Geology ReportsSearch

Geology topics

Weiwei Mo

Publications and source records attributed to Weiwei Mo.

3 recordsLinked to original sources

Balancing fish-energy-cost tradeoffs through strategic basin-wide dam management

Dam management often involves tradeoffs among hydropower generation capacity, environmental impacts, and project costs. However, our understandings of such tradeoffs under a full range of dam management options remain limited, which hinders our ability to make sound and scientifically defensible dam management decisions. In order to assess the scope for theoretical tradeoffs, a dynamic model of hydropower production, important fish populations, and project costs was developed using the system dynamics modeling technique. Three dam management options investigated the likely outcomes from: dam removal, fishway installation (e.g., pool-and-weir, Denil, and fish lift), and no action. The model was applied to the Penobscot River located in Maine, United States as a proof of concept, where recent actions (i.e., dam removal and fishway construction) have been undertaken. We modeled theoretical influence of these actions on four significant sea-run fish (alewife Alosa pseudoharengus , American shad Alosa sapidissima , Atlantic salmon Salmo salar , and sea lamprey Petromyzon marinus ) by developing an index of spawner population potential based on population models for each species. Optimal dam management solutions may maximize spawner population potential and energy production to 60-62% of maximum achievable values while limiting the project cost to US$17 million (44% of the maximum value). Our results demonstrate that basin-scale management strategies may increase the migratory fish restoration while preserving hydropower generation capacity. Diversification of management options (e.g., combination of fishway installations, dam removals, and generation capacity) may increase the efficacy of strategic fish-energy-cost tradeoffs.

Maine

Managing dams for energy and fish tradeoffs: What does a win-win solution take?

Management activities to restore endangered fish species, such as dam removals, fishway installations, and periodic turbine shutdowns, usually decrease hydropower generation capacities at dams. Quantitative analysis of the tradeoffs between energy production and fish population recovery related to dam decision-making is still lacking. In this study, an integrated hydropower generation and age-structured fish population model was developed using a system dynamics modeling method to assess basin-scale energy-fish tradeoffs under eight dam management scenarios. This model ran across 150 years on a daily time step, applied to five hydroelectric dams located in the main stem of the Penobscot River, Maine. We used alewife ( Alosa pseudoharengus ) to be representative of the local diadromous fish populations to link projected hydropower production with theoretical influences on migratory fish populations on the model river system. Our results show that while the five dams can produce around 427 GWh/year of energy, without fishway installations they would contribute to a 90% reduction in the alewife spawner abundance. The effectiveness of fishway installations is largely influenced by the size of reopened habitat areas and the actual passage rate of the fishways. Homing to natal habitat has an insignificant effect on the growth of the simulated spawner abundance. Operating turbine shutdowns during alewives' peak downstream migration periods, in addition to other dam management strategies, can effectively increase the spawner abundance by 480–550% while also preserving 65% of the hydropower generation capacity. These data demonstrate that in a river system where active hydropower dams operate, a combination of dam management strategies at the basin scale can best balance the tradeoff between energy production and the potential for migratory fish population recovery.

Maine

A multiscale approach to balance trade-offs among dam infrastructure, river restoration, and cost

Aging infrastructure and growing interests in river restoration have led to a substantial rise in dam removals in the U.S. However, the decision to remove a dam involves many complex trade-offs. The benefits of dam removal for hazard reduction and ecological restoration are potentially offset by the loss of hydroelectricity production, water supply, and other important services. We use a multi-objective approach to examine a wide array of trade-offs and synergies involved with strategic dam removal at three spatial scales in New England. We find that increasing the scale of decision-making improves the efficiency of trade-offs among ecosystem services, river safety, and economic costs resulting from dam removal, but this may lead to heterogeneous and less equitable local-scale outcomes. Our model may help facilitate multilateral funding, policy, and stakeholder agreements by analyzing the trade-offs of coordinated dam decisions, including net benefit alternatives to dam removal, at scales that satisfy these agreements.

New England