Level II scour analysis for Bridge 12 (FFIETH00030012) on Town Highway 3, crossing the Fairfield River, Fairfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00030012 on Town Highway 3 crossing the Fairfield River, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-western Vermont. The 7.34-mi 2 drainage area is in a predominantly rural basin with forest on the valley walls and pasture/row crops on the valley bottom. In the vicinity of the study site, the surface cover is row crops with a few trees on the immediate banks. In the study area, the Fairfield River has a meandering channel with a slope of approximately 0.005 ft/ft, an average channel top width of 37 ft and an average channel depth of 6 ft. The predominant channel bed materials are sand and gravel with a median grain size (D 50 ) of 32.5 mm (0.107 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 16, 1995, indicated that the reach was stable. The Town Highway 3 crossing of the Fairfield River is a 24-ft-long, one-lane bridge consisting of one 20-foot concrete span (Vermont Agency of Transportation, written communication, March 8, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening. Although bridge records show an opening-skew-to-roadway of 45 degrees, the skew measured from surveyed points was 30 degrees. At the time of the level I assessment, the left abutment had been undermined and settled into a scour hole at the upstream end. The right abutment footing was exposed but not undermined. The scour protection measures at the site were type-1 stone fill (less than 12 inches diameter) on the downstream right bank, and type-2 stone fill (less than 36 inches diameter) along the entire base of the upstream right wingwall, the upstream banks, and downstream left bank. The type-2 stone fill on the left bank downstream changes to type-1 about 55 feet downstream of the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.6 to 3.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.2 to 4.0 ft. at the left abutment and 9.7 to 11.7 feet at the right abutment. The worst-case left abutment scour occurred at the incipient over-topping discharge, which was less than the 100-year discharge. The worst-case right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 14 (FFIETH00010014) on Town Highway 1, crossing the Fairfield River, Fairfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00010014 on Town Highway 1 crossing the Fairfield River, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 7.84-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover on the upstream left and downstream right is row crops. The surface cover on the upstream right and downstream left is pasture. In the study area, the Fairfield River has a sinuous channel with a slope of approximately 0.006 ft/ft, an average channel top width of 33 ft and an average channel depth of 3 ft. The channel bed material ranges from silt to gravel with a median grain size (D 50 ) of 15.4 mm (0.0505 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 11, 1995, indicated that the reach was laterally unstable. The Town Highway 1 crossing of the Fairfield River is a 26-ft-long, two-lane bridge consisting of one 23-foot concrete span (Vermont Agency of Transportation, written communication, March 9, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 27 degrees to the opening while there is no opening-skew-to-roadway. The bridge is located on a sharp channel bend. Th e left abutment is impacted due to this bend. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I asse ssment. Scour protection measures at the site include type- 3 stone fill (less than 48 inches diameter ) along the immediate upstream banks and along the base of the upstream left wi ngwall. Type-2 stone fill (le ss than 36 inches diameter) was present along the downstream left wingwall. A dditional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 5.4 to 8.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.0 to 8.3 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are include d in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour ) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events , the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.