Geology ReportsSearch

Geology topics

Research about Park County, Wyoming

Source-linked reports with geographic coverage including Park County, Wyoming.

6 recordsLinked to original sources

Fluvial sediment dynamics in the Shoshone River and tributaries around Willwood Dam, Park County, Wyoming

Sedimentation affects many of the aging reservoirs in the United States. Dams and water diversions from rivers have been central elements of infrastructure supporting agricultural irrigation in the arid and semiarid regions of the Western United States for more than a century. The Willwood Irrigation District diversion dam (hereafter referred to as “Willwood Dam”) in Park County, Wyoming, is approximately 12 miles northeast of Cody, Wyo.; has a structural height of 70 feet; and impounds the Shoshone River for diversion into the Willwood Canal. Willwood Dam is part of a larger irrigation scheme supported by water storage in the much larger Buffalo Bill Dam, which is approximately 20 miles upstream. In October 2016, renovation construction activities at Willwood Dam and the Willwood Canal caused an unplanned evacuation of nearly 96,000 cubic yards of fine sediment. The fine sediment release in 2016 raised concerns that ongoing sediment management at Willwood Dam could impose limits on the long-term health of the aquatic ecosystem and fish populations. The U.S. Geological Survey, in cooperation with Wyoming Department of Environmental Quality and Willwood Work Groups 2 and 3, initiated an investigation of the dynamics of sediment transport in the Shoshone River and selected tributaries between Buffalo Bill Dam and Willwood Dam. The goal of the study was to quantify sediment transport into and out of Willwood Dam on an annual, seasonal, and event basis to better understand the relative quantities of sediment coming from natural sources and human activities on the landscape. The study ran from March 2019 through October 2021 and used observations of streamflow, turbidity, and acoustic backscatter collected at streamgages upstream and downstream from Willwood Dam to quantify suspended-sediment loads into and out of the dam during irrigation and fallow seasons, precipitation-runoff events, and deliberate sediment releases. Each tributary’s relative contribution to the sediment load upstream from Willwood Dam was examined using discrete measurements of suspended-sediment concentration and bedload during irrigation and fallow seasons, precipitation events, and stable conditions. Analysis of daily precipitation and temperature data indicated that conditions in the study area during the 2019 agricultural year were wetter and colder than period of record normal, and drier and near normal temperatures for the 2020 and 2021 agricultural years. Not all sediment load records between 2019 and 2021 are complete because of rejected observations (outliers), instrument failures or fouling, and instrument removal for calibrations. Statistical modeling of suspended-sediment concentration using paired values of turbidity and acoustic backscatter produced four models that, after refinement, had coefficients of determination indicating that more than 84 percent of the variance was explained by either turbidity or acoustic backscatter. A system of rules was developed to select the model predictions based on the seasonal operations of Willwood Dam, assumptions about the grain sizes mobilized during these operations, and assumed accuracy of the models at the downstream streamgage (Shoshone River below Willwood Dam, near Ralston, Wyo. [streamgage 06284010]) under different operational conditions. The sediment budget between upstream and downstream estimates of loads was interpreted using the mean predicted values bound by their respective model prediction intervals. When mean predicted loads of one streamgage were contained in the prediction intervals of the other streamgage, and vice-versa, difference in the sediment budget were interpreted as “indeterminate.” Modeled sediment load balances demonstrated the depositional and erosional behaviors expected from the conceptual model of dam operations whereby sediment tends to accumulate during irrigation seasons when the dam is spilling over the top, and sediment tends to evacuate during the fallow seasons when it is flowing through the sluice gates at the base of the dam. The sediment load calculations using the rules-based model criteria indicated that between 14,200 and 380,000 tons of suspended sediment moved through the Shoshone River around Willwood Dam during the irrigation seasons of 2019, 2020, and 2021; 380,000 tons of suspended sediment were transported during the cool, wet year of 2019, and 14,200 tons of suspended sediment were transported in 2020, which was relatively dry. During fallow seasons 2019, 2020, and 2021, which had fewer complete records, between 1,140 and 106,000 tons of suspended sediment was estimated to have moved through the river. For all seasons except fallow season 2022, the models estimated that more sediment was released from the dam than entered the dam, but the modeled mean loads at each streamgage were nearly always within the prediction intervals of each other, making the sediment balance indeterminant. Examination of suspended-sediment loads during irrigation seasons indicated that between 65 and 85 percent of fine sediment was transported during annual high flows and storm events, with the remainder transported during steady, lower streamflows. Examination of suspended loads during fallow seasons indicated that deliberate sediment releases through Willwood Dam accounted for between 39 and 67 percent of the total sediment moved during the fallow seasons. Deliberate sediment releases from Willwood Dam had estimated net exports of between 1,360 and 22,400 tons. Between August 2017 and July 2023, suspended-sediment concentration and bedload sediment samples were collected from 9 tributaries to the Shoshone River during 137 sampling events, including stable and precipitation-runoff conditions. During irrigation season precipitation events, the mean total sediment yields ranged from 0.33 to 9.51 tons per day per square mile; during fallow season precipitation events, the mean total yields ranged from 0.04 to 0.95 ton per day per square mile. The mean total sediment yield per unit area across all samples at each tributary site ranged from 0.26 to 3.08 tons per day per square mile. Bedload was a minor fraction of the total load, constituting a mean of 4 percent across all samples; 3 and 6 percent for events and nonevents, respectively, during irrigation season; and 3 and 1 percent for events and nonevents, respectively, during the fallow season. With the exception of one tributary, Dry Creek, these mean yield values were within the range of watershed-scale background sediment yield values estimated from reservoir surveys and previous suspended-sediment studies. Imagery from irrigation seasons 2012, 2015, 2017, 2019, and 2022 was used to determine the planimetric backwater extent of the pool area in the Shoshone River behind Willwood Dam to identify any changes in sediment storage. Active river channel widths in the Shoshone River upstream from Willwood Dam were all similar between years except 2015, which was determined to be statistically different from all other years. Bathymetric data taken in the pool behind Willwood Dam during three different surveys between November 2017 and April 2022 indicated no statistically significant differences in bed elevations between the years. Results from the planimetric and bathymetric survey data provide multiple lines of evidence indicating that sediment did not accumulate behind the dam within the error of the methods used. Examination of how precipitation affects sediment transport in the Shoshone River upstream from Willwood Dam indicated that accumulated rainfall from the natural runoff events captured during the study period varied from a trace to as much as 4.26 inches, with associated predicted suspended-sediment loads varying from 112 to 232,000 tons of suspended sediment. The behavior of the sediment loads relative to accumulated precipitation did not appear to change depending on irrigation or fallow season. A model of suspended-sediment concentrations relative to the 2-day accumulated precipitation indicated that suspended-sediment concentrations in the Shoshone River upstream from Willwood Dam increased exponentially for accumulations of 0.3 inch or more; such storms accounted for 10 percent or less of precipitation events observed during the 1981 to 2018 period of record. The gaps in records, precision of the instrumentation, and large variation in grain sizes in suspended-sediment mixtures downstream from the dam made closing the sediment budgets for most seasons unattainable. The biggest recent change in sediment storage measured using the planimetric area of deposits behind Willwood Dam took place between 2015 and 2017. The main event between these two measurements was the installation of new Willwood Canal gates in October 2016, which resulted in the large unplanned sediment release. Because the sediment budgets were nearly always indeterminate and the planimetric and bathymetric data indicated little change in the bed and bank material, it is likely that the change in sediment storage behind the dam during the study period was small relative to the precision of the statistical models and other uncertainties. This body of evidence suggests that, averaged during the 3-year study period, no major changes in storage took place, and that the current operations may be keeping storage at near-equilibrium. This condition could have been initiated because the middle sluice gate has now been operational since 2014, and the sediment release in October 2016 evacuated a large amount of legacy sediment from storage. Although the uncertainties are large, sluicing events allow for controlled releases of sediment that contributed to the near equilibrium conditions observed over an annual basis during this study.

Wyoming

Linking suspended sediment conditions to hyporheic dissolved oxygen and fine sediment deposition in salmonid spawning habitat below an irrigation dam, Park County, Wyoming

Dams are essential for water resources management but impose notable effects on fluvial sediment transport and downstream river morphology by reducing or altering the timing of sediment loads. We explored the relationship between dam sediment management and downstream sediment dynamics in the context of riverine fisheries management. We quantified the effects of dam sediment management operations on downstream salmonid spawning habitat during two fall water-level drawdown periods: an experimental drawdown leading to sediment release or a typical slower drawdown intended to minimize release of sediment. The experimental drawdown increased deposited fine sediment and decreased hyporheic dissolved oxygen levels. However, the typical drawdown did not increase fine sediment deposition or decrease hyporheic dissolved oxygen. We quantify the immediate impacts of dam operations using a number of water column and substrate metrics, and demonstrate the potential for sediment flushing operations to have short-term seasonally persistent effects on salmonid spawning habitat. Common surrogates of suspended sediment concentration (i.e. turbidity) were poor indicators of salmonid spawning habitat, especially when sand was the dominant grain size. Instead, measures of suspended sediment concentration such as acoustic backscatter sensors and depth-integrated samples, combined with discharge, appear to be better suited for monitoring and inferring the impacts of dam operations involving sediment releases on salmonid spawning habitat. We demonstrate the importance of understanding sediment particle sizes, monitoring relevant water column conditions in real-time, and provide options for effectively monitoring the downstream impact of dam operations. This work can help managers balance dam sediment management operations with ecological priorities.

Wyoming

Geology and mineral resources of the North Absaroka Wilderness and vicinity, Park County, Wyoming, with sections on mineralization of the Sunlight mining region and geology and mineralization of the Cooke City mining district, and a section on aeromagnetic interpretation

SUMMARY The North Absaroka Wilderness is approximately 560 square miles (1,450 km 2 ) of rugged scenic mountainous terrain that adjoins the eastern boundary of Yellowstone National Park in northwestern Wyoming. The area was studied during 1970, 1971, and 1972 by personnel of the U. S. Geological Survey and the U. S. Bureau of Mines to evaluate its mineral-resource potential as required by the Wilderness Act of 1964. This evaluation is based on a search of the literature courthouse and production records, geologic field mapping, field inspection of claims and prospects, analyses of bedrock and stream-sediment samples, and an aeromagnetic survey. The North Absaroka Wilderness is underlain almost entirely by andesitic and basaltic volcanic rocks of Eocene age. These volcanics rest on deformed sedimentary rocks of Paleozoic and, locally, of Mesozoic age that are exposed at places along the northern and eastern edges of the wilderness. Dikes and other igneous intrusive bodies cut both the volcanic and sedimentary rocks. A nearly flat detachment fault, the Heart Mountain fault, and a related steep break-away fault have displaced middle and upper Paleozoic rocks and some of the older part of the volcanic sequence to the southeast. A much greater thickness of volcanic rocks was found to be involved in Heart Mountain faulting than had previously been recognized; however, most of the volcanic rocks and many of the intrusives were emplaced after Heart Mountain faulting. Local folding and high-angle faulting in mid-Eocene time have deformed all but the youngest part of the volcanic sequence in the southeastern part of the wilderness. This deformation is interpreted as the last pulse of Laramide orogeny. The results of this study indicate that the mineral-resource potential of the wilderness is minimal. Bentonite, petroleum, low-quality coal, and localized deposits of uranium and chromite have been produced in the surrounding region from rocks that underlie the volcanic rocks; but such deposits, if present in the wilderness, would be too deeply buried, too small, or too sporadically distributed to be profitably located and exploited. Copper and gold mines and prospects are present on the fringes of the wilderness, but otherwise the area seems to be devoid of economically valuable concentrations of metallic minerals. No surface evidence of geothermal-energy potential was found. Known mineral deposits in the vicinity of the North Absaroka Wilderness are associated with intrusive rocks. From the Cooke City mining district, just north of the wilderness, replacement deposits in Upper Cambrian carbonate rocks may extend a short distance into the north edge of the wilderness, In the Sunlight mining region, an enclave nearly surrounded by the wilderness, mineralization occurs in veins and is disseminated in volcanic and plutonic rocks. Richer concentrations of metallic minerals may occur in carbonate rocks adjacent to intrusive bodies at depth beneath the volcanic rocks in the Sunlight region. A few small intrusive bodies occur in the wilderness, but no significant associated mineralization was detected. Aeromagnetic data indicate that other intrusives not exposed by erosion may occur in the wilderness; however, no significant metamorphism or alteration is evident at the surface to indicate their presence. Although most of the rocks of the wilderness are of igneous origin, they are all so old (Eocene) that it is unlikely that they retain any original heat. The Pleistocene rhyolitic ash-flow tuffs in the southwestern part of the wilderness were erupted from sources in Yellowstone National Park just to the west; however, in the wilderness these tuffs are too thin to contain any residual heat.

Wyoming