Geology ReportsSearch

Geology topics

Research about Methow River Basin

Source-linked reports with geographic coverage including Methow River Basin.

3 recordsLinked to original sources

Simulated runoff at many stream locations in the Methow River Basin, Washington

A collaborative Bureau of Reclamation-U.S. Geological Survey (USGS) team has been brought together to incorporate a conceptual geomorphic-habitat model with a process-based trophic model to understand the processes important to stream habitat for anadromous fish populations. The Methow River Basin was selected as a test basin for this hybrid geomorphic-habitat/trophic model, and one of the required model inputs is long-term daily runoff at reaches with potential habitat. Leveraging the existence of a watershed model that was constructed for the Methow River Basin by the USGS, the team approached the USGS at the Washington Water Science Center to resurrect the original model and to simulate runoff at many locations in the basin to test the trophic model. Thirteen new flow-routing sites were added to the model, creating a total of 61 sites in the basin where daily runoff was simulated and provided as output. The input file that contains observed meteorological data that drives the watershed model and observed runoff data for comparisons with simulated runoff was extended from water year 2001 to water year 2013 using data from 18 meteorological sites and 12 observed runoff sites. The watershed model included simulation of 16 irrigation diversions that simulated 50-percent water loss through canal seepage. Irrigation was simulated as a constant application of 0.2 inches per day to during the irrigation season, May 1–October 7. Comparisons of the simulated runoff with observed runoff at six selected long-term streamflow-gaging stations showed that the simulated annual runoff was within +15.4 to -9.6 percent of the annual observed runoff. The simulated runoff generally matched the seasonal flow patterns, with bias at some stations indicated by over-simulation of the October–November late autumn season and under-simulation of the snowmelt runoff months of May and June. Sixty-one time series of daily runoff for a 26-year period representative of the long-term runoff pattern, water years 1988–2013, were simulated and provided to the trophic modeling team.

Washington

Simulation of streamflows and basin-wide hydrologic variables over several climate-change scenarios, Methow River basin, Washington

The purpose of this project was to demonstrate the capabilities of an existing watershed model and downscaling procedures to provide simulated hydrological data over various greenhouse gas emission scenarios for use in the Methow River framework prototype. An existing watershed model was used to simulate daily time series of streamflow and basin-wide hydrologic variables for baseline conditions (1990–2000), and then for all combinations of three greenhouse gas emission scenarios and five general circulation models for future conditions (2008–2095). Input data for 18 precipitation and 17 temperature model input sites were generated using statistical techniques to downscale general circulation model data. The simulated results were averaged using an 11-year moving window to characterize the central year of the window to provide simulated data for water years 2008–2095. Simulation results indicate that substantial changes of monthly mean streamflows will occur. For all greenhouse gas emission scenarios, the future streamflows are greater in the winter than baseline conditions because a greater percentage of future precipitation is projected to fall as rain rather than as snow. The simulated future spring streamflows are less than baseline conditions because the spring snowpacks are smaller; therefore, flow contributions from snowmelt are less. A database was developed to automate model execution and to provide users with Internet access to voluminous data products ranging from summary figures to model output timeseries. Database-enabled Internet tools were developed to allow users to create interactive graphs of output results based on their analysis needs. For example, users were able to create graphs by selecting time intervals, greenhouse gas emission scenarios, general circulation models, and specific hydrologic variables.

Washington

Hydrogeology of the unconsolidated sediments, water quality, and ground-water/surface-water exchanges in the Methow River Basin, Okanogan County, Washington

The U.S. Geological Survey, in cooperation with Okanogan County, investigated the hydrogeology of the unconsolidated sedimentary deposits in the Methow River Basin, the quality of surface and ground waters, and the exchanges between ground water and surface water. Alluvium (Qa) and glaciofluvial sediments (Qga) deposited during the Quaternary period constitute the primary aquifer in the Methow River Basin, which is used as a source of water for domestic and public-water supplies and for maintaining streamflow during seasonal dry periods. The sediments form a nearly continuous unit along the valley bottom from above the Lost River to the confluence of the Methow and Columbia Rivers, covering more than 45 square miles of the basin?s surface. There are no distinct units within the deposit that can be identified across or along the valley except for fragments of a possible lake bed near the town of Twisp. Ground-water levels in the unconsolidated aquifer are highest during the summer and lowest in the winter and early spring. Ground water and surface water, sampled during June and September 2001, generally were of high quality. Only two samples from domestic and municipal wells indicated the possibility of ground-water contamination from nitrate and arsenic concentrations. In both cases, potential contamination was isolated to an individual well. No trends in water quality were apparent when comparing the results of this investigation with previous studies. The flow of water between rivers and aquifers is important for regulating the availability of water resources for in-stream and out-of-stream uses in the Methow River Basin. Ground-water discharge from the unconsolidated aquifer to the Methow River from Lost River to Pateros ranged from an estimated 153,000 acre-ft in water year 2001 to 157,000 acre-ft in water year 2002. In contrast, ground-water discharge to the lower Twisp River from Newby Creek to near Twisp ranged from 4,700 acre-ft in water year 2001 to 9,200 acre-ft in water year 2002. The Methow and Twisp Rivers, among others in the basin, are major sources of recharge for the unconsolidated aquifer, particularly during high-flow periods in May and June. Aquifer recharge by both rivers increased with streamflow in water year 2002 compared to water year 2001 as indicated by daily losses of streamflow. Aquifer recharge by the Methow River from Lost River to Pateros was estimated to be 82,000 acre-ft in water year 2001 and 137,000 acre-ft in water year 2002. Aquifer recharge by the Twisp River from Newby Creek to near Twisp was estimated to be 2,000 acre-ft in water year 2001 and 6,400 acre-ft in water year 2002. Seepage from unlined irrigation canals also recharges the unconsolidated aquifer during the late spring and summer and may contribute as much 38,000 acre-ft annually to aquifer recharge in the basin. Some portion of this ground water returns to rivers as indicated by a seasonal increase in ground-water discharge in the Methow River from Winthrop to Twisp and in the lower Twisp River during late summer and early autumn. Although the increase is likely due primarily to irrigation canal seepage, however, fluvial recharge during the summer also may have contributed to the increase. The increased rate of ground-water discharge decays by January in both reaches.

Washington