Geology ReportsSearch

USGS · 70208445

Development of the next generation of seismic design value maps for the 2020 NEHRP Provisions

Abstract

During the period January 2015 through August 2018, a joint committee of U.S. Geological Survey (USGS) representatives and National Institute of Building Sciences Building Seismic Safety Council (BSSC) volunteers and staff formed a committee to conduct Project 17. The purpose of Project 17 was to formulate recommendations for the rules by which next-generation seismic design value maps, derived from USGS national seismic hazard models, will be developed for adoption by the 2020 National Earthquake Hazard Reduction Program Recommended Provisions for Seismic Regulations of New Buildings and Other Structures (NEHRP Provisions), ASCE 7-22 and the 2024 International Building Code. Two similar projects, Project 97 and Project 07, had been conducted in the past. Each of these projects established, for a period of approximately ten years, the rules by which design ground motion values referenced by the building codes would be developed both by USGS and by private consultants engaged in site-specific studies. Project 17 was originally commissioned in response to issues identified in adopting the 2014 edition of the USGS national seismic hazard model and the design procedures that reference them for use, including the NEHRP Provisions, building codes and referenced standards. Specific issues included: the engineering profession’s discontent with the fluctuating design values portrayed by successive map editions; discovery that the standard spectral shape referenced by the design provisions did not adequately represent ground motion amplitude and spectral character on some sites; and a change in seismologic characterization of the possible size of earthquakes originating on various faults and source zones. Project 17 was funded by the Federal Emergency Management Agency (FEMA), and supported by the USGS with some collaborating experts. An initial planning committee met throughout calendar year 2015 to identify key issues to be considered and to develop a work plan for addressing these as part of the 2020 NEHRP Provisions update cycle. The planning committee recommended an effort of approximately 30-months duration during which the USGS would develop draft design maps based on the rules proposed, to allow evaluation and refinement of the recommendations. A Project 17 Committee (P17C) was empaneled and four task subcommittees were formed, each charged with evaluating one of the key issues identified in the planning effort: Stabilizing mapped values; Definition of Acceptable Risk; Development of multi-period spectral parameter data; and, Definition of procedures for computing deterministic caps, should it be necessary to continue use of such caps in development of the maps. A fifth task subcommittee was formed in 2017 to look at ways to stabilize the seismic design category as an extended effort to stabilize mapped values. The P17C met three times per year throughout 2016, 2017 and 2018 to resolve these issues and develop recommendations for an updated technical basis and procedures to be followed in preparing next-generation seismic design value maps for inclusion in the NEHRP Provisions. The P17C documented these in the form of draft proposals for revision of the NEHRP Provisions. In August 2018, the P17C passed these recommendations to the Provisions Update Committee (PUC) for completion, development of consensus and adoption as appropriate.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 25.08° to 49.38905° latitude; -124.68721° to -66.96466° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ronald Hamburger, David Bonneville, C. B. Crouse, James D. Dolan, Ben Enfield, Julie Furr, Robert Hanson, James A. Harris, John Heintz, William Holmes, Jon Hooper, Charles Kircher, Nico Luco, Steven McCabe, Robert Pekelnicky, Jon Siu, Sanaz Rezaeian, Philipp Schneider, Jonathan P. Stewart, Siamak Sattar, Mai Tong, Jiqiu Yuan. 2017. Development of the next generation of seismic design value maps for the 2020 NEHRP Provisions. https://pubs.usgs.gov/publication/70208445

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Factors affecting benthic macroinvertebrate health in the City of Roanoke, Virginia, 2020–2023

Major waterways in the City of Roanoke (City) have failed to meet Virginia’s aquatic life designated use since 1996. Segments of the upper Roanoke River lack healthy benthic macroinvertebrate communities which prompted a total maximum daily load (TMDL) study by the Virginia Department of Environmental Quality (VDEQ) to identify the most probable stressor(s) causing the impairment. Excess fine sediment was identified as the most probable stressor impairing benthic macroinvertebrates on portions of the Roanoke River in 2006, and a watershed implementation plan published in 2016 required communities within the impaired watershed to implement projects that would reduce the load of fine sediment entering the Roanoke River. Additional benthic macroinvertebrate sampling and stream habitat assessments along the Roanoke River and Tinker Creek (a tributary to the Roanoke River that flows through the City) revealed continued impaired conditions, and subsequent stressor identification analysis was completed in 2023. Samples collected downstream of the City on the Roanoke River and Tinker Creek generally showed more impaired conditions relative to samples collected at locations upstream of the City. Based on this evaluation, sediment and sediment-bound polychlorinated biphenyls (PCBs) were identified as probable stressors while specific conductance, total nitrogen, and sediment metals were possible stressors in Tinker Creek; however, only a sediment TMDL target was identified to address impaired benthic macroinvertebrate communities. In the Roanoke River upstream of the Niagara Dam, sediment and total phosphorus were identified as probable stressors, sediment polycyclic aromatic hydrocarbons and sediment PCB were considered possible stressors; however, the TMDL target was only for total phosphorus. The City partnered with the U.S. Geological Survey (USGS) in 2016 to continuously monitor water quality and streamflow conditions on a major tributary of Tinker Creek, Lick Run, and by 2020, four similar monitoring stations were installed on the Roanoke River and Tinker Creek near the locations of benthic macroinvertebrate sampling. Monitored parameters included streamflow and/or gage height (water level), water temperature, pH, dissolved oxygen, specific conductance, and turbidity. Turbidity is a measure of the relative clarity of the water and was previously used to model suspended-sediment concentrations at the monitoring stations. The City also contracted Kirk Environmental, LLP (KE) to collect benthic macroinvertebrate samples and stream habitat assessments near the locations of the water-quality monitoring stations. Identified benthic macroinvertebrates were used to calculate the Virginia Stream Condition Index (SCI), a multi-metric index composed of eight biological attributes that represent elements of the structure and function of the benthic macroinvertebrate community that measure diversity, composition, and tolerance to pollution. Study objective: In this report, benthic macroinvertebrate samples and stream habitat assessment scores collected at four locations on the Roanoke River and Tinker Creek by KE and the VDEQ between 2020 and 2023 were compared to measured water-quality and streamflow conditions prior to sampling to evaluate patterns between benthic macroinvertebrate health, water quality, and hydrology.

Virginia