USGS · 70162201
Easily constructed, economical seawater intake and supply system
Abstract
A water intake system was designed and installed in Admiralty Inlet, Puget Sound, Washington. The dual system consisted of polyvinylchloride (PVC) pipes, a concrete pit and pumps located on shore at zero tide; and cables attached laterally to the pipelines and terminally between a shoreward anchor and to a seaward intake sled held in place with an 1800 kg Dansforth anchor. The overall construction costs were much lower than those for concrete-lined ductile iron pipe. Nearly three years after its construction, this system has withstood tides and storms without apparent adverse effect. Its application to lakes or rivers is equally possible.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
G.R. Bouck. 2009-03-12. Easily constructed, economical seawater intake and supply system. https://doi.org/10.1111/j.1749-7345.1981.tb00242.x
Cite the original work for its findings. Save a collection to share your selection of sources.