Geology ReportsSearch

USGS · 70171429

Organic contamination of ground water at Gas Works Park, Seattle, Washington

Abstract

Gas Works Park, in Seattle, Washington, is located on the site of a coal and oil gasification plant that ceased operation in 1956. During operation, many types of wastes, including coal, tar, and oil, accumulated on-site. The park soil is currently (1986) contaminated with compounds such as polynuclear aromatic hydrocarbons, volatile organic compounds, trace metals, and cyanide. Analyses of water samples from a network of observation wells in the park indicate that these compounds are also present in the ground water. Polynuclear aromatic hydrocarbons and volatile organic compounds were identified in ground water samples in concentrations as large as 200 mg/L. Concentrations of organic compounds were largest where ground water was in contact with a non-aqueous phase liquid in the soil. Where no non-aqueous phase liquid was present, concentrations were much smaller, even if the ground water was in contact with contaminated soils. This condition is attributed to weathering processes in which soluble, low-molecular-weight organic compounds are preferentially dissolved from the non-aqueous phase liquid into the ground water. Where no non-aqueous phase liquid is present, only stained soils containing relatively insoluble, high-molecular-weight compounds remain. Concentrations of organic contaminants in the soils may still remain large.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 46.92025531537451° to 48.1367666796927° latitude; -123.74999999999999° to -121.640625° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

G. L. Turney, D.F. Goerlitz. 2007-02-22. Organic contamination of ground water at Gas Works Park, Seattle, Washington. https://doi.org/10.1111/j.1745-6592.1990.tb00014.x

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

One Ranney well can make a difference: The impacts of a radial collector well on groundwater level and quality in the Cedar River alluvial aquifer

The City of Cedar Rapids, Iowa, depends on groundwater from the Cedar River alluvial aquifer for residential and industrial use. In 2020, the city completed an additional radial collector well, or Ranney well, and was concerned that pumping from the well at high rates may lower water level elevations in the aquifer, reduce yields from nearby production wells, and change the quality of produced water. During an operational test of the well's pumps, the U.S. Geological Survey and the city collected water level and water quality data to evaluate the effects of increased pumping rates on the aquifer and nearby production wells. Results indicated that a high rate of pumping from the new well caused sustained declines in water levels near the well and other nearby production wells, and, if maintained, the aquifer water level in the vicinity would continue to decline to levels observed during the 2012 drought. Aquifer specific conductance and temperature were altered and matched trends and values of the river, and river-to-well travel time was shortened from 7-17 days to about 3 days. Results may also provide insights to other municipal water resource managers when considering wellfield design, production expectations, and long-term management strategies for radial collector well production during drought, low streamflow, and times when high concentrations of nitrate-N or organic pesticide compounds in the river may limit production options.

Iowa

Accuracy of flowmeters measuring horizontal flow in fractured-rock simulators

Laboratory evaluations of flowmeter response to flow in fractured-rock simulators are needed to improve understanding of data collected in field settings. The ability of flowmeters to accurately measure the velocity and direction of water flowing between parallel plates was used as a surrogate for instrument response in fractured-rock aquifers. A colloidal borescope flowmeter and a heat-pulse flowmeter were deployed in a fractured rock simulator with 4-inch and 6-inch inner-diameter, uncased wells with 0.39- and 1.0-inch fracture apertures and groundwater velocities from 35 to 975 ft/d. The colloidal borescope measurements and applied velocities were positively correlated in all wells and apertures (the coefficient of determination [ r 2 ] = 0.61–0.89) and most accurately measured direction at higher velocities. The mean directional error in colloidal borescope measurements was less than 17° in 6-inch wells and 31° in the 4-inch wells at velocities between 92 and 958 ft/d. Heat-pulse flowmeter measurements were 0.001 to 0.004 times less than applied rates and may indicate that water was moving around rather than through the instrument's integrated packer. The mean directional error of heat-pulse flowmeter measurements were about 18 and 42° in the 0.39- and 1.0-inch fractures, respectively, for groundwater velocities within the manufacturer's suggested range of application (0.5–100 ft/d). Measurements made at vertical increments and fracture positions in the well using the colloidal borescope indicate that laminar flow occurs within the central 50% of the fracture but measurements above or below are likely affected by eddy currents.

Groundwater Monitoring & Remediation

1DTempPro V2: new features for inferring groundwater/surface-water exchange

A new version of the computer program 1DTempPro extends the original code to include new capabilities for (1) automated parameter estimation, (2) layer heterogeneity, and (3) time-varying specific discharge. The code serves as an interface to the U.S. Geological Survey model VS2DH and supports analysis of vertical one-dimensional temperature profiles under saturated flow conditions to assess groundwater/surface-water exchange and estimate hydraulic conductivity for cases where hydraulic head is known.

Groundwater Monitoring & Remediation