Geology Reports⌕ Search

Geology topics

Research about Middleton, Wisconsin

Source-linked reports with geographic coverage including Middleton, Wisconsin.

7 recordsLinked to original sources

Perchlorate, metals, organic compounds, and lead isotopes in groundwater, surface water, shallow groundwater, and soil within and near the Middleton Municipal Airport–Morey Field (C29), Middleton, Wisconsin, 2022

The Middleton Municipal Airport–Morey Field (C29) is in the City of Middleton and adjacent to the towns of Middleton and Springfield, Wisconsin. Nearby homes in the towns rely on private drinking water wells, and residents are concerned about the potential contamination of groundwater and surface water by airport activities, including flights by small aircraft that use leaded aviation fuel and a fireworks display in July 2021. The U.S. Geological Survey, in cooperation with the Town of Middleton, completed a study in 2022 to characterize the occurrence and sources of perchlorate, metals (including lead), and organic compounds in samples of groundwater, surface water, shallow groundwater, and soils within and near the airport. Lead isotopes were also measured to determine sources of lead by comparing samples to environmental references. Magnitudes of concentrations from samples of water and soil collected in 2022, and their spatial patterns across site locations, indicate the fireworks display in July 2021 was a likely source of perchlorate and metals in the airport study area. The highest perchlorate concentration was measured in surface water at the southeastern corner of the airport near the fireworks launch site; the highest concentrations of fireworks-associated metals were measured in shallow groundwater near the same location. Fireworks were not the only possible source of perchlorate and metals in the airport study area because both were also detected upgradient and away from the fireworks launch site. Ratios of lead isotopes indicate that lead measured in water and soil within the airport study area was primarily sourced from background atmospheric lead deposition or Wisconsin galena lead ore. However, two groundwater samples (one upgradient and one downgradient from the airport; both with concentrations less than 1 microgram per liter) had isotopic signatures matching leaded aviation fuel sold at the airport.

Wisconsin↗

Evaluation of the effects of Middleton's stormwater-management activities on streamflow and water-quality characteristics of Pheasant Branch, Dane County, Wisconsin 1975-2008

Few long-term data sets are available for evaluating the effects of urban stormwater-management practices. Over 30 years of data are available for evaluating the effectiveness of such practices by the city of Middleton, Wis. Analysis of streamflow and water-quality data collected on Pheasant Branch, demonstrates the relation between the changes in the watershed to the structural and nonstructural best management practices put in place during 1975-2008. A comparison of the data from Pheasant Branch with streamflow and water-quality data (suspended sediment and total phosphorus) collected at other nearby streams was made to assist in the determination of the possible causes of the changes in Pheasant Branch. Based on 34 years of streamflow data collected at the Pheasant Branch at Middleton streamflow-gaging station, flood peak discharges increased 37 percent for the 2-year flood and 83 percent for the 100-year flood. A comparison of data for the same period from an adjacent rural stream, Black Earth at Black Earth had a 43 percent increase in the 2-year flood peak discharge and a 140-percent increase in the 100-year flood peak discharge. Because the flood peak discharges on Pheasant Branch have not increased as much as Black Earth Creek it appears that the stormwater management practices have been successful in mitigating the effects of urbanization. Generally urbanization results in increased flood peak discharges. The overall increase in flood peak discharges seen in both streams probably is the result of the substantial increase in precipitation during the study period. Average annual runoff in Pheasant Branch has also been increasing due to increasing average annual precipitation and urbanization. The stormwater-management practices in Middleton have been successful in decreasing the suspended-sediment and total phosphorus loads to Lake Mendota from the Pheasant Branch watershed. These loads decreased in spite of increased annual runoff and flood peaks, which are often expected to produce higher sediment and phosphorus loads. The biggest decreases in sediment and phosphorus loads occurred after 2001 when a large detention pond, the Confluence Pond, began operation. Since 2001, the annual suspended-sediment load has decreased from 2,650 tons per year to 1,450 tons per year for a 45-percent decrease. The annual total phosphorus load has decreased from 12,200 pounds per year to 6,300 pounds per year for a 48-percent decrease. A comparison of Pheasant Branch at Middleton with two other streams, Spring Harbor Storm Sewer and Yahara River at Windsor, that drain into Lake Mendota shows that suspended-sediment and total phosphorus load decreases were greatest at Pheasant Branch at Middleton. Prior to the construction of the Confluence Pond, annual suspended-sediment yield and total phosphorus yield from Pheasant Branch watershed was the largest of the three watersheds. After 2001, suspended-sediment yield was greatest at Spring Harbor Storm Sewer, and lowest at Yahara at Windsor; annual total phosphorus yield was greater at Yahara River at Windsor than that of Pheasant Branch. The stormwater-quality plan for Middleton shows that the city has met the present State of Wisconsin Administrative Code chap. NR216/NR151 requirements of reducing total suspended solids by 20 percent for the developed area in Middleton. In addition, the city already has met the 40-percent reduction in total suspended solids required by 2013. Snow and ice melt runoff from road surfaces and parking lots following winter storms can effect water quality because the runoff contains varying amounts of road salt. To evaluate the effect of road deicing on stream water quality in Pheasant Branch, specific conductance and chloride were monitored during two winter seasons. The maximum estimated concentration of chloride during the monitoring period was 931 milligrams per liter, which exceeded the U.S. Environmental Protection Agency acute criterion of 860 milligrams per liter. Chloride concentrations exceeded the U.S. Environmental Protection Agency chronic criterion of 230 milligrams per liter for at least 10 days during February and March 2007 and for 45 days during the 2007-8 winter seasons. The total sodium chloride load for the monitoring period was 1,720 tons and the largest sodium chloride load occurred in March and April of each year.

Wisconsin↗

Use of a watershed-modeling approach to assess hydrologic effects of urbanization, North Fork Pheasant Branch basin near Middleton, Wisconsin

The North Fork Pheasant Branch Basin in Dane County, Wisconsin is expected to undergo development. There are concerns that development will adversely affect water resources with increased flood peaks, increased runoff volumes, and increased pollutant loads. To provide a scientific basis for evaluating the hydrologic system response to development the Precipitation Runoff Modeling System (PRMS) was used to model the upper Pheasant Branch Creek watershed with an emphasis on the North Fork Basin. The upper Pheasant Branch Creek (18.3 mi2; 11,700 acres) Basin was represented with 21 Hydrologic Response Units (daily time step) and 50 flow planes (5-minute time steps). Precipitation data from the basin outlet streamflow-gaging station located at Highway 12 and temperature data from a nearby airport were used to drive the model. Continuous discharge records at three gaging stations were used for model calibration. To qualitatively assess model representation of small subbasins, periodic reconnaissance, often including a depth measurement, was made after precipitation to determine the occurrence of flow in ditches and channels from small subbasins. As a further effort to verify the model on a small subbasin scale, continuous-stage sensors (15-minute intervals) measured depth at the outlets of three small subbasins (500 to 1,200 acres). Average annual precipitation for the simulation period from 1993 to 1998 was 35.2 inches. The model simulations showed that, on average, 23.9 inches were intercepted by vegetation, or lost to evapotranspiration, 6.0 inches were infiltrated and moved to the regional ground-water system, and 4.8 inches contributed to the upper Pheasant Branch streamflow. The largest runoff event during the calibration interval was in July 1993 (746 ft3/sec; with a recurrence interval of approximately 25 years). Resulting recharge rates from the calibrated model were subsequently used as input into a ground-water-flow model. Average annual recharge varied spatially from 2.3 inches per year in the highly impervious commercial/industrial area to 9.7 inches per year in the undeveloped North Fork Basin with an average overall recharge rate of 8.1 inches per year. Two development scenarios were examined to assess changes in water-budget fluxes. In scenario A, when development was predominantly low-density residential with 5 to 10 percent commercial development along principal roadways, mean annual streamflow increased by 53 percent, overland flow increased by 84 percent, base flow decreased by 15 percent and annual recharge to the regional ground-water system was reduced by 10 percent. In development scenario B, the entire North Fork and intervening area basins contained 50 percent commercial and 50 percent medium density residential land use. Annual storm runoff increased by over 450 percent. The ground-water model for the Pheasant Branch that used the scenario B recharge rates simulated a lowered water table with zero base flow and that flow from Frederick Springs would be reduced 26 percent from present-day (1993?98) conditions.An additional example application of the model evaluated locations of flood detention ponds and potential recharge areas that may mitigate the changes in flood peaks and ground-water recharge resulting from urbanization. From February 1998 through July 1998, water-quality samples were collected by use of stage-activated automated samplers. Median suspended- sediment concentrations were similar between the North and South Fork Basins (194 and 242 mg/L, respectively); however, for other constituents, North Fork values were considerably higher: median phosphorus concentrations by 4 times (1.5 and 0.35 mg/L), median ammonia concentrations by 13 times (1.9 and 0.14 mg/L), and the phosphorus-to-sediment ratio by more than 6 times (21 and 3.1 mg/g).

Wisconsin↗

Comparison of water-quality samples collected by siphon samplers and automatic samplers in Wisconsin

In small streams, flow and water-quality concentrations often change quickly in response to meteorological events. Hydrologists, field technicians, or locally hired stream ob- servers involved in water-data collection are often unable to reach streams quickly enough to observe or measure these rapid changes. Therefore, in hydrologic studies designed to describe changes in water quality, a combination of manual and automated sampling methods have commonly been used manual methods when flow is relatively stable and automated methods when flow is rapidly changing. Auto- mated sampling, which makes use of equipment programmed to collect samples in response to changes in stage and flow of a stream, has been shown to be an effective method of sampling to describe the rapid changes in water quality (Graczyk and others, 1993). Because of the high cost of automated sampling, however, especially for studies examining a large number of sites, alternative methods have been considered for collecting samples during rapidly changing stream conditions. One such method employs the siphon sampler (fig. 1). also referred to as the "single-stage sampler." Siphon samplers are inexpensive to build (about $25- $50 per sampler), operate, and maintain, so they are cost effective to use at a large number of sites. Their ability to collect samples representing the average quality of water passing though the entire cross section of a stream, however, has not been fully demonstrated for many types of stream sites.

Wisconsin↗

Simulation of the effects of hypothetical residential development on water levels in Graber Pond, Middleton, Wisconsin

An investigation of the effects of hypothetical residential development in the Graber Pond watershed was done by the U.S. Geological Survey in cooperation with the city of Middleton. The investigation entailed evaluation of the existing (1989) water budget and water-level conditions for the pond and the water-level conditions expected to result from the hypothetical development that may occur by the year 2000. A water-budget model was calibrated to closely match water levels observed from July 18-August 31, 1989. Water input to the pond during this period was computed to be about 2.58 feet. Of this, about 25 percent (0.65 foot) was from direct rainfall on the pond surface, about 19 percent (0.50 foot) was from storm runoff, and about 55 percent (1.43 feet) was discharge from a nearby manufacturing plant. Simulation of the hypothetical development conditions in the watershed predicts that the average late-summer pond level may rise about 0.7 foot.

Wisconsin↗

Effects of urbanization on streamflow, sediment loads, and channel morphology in Pheasant Branch basin near Middleton, Wisconsin

A 5-year, data-collection and modeling study was conducted on Pheasant Branch basin in and near Middleton, Wisconsin. The objectives of the study were to: (1) describe the streamflow characteristics, sediment transport, and stream-channel morphology in the Pheasant Branch basin; and (2) relate the above factors to changes caused by urbanization and project the effect of urbanization on the hydrology and channel morphology of the study area. Streamflow data were collected at five sites for 4 years in the basin to defme present streamflow conditions. Suspended-sediment data also were collected at these sites. In addition, periodic surveys of monumented channel cross sections were made and compared with a survey from an earlier study to document changes in the channel over a period of 10 years. The suspended-sediment data show a decrease in suspended-sediment load through the fully urbanized reach of the stream in 3 of the 4 years studied. This corresponds with the slight net decrease in cross-section area in this reach for the same period. Possible explanations for the decrease in suspended-sediment loads through this reach include (1) sediment being trapped at the five drop structures and the Park Street erosion-control structure and (2) sediment being deposited in overbank areas throughout the reach. Farther downstream, the suspended-sediment load decreased through the Pheasant Branch marsh during a year of high flow but increased through the marsh in 2 of the 3 years for which complete data are available. The marsh is not acting as a net sediment trap in some years. A rainfall-runoff model was calibrated and verified for the basin upstream from U.S. Highway 12. This model was used to simulate 68 years of summer flood hydrographs for three conditions: Current land use, projected urban development, and complete urban development of all lands in the basin. Analysis of simulated flood flows indicates that projected urban development would double the mean annual flood peaks at U.S. Highway 12. Complete development of the basin would increase the mean annual flood peak by a factor of 2.4. From 1971 to 1977, the mean streambed elevation lowered by almost 2 feet, and the mean channel width increased by more than 35 percent in the reach downstream from the fully urbanized part of the basin. In other reaches, the mean streambed elevation lowered by more than a foot. Changes in channel cross sections after 1977 were smaller. Increases in flood flow would tend to enlarge the channel. An increase in the mean annual flood by a factor of 2. 0 to 2.4 will cause a 40 to 50 percent increase in channel width and a 30 to 40 percent increase in channel depth.

Wisconsin↗

Effects of urbanization on three ponds in Middleton, Wisconsin

A digital hydrologic model was used to simulate the effects of future residential development on pond inflow volumes and resulting water levels of three ponds in Middleton, Wisconsin. The model computed the daily water budget and the resulting water level for each pond. The results of the model calibration are presented in the report, along with the existing watershed hydrologic conditions and runoff volumes for the 1982 study period. Data was collected during 1982 to claibrate the model; the data included pond stage, ground-water levels, precipitation and other meteorological characteristics. In addition, water-quality samples were collected at each pond to characterize the water quality. Simulation of pond levels with the 1982 rainfall and fully developed watersheds did not result in stages greater than those observed in 1982. Simulation of pond levels with rainfall having a 20-year recurrence interval (1978) and hypothetical, fully developed watersheds resulted in maximum pond stages above those observed in 1982. Peak stage of Tiedeman 's Pond would increase by 2.77 feet, Stricker 's Pond by 3.91 feet, and Esser 's Pond by 1.44 feet. Simulation of pond levels with an estimated 100-year rainfall and hyopthetical, fully developed watersheds would result in peak stage increases of 5.30, 5.32, and 1.97 feet above the peak 1982 observed stages for Tiedeman's, Stricker's, and Esser 's Ponds, respectively. (USGS)

Wisconsin↗