USGS · ofr20181116
Evaluation of sockeye salmon after passage through an innovative upstream fish-passage system at Cle Elum Dam, Washington, 2017
Abstract
Executive Summary The Bureau of Reclamation (Reclamation) and the Washington State Department of Ecology (Ecology), working with the Yakima River Basin Water Enhancement Project Workgroup (composed of representatives of the Yakama Nation; Federal, State, county, and city governments; environmental organizations; and irrigation districts), developed the Yakima Basin Integrated Plan (Integrated Plan). The Integrated Plan identifies a comprehensive approach to water resources and ecosystem restoration improvements in the Yakima Basin to be implemented over a 30-year period. The Integrated Plan includes seven elements: Reservoir fish passage, Structural and operational changes to existing facilities, Surface water storage, Groundwater storage, Habitat/watershed protection and enhancement, Enhanced water conservation, and Market reallocation. The first listed element, reservoir fish passage, will be expensive and take many years to accomplish. Reclamation and Ecology decided to look at new and innovative means to provide passage that could help reduce project cost and construction timing while maintaining survival rates of traditional upstream passage facilities. Reclamation contracted with the U.S. Geological Survey to do a study to evaluate the outcome of passage through one innovative fish-passage system at Cle Elum Dam, the first Integrated Plan reservoir fish-passage project being implemented.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Tobias J. Kock, Scott D. Evans, Amy C. Hansen, Russell W. Perry, Hal C. Hansel, Philip V. Haner, Ryan G. Tomka. 2018-07-23. Evaluation of sockeye salmon after passage through an innovative upstream fish-passage system at Cle Elum Dam, Washington, 2017. https://doi.org/10.3133/ofr20181116
Cite the original work for its findings. Save a collection to share your selection of sources.