USGS · 70018238
Raton basin coalbed methane production picking up in Colorado
Abstract
Coalbed methane production in the Raton basin of south-central Colorado and northeast New Mexico has gone over pilot testing and entered the development stage which is expected to last several years. The development work is restricted to roughly a 25 mile by 15 mile wide `fairway' centered about 20 miles west of Trinidad, Colorado. At last count, 85 wells were producing nearly 17.5 MMcfd of coalbed methane from the basin's Raton and Vermejo formation coals.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
H. Thomas Hemborg. 1996. Raton basin coalbed methane production picking up in Colorado. https://pubs.usgs.gov/publication/70018238
Cite the original work for its findings. Save a collection to share your selection of sources.