Geology ReportsSearch

USGS · 70162467

The Chief Joseph Hatchery Program 2013 Annual Report

Abstract

The Chief Joseph Hatchery is the fourth hatchery obligated under the Grand Coulee Dam/Dry Falls project, originating in the 1940s. Leavenworth, Entiat, and Winthrop National Fish Hatcheries were built and operated as mitigation for salmon blockage at Grand Coulee Dam, but the fourth hatchery was not built, and the obligation was nearly forgotten. After the Colville Tribes successfully collaborated with the United States to resurrect the project, planning of the hatchery began in 2001 and construction was completed in 2013. The monitoring program began in 2012 and adult Chinook Salmon were brought on station for the first time in June 2013. BPA is the primary funding source for CJH, and the Mid-Columbia PUDs (Douglas, Grant and Chelan County) have entered into cost-share agreements with the tribes and BPA in order to meet some of their mitigation obligations. The CJH production level was set at 60% in 2013 in order to train staff and test hatchery facility systems during the first year of operation. Leavenworth National Fish Hatchery (LNFH) provided 422 Spring Chinook broodstock in June, 2013; representing the official beginning of CJH operations. In July and August the CCT used a purse seine vessel to collect 814 summer/fall Chinook as broodstock that were a continuation and expansion of the previous Similkameen Pond program. In-hatchery survival for most life stages exceeded survival targets and, as of April 2014, the program was on track to exceed the 60% production target for its start-up year. The CJH monitoring project collected field data to determine Chinook population status, trend, and hatchery effectiveness centered on five major activities; 1) rotary screw traps (juvenile outmigration, natural-origin smolt PIT tagging) 2) beach seine (naturalorigin smolt PIT tagging) 3) lower Okanogan adult fish pilot weir (adult escapement, proportion of hatchery-origin spawners [pHOS], broodstock) 4) spawning ground surveys (redd and carcass surveys)(viable salmonid population [VSP] parameters) 5) eDNA collection (VSP parameter—distribution/spatial structure). Adult summer/fall Chinook spawning escapement in 2013 was estimated to be 8,193, with more than 6,227 natural-origin spawners, which exceeded the recent five year and long term averages. The values for pHOS (0.24) and proportion of natural influence (PNI) (0.79) in 2013 exceeded the objectives (0.67), but the five year averages fell short of the goals (0.39 and 0.62, respectively). An Annual Program Review (APR) was held in March, 2014 to share hatchery production and monitoring data, review the salmon forecast for the upcoming year, and develop action plans for the hatchery, selective harvest, and monitoring projects. Based on a strong pre-season forecast of 67,500 Upper Columbia summer/fall Chinook, the plan for 2014 is to operate the hatchery at full program levels of 2 million summer/fall Chinook and 900,000 spring Chinook. To maximize PNI, broodstock for the integrated program should Chief Joseph Hatchery Program 2013 Annual Report 3 be 100% natural-origin broodstock (NOB) and CCT should plan to harvest their full allocation with the selective harvest program removing as many adult hatchery Chinook as possible with the purse seine, the weir, and at the hatchery ladder.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Casey Baldwin, Andrea Pearl, Matthew Laramie, John Rohrback, Pat Phillips, Keith Wolf. 2016. The Chief Joseph Hatchery Program 2013 Annual Report. https://pubs.usgs.gov/publication/70162467

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Factors affecting benthic macroinvertebrate health in the City of Roanoke, Virginia, 2020–2023

Major waterways in the City of Roanoke (City) have failed to meet Virginia’s aquatic life designated use since 1996. Segments of the upper Roanoke River lack healthy benthic macroinvertebrate communities which prompted a total maximum daily load (TMDL) study by the Virginia Department of Environmental Quality (VDEQ) to identify the most probable stressor(s) causing the impairment. Excess fine sediment was identified as the most probable stressor impairing benthic macroinvertebrates on portions of the Roanoke River in 2006, and a watershed implementation plan published in 2016 required communities within the impaired watershed to implement projects that would reduce the load of fine sediment entering the Roanoke River. Additional benthic macroinvertebrate sampling and stream habitat assessments along the Roanoke River and Tinker Creek (a tributary to the Roanoke River that flows through the City) revealed continued impaired conditions, and subsequent stressor identification analysis was completed in 2023. Samples collected downstream of the City on the Roanoke River and Tinker Creek generally showed more impaired conditions relative to samples collected at locations upstream of the City. Based on this evaluation, sediment and sediment-bound polychlorinated biphenyls (PCBs) were identified as probable stressors while specific conductance, total nitrogen, and sediment metals were possible stressors in Tinker Creek; however, only a sediment TMDL target was identified to address impaired benthic macroinvertebrate communities. In the Roanoke River upstream of the Niagara Dam, sediment and total phosphorus were identified as probable stressors, sediment polycyclic aromatic hydrocarbons and sediment PCB were considered possible stressors; however, the TMDL target was only for total phosphorus. The City partnered with the U.S. Geological Survey (USGS) in 2016 to continuously monitor water quality and streamflow conditions on a major tributary of Tinker Creek, Lick Run, and by 2020, four similar monitoring stations were installed on the Roanoke River and Tinker Creek near the locations of benthic macroinvertebrate sampling. Monitored parameters included streamflow and/or gage height (water level), water temperature, pH, dissolved oxygen, specific conductance, and turbidity. Turbidity is a measure of the relative clarity of the water and was previously used to model suspended-sediment concentrations at the monitoring stations. The City also contracted Kirk Environmental, LLP (KE) to collect benthic macroinvertebrate samples and stream habitat assessments near the locations of the water-quality monitoring stations. Identified benthic macroinvertebrates were used to calculate the Virginia Stream Condition Index (SCI), a multi-metric index composed of eight biological attributes that represent elements of the structure and function of the benthic macroinvertebrate community that measure diversity, composition, and tolerance to pollution. Study objective: In this report, benthic macroinvertebrate samples and stream habitat assessment scores collected at four locations on the Roanoke River and Tinker Creek by KE and the VDEQ between 2020 and 2023 were compared to measured water-quality and streamflow conditions prior to sampling to evaluate patterns between benthic macroinvertebrate health, water quality, and hydrology.

Virginia