Geology Reports⌕ Search

Geology topics

Research about Milwaukee County, Wisconsin

Source-linked reports with geographic coverage including Milwaukee County, Wisconsin.

6 recordsLinked to original sources

Highway-runoff quality, and treatment efficiencies of a hydrodynamic-settling device and a stormwater-filtration device in Milwaukee, Wisconsin

The treatment efficiencies of two prefabricated stormwater-treatment devices were tested at a freeway site in a high-density urban part of Milwaukee, Wisconsin. One treatment device is categorized as a hydrodynamic-settling device (HSD), which removes pollutants by sedimentation and flotation. The other treatment device is categorized as a stormwater-filtration device (SFD), which removes pollutants by filtration and sedimentation. During runoff events, flow measurements were recorded and water-quality samples were collected at the inlet and outlet of each device. Efficiency-ratio and summation-of-load (SOL) calculations were used to estimate the treatment efficiency of each device. Event-mean concentrations and loads that were decreased by passing through the HSD include total suspended solids (TSS), suspended sediment (SS), total phosphorus (TP), total copper (TCu), and total zinc (TZn). The efficiency ratios for these constituents were 42, 57, 17, 33, and 23 percent, respectively. The SOL removal rates for these constituents were 25, 49, 10, 27, and 16 percent, respectively. Event-mean concentrations and loads that increased by passing through the HSD include chloride (Cl), total dissolved solids (TDS), and dissolved zinc (DZn). The efficiency ratios for these constituents were -347, -177, and 20 percent, respectively. Four constituents—dissolved phosphorus (DP), chemical oxygen demand (COD), total polycyclic aromatic hydrocarbon (PAH), and dissolved copper (DCu)—are not included in the list of computed efficiency ratio and SOL because the variability between sampled inlet and outlet pairs were not significantly different. Event-mean concentrations and loads that decreased by passing through the SFD include TSS, SS, TP, DCu, TCu, DZn, TZn, and COD. The efficiency ratios for these constituents were 59, 90, 40, 21, 66, 23, 66, and 18, respectively. The SOLs for these constituents were 50, 89, 37, 19, 60, 20, 65, and 21, respectively. Two constituents—DP and PAH—are not included in the lists of computed efficiency ratio and SOL because the variability between sampled inlet and outlet pairs were not significantly different. Similar to the HSD, the average efficiency ratios and SOLs for TDS and Cl were negative. Flow rates, high concentrations of SS, and particle-size distributions (PSD) can affect the treatment efficacies of the two devices. Flow rates equal to or greater than the design flow rate of the HSD had minimal or negative removal efficiencies for TSS and SS loads. Similar TSS removal efficiencies were observed at the SFD, but SS was consistently removed throughout the flow regime. Removal efficiencies were high for both devices when concentrations of SS and TSS approached 200 mg/L. A small number of runoff events were analyzed for PSD; the average sand content at the HSD was 33 percent and at the SFD was 71 percent. The 71-percent sand content may reflect the 90-percent removal efficiency of SS at the SFD. Particles retained at the bottom of both devices were largely sand-size or greater.

Wisconsin↗

Data and methods of a 1999-2000 street sweeping study on an urban freeway in Milwaukee County, Wisconsin

The Wisconsin Department of Transportation is required to control the quality of runoff from roadways under their control as part of the National Pollution Discharge Elimination System. One way to control roadway runoff is to use street sweeping to remove pollutants before they are entrained in runoff. This may be a good option because land is often unavailable or prohibitively expensive and structural best-management practices can also be expensive. This study collected stormwater runoff samples and dirt samples from the roadway surface from a section of Interstate Highway 894 near Milwaukee, Wisconsin during periods when a street sweeping program was and was not in effect. These data may be useful in evaluating street sweeping as a stormwater best management practice but this study did not perform this evaluation. Data collection methods, concentrations of sediment and other constituents in storm- water runoff, and street dirt masses are presented in this report. Replicate and comparison sample results indicate that when evaluating the effectiveness of best-management practices on highway runoff, suspended sediment results should be used rather than suspended solids, presumably because the particle sizes in highway runoff is large compared to those found in other types of stormwater runoff.

Wisconsin↗

Evaluation of the Multi-Chambered Treatment Train, a retrofit water-quality management device

This paper presents the results of an evaluation of the benefits and efficiencies of a device called the Multi-Chambered Treatment Train (MCTT), which was installed below the pavement surface at a municipal maintenance garage and parking facility in Milwaukee, Wisconsin. Flow-weighted water samples were collected at the inlet and outlet of the device during 15 storms, and the efficiency of the device was based on reductions in the loads of 68 chemical constituents and organic compounds. High reduction efficiencies were achieved for all particulate-associated constituents, including total suspended solids (98 percent), total phosphorus (88 percent), and total recoverable zinc (91 percent). Reduction rates for dissolved fractions of the constituents were substantial, but somewhat lower (dissolved solids, 13 percent; dissolved phosphorus, 78 percent; dissolved zinc, 68 percent). The total dissolved solids load, which originated from road salt storage, was more than four times the total suspended solids load. No appreciable difference was detected between particle-size distributions in inflow and outflow samples.

Wisconsin↗

Distribution and transport of polychlorinated biphenyls and associated particulates in the Milwaukee River System, Wisconsin, 1993-95

The distribution and transport of polychlorinated biphenyl (PCB) congeners were determined at various sites on Cedar Creek and its receiving stream, the Milwaukee River. PCB congener distributions were determined in the operationally defined dissolved phase, suspended-particle phase, and surficial bed sediments (0?2 centimeters depth). At most sites, the relative abundances of PCB congeners in the suspended particles and surficial bed sediments were similar to each other, and in some cases, to known Aroclor mixtures (1242 and 1260). Dissolved PCB congener distributions were higher in the less chlorinated congeners as predicted by their lower hydrophobicity and higher solubility. Log partition coefficients for the dissolved and the particle-associated organic carbon phases ranged from 5.0 to 5.8 and 6.5 to 7.5, respectively, for SPCB?s (congener summation). Particle-associated PCB?s exhibited two patterns: (1) a general increase in spring and summer associated with algal growth and, (2) episodic increases associated with resuspension of bed sediments during storms. Total suspended solids loads in water year 1994 ranged from 8,700 tons at Pioneer Road to 15,800 tons at Estabrook Park. PCB loads decreased from Highland Road (3.7 kilograms) to Pioneer Road (1.8 kilograms) from August 1994 to August 1995, indicating PCB deposition between those sites. PCB transport at Estabrook Park was 8 to 16 kilograms during this same time period.

Wisconsin↗

Simulation of unsteady flow in the Milwaukee Harbor Estuary at Milwaukee, Wisconsin

This report describes the application and results of an unsteady-flow model for the Milwaukee Harbor Estuary. The model simulates unsteady and upstream flow occurring in the estuary as a result of Lake Michigan Seiche. The discharge computed by the model indicates that upstream flow occurs throughout the estuary during periods of lake seiche. Flow conditions are extremely unsteady and major flow reversals may occur within 1 hr. The simulated discharge indicates that both upstream and downstream flows four times greater than the average daily discharge can occur during the same day. An estimate of 5- or 15-minute average discharge was required during selected runoff events and at various locations in the estuary as part of the Milwaukee Harbor Estuary study. The model provides a method to estimate 5-minute average discharges at selected cross sections in the estuary. The U.S. Geological Survey 's Branch Network Model was used to simulate stage and discharge. A finite difference computation scheme is used to solve the one-dimensional flow equations. Model input requirements include channel geometry data, discharge at the upstream tributaries, and stage data at the estuary mouth. The model was used to simulate the flow during six selected time periods in 1982-84 using a 5- or 15-minute computation interval. (Author 's abstract)

Wisconsin↗

Water-table map of Milwaukee County, Wisconsin

A map (scale 1:100,000) of the water table in Milwaukee County in southeastern Wisconsin was prepared using water levels from more than 135 wells. The work was done as a cooperative project between the U.S. Geological Survey and the Southeastern Wisconsin Regional Planning Commission. The map shows the altitude of the water table in increments of 20 feet. The altitude ranges from less than 540 feet in a cone of depression in the city of Milwaukee to more than 800 feet in an area along the western border of the county. (Woodard-USGS)

Wisconsin↗