Geology ReportsSearch

Geology topics

Research about Naval Weapons Station

Source-linked reports with geographic coverage including Naval Weapons Station.

3 recordsLinked to original sources

Groundwater Hydrology and Chemistry in and near an Emulsified Vegetable-Oil Injection Zone, Solid Waste Management Unit 17, Naval Weapons Station Charleston, North Charleston, South Carolina, 2004-2009

The U.S. Geological Survey and the Naval Facilities Engineering Command Southeast investigated the hydrology and groundwater chemistry in the vicinity of an emulsified vegetable-oil injection zone at Solid Waste Management Unit (SWMU) 17, Naval Weapons Station Charleston, North Charleston, South Carolina. In May 2004, Solutions-IES initiated a Phase-I pilot-scale treatability study at SWMU17 involving the injection of an edible oil emulsion into the aquifer near wells 17PS-01, 17PS-02, and 17PS-03 to treat chlorinated solvents. The Phase-I injection of emulsified vegetable oil resulted in dechlorination of trichloroethene (TCE) to cis-1,2-dichloroethene (cDCE), but the dechlorination activity appeared to stall at cDCE, with little further dechlorination of cDCE to vinyl chloride (VC) or to ethene. The purpose of the present investigation was to examine the groundwater hydrology and chemistry in and near the injection zone to gain a better understanding of the apparent remediation stall. It is unlikely that the remediation stall was due to the lack of an appropriate microbial community because groundwater samples showed the presence of Dehalococcoides species (sp.) and suitable enyzmes. The probable causes of the stall were heterogeneous distribution of the injectate and development of low-pH conditions in the injection area. Because groundwater pH values in the injection area were below the range considered optimum for dechlorination activity, a series of tests was done to examine the effect on dechlorination of increasing the pH within well 17PS-02. During and following the in-well pH-adjustment tests, VC concentrations gradually increased in some wells in the injection zone that were not part of the in-well pH-adjustment tests. These data possibly reflect a gradual microbial acclimation to the low-pH conditions produced by the injection. In contrast, a distinct increase in VC concentration was observed in well 17PS-02 following the in-well pH increase. Adjustment of the pH to near-neutral values in well 17PS-02 may have made that well relatively favorable to VC production compared with much of the rest of the injection zone, possibly accounting for acceleration of VC production at that well. Following a Phase-II injection in which Solutions-IES, Inc., injected pH-buffered emulsified vegetable oil with an improved efficiency injection approach, 1,1-dichloroethene, TCE, and cDCE rapidly decreased in concentration and are now (2009) undetectable in the injection zone, with the exception of a low concentration (43 micrograms per liter, August 2009) of cDCE in well 17PS-01. In August 2009, VC was still present in groundwater at the test wells in concentrations ranging from 150 to 640 micrograms per liter. The Phase-II injection, however, appears to have locally decreased aquifer permeability, possibly resulting in movement of contamination around, rather than through, the treatment area.

North Carolina

Investigation of Contaminated Groundwater at Solid Waste Management Unit 12, Naval Weapons Station Charleston, North Charleston, South Carolina, 2008

The U.S. Geological Survey and the Naval Facilities Engineering Command Southeast investigated natural and engineered remediation of chlorinated volatile organic compound (VOC) groundwater contamination at Solid Waste Management Unit 12 at the Naval Weapons Station Charleston, North Charleston, South Carolina, beginning in 2000. The primary contaminants of interest in the study are tetrachloroethene, 1,1,1-trichloroethane, trichloroethene, cis-1,2-dichloroethene, vinyl chloride, 1,1-dichloroethane, and 1,1-dichloroethene. Engineered remediation aspects at the site consist of a zero-valent-iron permeable reactive barrier (PRB) installed in December 2002 intercepting the contamination plume and a phytoremediation test stand of loblolly pine trees planted in the source area in May 2003. The U.S. Geological Survey planted an additional phytoremediation test stand of loblolly pine trees on the upgradient side of the southern end of the PRB in February 2008. At least once during the summer, however, the trees were inadvertently mowed during lawn cutting activity. The PRB along the main axis of the contaminant plume appears to be actively removing contamination. In contrast to the central area of the PRB, the data from the southern end of the PRB indicate that contaminants are moving around the PRB. Concentrations in wells upgradient from the PRB showed a general decrease in VOC concentrations. VOC concentrations in some wells in the forest downgradient from the PRB showed a sharp increase in 2005, followed by a decrease in 2006. Farther downgradient in the forest, the VOC concentrations began to increase in 2007 and continued to increase into 2008. The VOC-concentration changes in groundwater beneath the forest appear to indicate movement of a groundwater-contaminant pulse through the forest. It also is possible that the data may represent lateral shifting of the plume in response to changes in groundwater-flow direction.

South Carolina

Investigation of Contaminated Ground Water at Solid Waste Management Unit 12, Naval Weapons Station Charleston, North Charleston, South Carolina, 2006-2007

The U.S. Geological Survey investigated natural and engineered remediation of chlorinated volatile organic compound (VOC) ground-water contamination at Solid Waste Management Unit 12 at the Naval Weapons Station Charleston, North Charleston, South Carolina, beginning in 2000. The primary contaminants of interest in the study are tetrachloroethene, 1,1,1-trichloroethane, trichloroethene, cis-1,2-dichloroethene, vinyl chloride, 1,1-dichloroethane, and 1,1-dichloroethene. The permeable reactive barrier (PRB) along the main axis of the contaminant plume appears to be actively removing contamination. In contrast to the central area of the PRB, the data from the southern end of the PRB indicate that contaminants are moving around the PRB. Concentrations in wells 12MW-10S and 12MW-03S, upgradient from the PRB, showed a general decrease in VOC concentrations. VOC concentrations in some wells in the forest showed a sharp increase, followed by a decrease. In 2007, the VOC concentrations began to increase in well 12MW-12S, downgradient from the PRB and thought to be unaffected by the PRB. The VOC-concentration changes in the forest, such as at well 12MW-12S, may represent lateral shifting of the plume in response to changes in ground-water-flow direction or may represent movement of a contamination pulse through the forest.

South Carolina