exploration hole, Area 15, Nevada Test Site, Nye County, Nevada : interim report, Part C, physical properties

Physical properties measurements including porosity, density, permeability, magnetic susceptibility, and thermal conductivity were made on granite samples from the U-15A 'Granite' exploration borehole, Nevada Test Site, Nye County, Nevada. Porosity values range from 0.4 to 4.8 percent, and density values range from 2.56 to 2.69 g/cc (bulk density) and from 2.66 to 2.72 g/cc (grain density). Permeability of fresh rock from the borehole is probably less than 10 -13 millidarcies. Magnetic susceptibility measurements range from 0.36 to 3.48 x 10 -3 cgs units, and thermal conductivity values range from 5.6 to 8.1 cgs units.

Trace Elements Memorandum

Lithologic log and drilling information for the Marble exploration hole 3, U15 area, Nevada Test Site, Nye County, Nevada

The Marble exploration hole 3 is in the northern part of the Tippipah Spring NE 7-1/2 minute quadrangle at the north end of Yucca Valley (fig.1). The collar elevation of the hole is about 5,316 feet and has the approximate Nevada State coordinates of N. 903,093 and E. 674,870. The hole was drilled to determine the physical and chemical properties of the marble within a radius of 200 feet of a point 950 feet below the surface. The exploration hole is 978 feet deep and was drilled from June 12 to July 8, 1959, by Minerals Engineering Co. of Grand Junction, Colorado, using conventional NX coring equiipment and a Portadrill 2,500 drill rig. Water-base bentonitic mud was used as the drilling fluid in the upper part of the hole. Clear water was used after circulation became unrestorable below 200 feet. The hole was cased from surface to 20 feet. The drilling rate during coring ranged from 2.0 to 19.3 minutes per foot and averaged 4.6 minutes per foot (table 1). The core recovered was excellent in quality and quantity. The average core recovery is 92.7 percent (table 2).