Geology ReportsSearch

Geology topics

Research about Naval Base Kitsap

Source-linked reports with geographic coverage including Naval Base Kitsap.

3 recordsLinked to original sources

Variable-density groundwater flow and contaminant transport, Operable Unit 1, Naval Base Kitsap, Keyport, Washington

Chlorinated volatile organic compounds (CVOCs) have migrated to groundwater beneath a former 9-acre landfill at Operable Unit 1 (OU-1) on Naval Base Kitsap, which was active from the 1930s through 1973 on the Keyport Peninsula, in Kitsap County, Washington. Biodegradation of CVOCs at OU-1 limits the mass of dissolved-phase CVOCs in groundwater that discharges to surface water, but contaminant concentrations up to 630 milligrams per liter persist in localized areas, likely from the dissolution of residual, non-aqueous phase liquids. Variable-density groundwater-flow and contaminant-transport models were developed using the SEAWAT-Version 4 computer program to simulate the direction and rate of groundwater flow in a 5.9 square-mile (mi 2 ) - area surrounding the Keyport Peninsula, to estimate the CVOC mass in groundwater and the rate of mass loading, and to assess possible remedial activities at OU-1. The study area is underlain by Quaternary deposits consisting of alternating glacial and interglacial sediments ranging from 500 to 1,500 feet (ft) thick. A hydrogeologic model delineated a sequence of 10 units including a relatively thin package (less than 100 ft) of recent sediments (Vashon Stade and younger) beneath the Keyport Peninsula that are underlain by the much thicker (more than 300 ft) Clover Park Aquitard, which overlies a confined, sea-level aquifer.

Washington

Analysis of groundwater response to tidal fluctuations, Operable Unit 1, Naval Base Kitsap, Keyport, Washington

Chlorinated volatile organic compounds have affected groundwater beneath a former 9-acre landfill at Operable Unit 1 (OU 1) of Naval Base Kitsap (NBK) Keyport, in Keyport, Washington. The landfill was the primary disposal area for domestic and industrial waste generated by NBK Keyport from the 1930s through 1973. Naval Facilities Engineering Command Northwest, in conjunction with the Environmental Protection Agency, Washington State Department of Ecology, and the Suquamish Tribe, is charged with collecting necessary data to monitor the contamination left in place and to ensure that the site does not pose a risk to human health or the environment. To support these efforts, refined information was collected on how groundwater levels throughout OU 1 respond to tidal fluctuations at this nearshore site adjacent to Liberty Bay, an inlet of Puget Sound. The information was analyzed to determine the optimal times during the semidiurnal and the neap-spring tidal cycles to sample groundwater for contaminants associated with fresh groundwater originating from OU 1. The optimal times for sampling are presumed to be when fresh groundwater flowing seaward is least impeded by elevated tides, and those times are related to predicted tide levels by tidal lags, the durations between low tides, and corresponding low groundwater levels. Discrete groundwater-specific conductance data also were collected to determine if a seawater/freshwater interface was present at any of the monitoring wells, and to inform decisions on the depth at which groundwater should be sampled in existing wells. Groundwater and surface-water levels were monitored at 19 monitoring wells and five adjacent surface-water sites. Specific conductance was monitored in each surface-water site. All time-series data parameters were collected every 15 minutes during a 4-week duration to measure how nearshore groundwater responds to tidal forcing. Time-series data were collected from July 12, 2018, to August 8, 2018, a period that included neap and spring tides. Vertical water-quality profiles were measured once in the screened interval of nine selected monitoring wells. The profiles included measurements at the top, middle, and bottom of each saturated screen interval. Tidal lag times were determined relative to tidal levels in Liberty Bay (rather than in the more nearby Tide Flats) because the predicted tides for the Poulsbo, Washington Station (National Oceanic and Atmospheric Administration [NOAA] Station 9445719) that are used to schedule groundwater sampling represent open-water conditions in the area; a sill that separates Dogfish Bay from the Tide Flats clearly affects the timing and magnitude of low-low tides in the Tide Flats. Calculated tidal lag times were divided into three general groups: (1) wells where groundwater responded to tidal level changes immediately, (2) wells where groundwater responded to tidal level changes within about 2–5 hours, and (3) wells where groundwater had minimal response to tidal level changes. Groundwater levels in the middle group of wells primarily responded in concert with tidal level changes in the Tide Flats rather than tidal level changes in Liberty Bay. An intended sampling depth refinement based on an assessment of transient seawater intrusion was not completed because of a failure to collect specific-conductance time-series data in select wells. Instead, discrete specific-conductance data from this and prior studies were evaluated to determine that the midpoint of well screens in OU 1 wells can be assumed to be a reasonably representative of undiluted groundwater. When sampling during spring (rather than neap) tides (as has generally been the standard practice at OU 1), the optimal time to sample the monitoring wells influenced by tides would be to add the tidal lags presented in this report to the time of the predicted low-low tide for Liberty Bay as measured at NOAA Station 9445719 at Poulsbo, Washington. Sampling schedules for the six wells where groundwater levels were only minimally influenced by tide changes should not be constrained by tidal conditions.

Washington

Analysis of groundwater response to tidal fluctuations, Operable Unit 2, Area 8, Naval Base Kitsap, Keyport, Washington

Operable Unit 2, Area 8, at Naval Base Kitsap, Keyport is the site of a former chrome-plating facility that released metals (primarily chromium and cadmium), chlorinated volatile organic compounds, and petroleum compounds into the local environment. To ensure long-term protectiveness, as stipulated in the Fourth Five-Year Review for the site, Naval Facilities Engineering Command Northwest collaborated with the U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the Suquamish Tribe, to collect data to monitor the contamination left in place and to ensure the site does not pose a risk to human health or the environment. To support these efforts, refined information was needed on the interaction of fresh groundwater with seawater in response to the up-to 13-ft tidal fluctuations at this nearshore site adjacent to Port Orchard Bay. The information was analyzed to meet the primary objective of this investigation, which was to determine the optimal time during the semi-diurnal and the neap-spring tidal cycles to sample groundwater for freshwater contaminants in Area 8 monitoring wells. Groundwater levels and specific conductance in five monitoring wells, along with marine water-levels (tidal levels) in Port Orchard Bay, were monitored every 15 minutes during a 3-week duration to determine how nearshore groundwater responds to tidal forcing. Time series data were collected from October 24, 2017, to November 16, 2017, a period that included neap and spring tides. Vertical profiles of specific conductance were also measured once in the screened interval of each well prior to instrument deployment to determine if a freshwater/saltwater interface was present in the well during that particular time. The vertical profiles of specific conductance were measured only one time during an ebbing tide at approximately the top, middle, and bottom of the saturated thickness within the screened interval of each well. The landward-most well, MW8-8, was completely freshwater, while one of the most seaward wells, MW8-9, was completely saline. A distinct saltwater interface was measured in the three other shallow wells (MW8-11, MW8-12, and MW8-14), with the topmost groundwater occurring fresh underlain by higher conductivity water. Lag times between minimum spring-tide level and minimum groundwater levels in wells ranged from about 2 to 4.5 hours in the less-than 20-ft deep wells screened across the water table, and was about 7 hours for the single 48-ft deep well screened below the water table. Those lag times were surprisingly long considering the wells are all located within 200-ft of the shoreline and the local geology is largely coarse-grained glacial outwash deposits. Various manmade subsurface features, such as slurry walls and backfilled excavations, likely influence and confuse the connectivity between seawater and groundwater. The specific-conductance time-series data showed clear evidence of substantial saltwater intrusion into the screened intervals of most shallow wells. Unexpectedly, the intrusion was associated with the neap part of the tidal cycle around November 13–16, when relatively low barometric pressure and high southerly winds led to the highest high and low tides measured during the monitoring period. The data consistently indicated that the groundwater had the lowest specific conductance (was least mixed with seawater) during the prior neap tides around October 30, the same period when the shallow groundwater levels were lowest. Although the specific conductance response is somewhat different between wells, the data do suggest that it is the heights of the actual high-high and low-low tides, regardless of whether or not they occur during the neap or spring part of the cycle, that allows seawater intrusion into the nearshore aquifer at Area 8. With all the data taken into consideration, the optimal time for sampling the shallow monitoring wells at Area 8 would be centered on a 2–5-hour period following the predicted low-low tide during neap tide, with due consideration of local atmospheric pressure and wind conditions that have the potential to generate tides that can be substantially higher than those predicted from lunar-solar tidal forces. The optimal time for sampling the deeper monitoring wells at Area 8 would be during the 6–8-hour period following a predicted low-low tide, also during the neap tide part of the tidal cycle. The specific time window to sample each well following a low tide can be found in table 5. Those periods are when groundwater in the wells is most fresh and least diluted by seawater intrusion. In addition to timing, consideration should be given to collecting undisturbed samples from the top of the screened interval (or top of the water table if below the top of the interval) to best characterize contaminant concentrations in freshwater. A downhole conductivity probe could be used to identify the saltwater interface, above which would be the ideal depth for sampling.

Washington