Phase 1 studies summary of major findings of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

Abstract

Executive Summary The South Bay Salt Pond Restoration Project (Project) is one of the largest restoration efforts in the United States. It is located in South San Francisco Bay of California. It is unique not only for its size—more than 15,000 acres—but also for its location adjacent to one of the nation’s largest urban areas, home to more than 4 million people (Alameda, Santa Clara, and San Mateo Counties). The Project is intended to restore and enhance wetlands in South San Francisco Bay while providing for flood management, wildlife-oriented public access, and recreation. Restoration goals of the project are to provide a mosaic of saltmarsh habitat to benefit marsh species and managed ponds to benefit waterbirds, throughout 3 complexes and 54 former salt ponds. Although much is known about the project area, significant uncertainties remain with a project of this geographic and temporal scale of an estimated 50 years to complete the restoration. For example, in order to convert anywhere from 50 to 90 percent of the existing managed ponds to saltmarsh habitat, conservation managers first enhance the habitat of managed ponds in order to increase use by waterbirds, and provide migratory, wintering, and nesting habitat for more than 90 species of waterbirds. Project managers have concluded that the best way to address these uncertainties is to carefully implement the project in phases and learn from the outcome of each phase. The Adaptive Management Plan (AMP) identifies specific restoration targets for multiple aspects of the Project and defines triggers that would necessitate some type of management action if a particular aspect is trending negatively. U.S. Geological Survey (USGS) biologist Laura Valoppi served as the project Lead Scientist and oversaw implementation of the AMP in coordination with other members of the Project Management Team (PMT), comprised of representatives from the California State Coastal Conservancy, California Department of Fish and Wildlife, the Santa Clara Valley Water District, the U.S. Army Corps of Engineers, and the U.S. Fish and Wildlife Service. To implement the AMP, the PMT have selected and funded applied studies and monitoring projects to address key uncertainties. This information is used by the PMT to make decisions about current management of the project area and future restoration actions in order to meet project. This document summarizes the major scientific findings from studies conducted from 2009 to 2016, as part of the science program that was conducted in conjunction with Phase 1 restoration and management actions. Additionally, this report summarizes the management response to the study results under the guidance of the AMP framework and provides a list of suggested studies to be conducted in “Phase 2–A scorecard summarizing the Project’s progress toward meeting the AMP goals for a range of Project objectives.” The scoring to date indicates that the Project is meeting or exceeding expectations for sediment accretion and western snowy plover ( Charadrius alexandrinus nivosus ) recovery. There is uncertainty with respect to objectives for California gulls ( Larus californicus ), California least tern ( Sternula antillarum ), steelhead trout ( Oncorhynchus mykiss ), and regulatory water quality objectives. Water quality and algal blooms, specifically of the managed ponds, is indicated as trending negative. However, the vast majority of objectives are trending positive, including increased abundance for a number of bird guilds, increasing marsh habitat, maintenance of mudflats, visitor experience, estuarine fish numbers, and special-status marsh species numbers.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 37.36797435878155° to 37.654470456416256° latitude; -122.33688354492188° to -121.86309814453124° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Laura Valoppi. 2018-04-02. Phase 1 studies summary of major findings of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California. https://doi.org/10.3133/ofr20181039

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

ECCOE Landsat quarterly calibration and validation report—Quarter 2, 2026

Executive Summary The U.S. Geological Survey Earth Resources Observation and Science Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continually monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 8 and 9 for quarter 2 (April–June), 2026. All data used to compile the Cal/Val analysis results presented in this report are freely available from the U.S. Geological Survey EarthExplorer website: https://earthexplorer.usgs.gov.

Open-File Report↗

ECCOE Landsat quarterly calibration and validation report—Quarter 1, 2026

Executive Summary The U.S. Geological Survey Earth Resources Observation and Science Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continually monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 8 and 9 for quarter 1 (January–March) of 2026. All data used to compile the Cal/Val analysis results presented in this report are freely available from the U.S. Geological Survey EarthExplorer website: https://earthexplorer.usgs.gov . One specific activity that the ECCOE Landsat Cal/Val Team closely monitored was a Landsat 8 Thermal Infrared Sensor encoder alerts anomaly. On March 18, 2026, the Thermal Infrared Sensor instrument’s mechanism control electronics board reset, driving several parameters to default power-on values. Subsequent telemetry and analysis determined that no persistent hardware misconfiguration was present and no radiometric or geometric degradation was observed.

Open-File Report↗

Floods of June 20–July 6, 2024, in the Big Sioux River, Rock River, Little Sioux River, Ocheyedan River, and Floyd River Basins, northwestern Iowa

Major flooding occurred on June 20–July 6, 2024, in northwestern Iowa affecting the Big Sioux, Rock, Little Sioux, Ocheyedan, and Floyd River Basins. Heavy rain fell in northwestern Iowa, southwestern Minnesota, and southeastern South Dakota on June 20–22, 2024. Parts of northwestern Iowa recorded 2–6 inches of rainfall and localized amounts exceeding 12 inches. A maximum peak-of-record streamflow of 175,000 cubic feet per second at the U.S. Geological Survey streamgage Big Sioux River at Akron, Iowa (06485500), was recorded on June 22, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at four locations along the Big Sioux River between U.S. Interstate 29 at Sioux City, Iowa, upstream to Iowa Highway 10 north of Hawarden, Iowa, a distance of 75.7 river miles. A maximum peak-of-record streamflow of 157,000 cubic feet per second at the U.S. Geological Survey streamgage Rock River near Rock Valley, Iowa (06483500), was recorded on June 22, 2024, and had an annual exceedance probability of less than 0.2 percent. High-water marks were measured at eight locations along the Rock River between County Road B30 east of Hudson, South Dakota, upstream to Iowa Highway 9 at Rock Rapids, Iowa, a distance of 39.3 river miles. A maximum peak-of-record streamflow of 63,000 cubic feet per second at the U.S. Geological Survey streamgage Little Sioux River at Correctionville, Iowa (06606600), was recorded on June 24, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at 11 locations along the Little Sioux River between Iowa Highway 31 west of Correctionville, Iowa, upstream to U.S. Highway 18 north of Spencer, Iowa, a distance of 134.8 river miles. A maximum streamflow of 24,500 cubic feet per second at the U.S. Geological Survey streamgage Ocheyedan River near Spencer, Iowa (06605000), was recorded on June 22, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at three locations along the Ocheyedan River between County Road M38 west of Spencer, Iowa, upstream to U.S. Highway 18 west of Everly, Iowa, a distance of 12.8 river miles. A maximum streamflow of 41,000 cubic feet per second at the U.S. Geological Survey streamgage Floyd River at Alton, Iowa (06600100), was recorded on June 22, 2024, and had an annual exceedance probability range of 1–1.99 percent. High-water marks were measured at six locations along the Floyd River between Iowa Highway 3 at Le Mars, Iowa, upstream to Iowa Highway 10 at Alton, Iowa, a distance of 27.5 river miles. The high-water marks were used to develop flood profiles for the Big Sioux, Rock, Little Sioux, Ocheyedan, and Floyd Rivers.

Iowa, Minnesota, South Dakota↗