Geology Reports⌕ Search

Geology topics

Robert W. Dudley

Publications and source records attributed to Robert W. Dudley.

At least 73 records · Page 4Linked to original sources

Estimated Magnitudes and Recurrence Intervals of Peak Flows on the Mousam and Little Ossipee Rivers for the Flood of April 2007 in Southern Maine

Large amounts of rain fell on southern Maine from the afternoon of April 15, 2007, to the afternoon of April 16, 2007, causing substantial damage to houses, roads, and culverts. This report provides an estimate of the peak flows on two rivers in southern Maine--the Mousam River and the Little Ossipee River--because of their severe flooding. The April 2007 estimated peak flow of 9,230 ft3/s at the Mousam River near West Kennebunk had a recurrence interval between 100 and 500 years; 95-percent confidence limits for this flow ranged from 25 years to greater than 500 years. The April 2007 estimated peak flow of 8,220 ft3/s at the Little Ossipee River near South Limington had a recurrence interval between 100 and 500 years; 95-percent confidence limits for this flow ranged from 50 years to greater than 500 years.

Open-File Report↗

Historical Changes in Precipitation and Streamflow in the U.S. Great Lakes Basin, 1915-2004

The total amount of water in the Great Lakes Basin is important in the long-term allocation of water to human use and to riparian and aquatic ecosystems. The water available during low-flow periods is particularly important because the short-term demands for the water can exceed the supply. Precipitation increased over the last 90 years in the U.S. Great Lakes Basin. Total annual precipitation increased by 4.5 inches from 1915 to 2004 (based on the average of 34 U.S. Historical Climatology Network stations), 3.5 inches from 1935 to 2004 (average of 34 stations), and 4.2 inches from 1955 to 2004 (average of 37 stations). Variability in precipitation from year to year was large, but there were numerous years with relatively low precipitation in the 1930s and 1960s and many years with relatively high precipitation after about 1970. Annual runoff increased over the last 50 years in the U.S. Great Lakes Basin. Mean annual runoff increased by 2.6 inches, based on the average of 43 U.S. Geological Survey streamflow-gaging stations from 1955 to 2004 on streams that were relatively free of human influences. Variability in runoff from year to year was large, but on average runoff was relatively low from 1955 to about 1970 and relatively high from about 1970 to 1995. Runoff increased at all stations in the basin except in and near the Upper Peninsula of Michigan, where relatively small runoff decreases occurred. Changes in annual runoff for the 16 stations with data from 1935 to 2004 were similar to the changes from 1955 to 2004. The mean annual 7-day low runoff (the lowest annual average of 7 consecutive days of runoff) increased from 1955 to 2004 by 0.048 cubic feet per second per square mile based on the average of 27 stations. Runoff in the U.S. Great Lakes Basin from 1955 to 2004 increased for all months except April. November through January and July precipitation and runoff increased by similar amounts. There were differences between precipitation and runoff changes for February, March, and April, which were likely due to lower ratios of snowfall to rain and earlier snowmelt runoff in recent years. Increases in precipitation were larger than increases in runoff for May, June, August, September, and October. Some of this difference could be due to the different locations of the precipitation and streamflow stations in the basin. Part of the difference may be explained by changes in evapotranspiration. Some of the few highly urbanized and highly regulated stations analyzed in this report had larger increases in annual 7-day low-runoff from 1955 to 2004 than any of the stations in the U.S. Great Lakes Basin that are on streams relatively free of human influences. This demonstrates the human influence over time on very low streamflows. Changes-even over periods as long as 90 years-can be part of longer cycles. Previous studies of Great Lakes Basin precipitation and St. Lawrence River streamflow, using data from the mid-1800s to the late-1900s, showed low precipitation and streamflow in the late 1800s and early 1900s relative to earlier and later periods.

Scientific Investigations Report↗

Scoping of flood hazard mapping needs for Cumberland County, Maine

This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Cumberland County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Cumberland County. Scoping activities included assembling existing data and map needs information for communities in Cumberland County, documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Cumberland County, Maine is 21 years. Most of these studies were in the early to mid 1980s. However, in the ensuing 20-25 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Cumberland County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Cumberland County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how effective FIS data can be used in new project, and identify other data needed to

Open-File Report↗

Scoping of flood hazard mapping needs for Kennebec County, Maine

This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Kennebec County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Kennebec County. Scoping activities included assembling existing data and map needs information for communities in Kennebec County (efforts were made to not duplicate those of pre-scoping completed in March 2005), documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Kennebec County, Maine is 16 years. Most of these studies were in the late 1970's to the mid 1980s. However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Kennebec County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Kennebec County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how e

Open-File Report↗

Scoping of flood hazard mapping needs for Somerset County, Maine

This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Somerset County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Somerset County. Scoping activities included assembling existing data and map needs information for communities in Somerset County (efforts were made to not duplicate those of pre-scoping completed in March 2005), documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Somerset County, Maine is 18.1 years. Most of these studies were in the late 1970's to the mid 1980s. However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Somerset County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Somerset County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and ho

Open-File Report↗

Estimated Effects of Ground-Water Withdrawals on Streamwater Levels of the Pleasant River near Crebo Flats, Maine, July 1 to September 30, 2005

Surface-water data collected at two streamflow-gaging stations on the Pleasant River were analyzed to determine whether ground-water withdrawals from an irrigation well near the Pleasant River have affected streamflows. The relation between the stream-stage data from the two stations shows that stream stage on days when the well was pumped differs from stream stage on days with no pumping, indicating that short-term streamflow depletion occurred. The linear relation defining the relation of stage at the two gaging stations during periods of pumping is significantly different from the linear relation defining the relation of stage at the same two stations during periods of no pumping. The difference between the two linear relations was used to estimate how much short-term streamflow depletion is coincident with ground-water withdrawals. Estimated short-term streamflow depletion varies with stage and ranges from approximately 0.3 to 0.8 cubic feet per second; the relative short-term streamflow depletion ranges from approximately 1.7 to 10 percent.

Scientific Investigations Report↗

Changes in streamflow timing in New England during the 20th century... from the National Streamflow Information Program

This Fact Sheet is one in a series that highlights information or recent research findings from the USGS National Streamflow Information Program (NSIP). The investigations and scientific results reported in this series require a nationally consistent streamgaging network with stable long-term monitoring sites and a rigorous program of data quality assurance, management, archiving, and synthesis. NSIP produces multi-purpose, unbiased surface water information that is readily accessible to all.

Connecticut, Maine, Massachusetts, New Hampshire, ↗

Flooding of the Androscoggin River during December 18-19, 2003, in Canton, Maine

The Androscoggin River flooded the town of Canton, Maine in December 2003, resulting in damage to and (or) evacuation of 44 homes. Streamflow records at the U.S. Geological Survey (USGS) streamflow-gaging stations at Rumford (USGS station identification number 01054500) and Auburn (01059000) were used to estimate the peak streamflow for the Androscoggin in the town of Canton for this flood (December 18-19, 2003). The estimated peak flood streamflow at Canton was approximately 39,800 ft3/s, corresponding to an estimated recurrence interval of 4.4 years; however, an ice jam downstream from Canton Point on December 18-19 obstructed river flow resulting in a high-water elevation commensurate with an open-water flood approximately equal to a 15-year event. The high water-surface elevations attained during the December 18-19 flood event in Canton were higher than the expected open-water flood water-surface elevations; this verified the assumption that the water-surface elevation was augmented due to the downstream ice jam The change in slope of the riverbed from upstream of Canton to the impoundment at the downstream corporate limits, and the river bend near Stevens Island are principal factors in ice-jam formation near Canton. The U.S. Army Corps of Engineers Ice Jam Database indicates five ice-jam-related floods (including December 2003) for the town of Canton: March 13, 1936; January 1978; March 12, 1987; January 29, 1996; and December 18-19, 2003. There have been more ice-jam-related flood events in Canton than these five documented events, but the exact number and nature of ice jams in Canton cannot be determined without further research.

Open-File Report↗

Trends in timing, magnitude, and duration of summer and fall/winter streamflows for unregulated coastal river basins in Maine during the 20th century

The U.S. Geological Survey (USGS), in cooperation with the Maine Atlantic Salmon Commission (ASC), began a study in 2003 to examine the timing, magnitude, and duration of summer (June through October) and fall/early winter (September through January) seasonal streamflows of unregulated coastal river basins in Maine and to correlate them to meteorological variables and winter/spring (January through May) seasonal streamflows. This study overlapped the summer seasonal window with the fall/early winter seasonal window to completely bracket the low-streamflow period during July, August, and September between periods of high streamflows in June and October. The ASC is concerned with the impacts of potentially changing meteorological and hydrologic conditions on Atlantic salmon survival. Because winter/spring high streamflows appear to have trended toward earlier dates over the 20th century in coastal Maine, it was hypothesized that the spring/summer recession to low streamflows could have a similar trend toward earlier, and possibly lower, longer lasting, late summer/early fall low streamflows during the 20th century. There were few statistically significant trends in the timing, magnitude, or duration of summer low streamflows for coastal river basins in Maine during the 20th century. The hypothesis that earlier winter/spring high streamflows may result in earlier or lower low streamflows is not supported by the data. No statistically significant trends in the magnitude of total runoff volume during the low-streamflow months of August and September were observed. The magnitude and timing of summer low streamflows correlated with the timing of fall/winter high streamflows and the amount of summer precipitation. The magnitude and timing of summer low streamflows did not correlate with the timing of spring snowmelt runoff. There were few correlations between the magnitude and timing of summer low streamflows and monthly mean surface air temperatures. There were few statistically significant trends in the timing or duration of fall/winter high streamflows for coastal river basins in Maine during the 20th century. The timing of the bulk of fall/winter high streamflows correlated with seasonal precipitation. Earlier fall/winter center-of-volume dates correlated with higher September and October precipitation. In general, little evidence was observed of trends in the magnitude of seasonal runoff volume during fall/winter. The magnitude of fall/winter high streamflows positively correlated with November and December precipitation amounts. There were few correlations between the magnitude and timing of fall/winter high streamflows and monthly mean surface air temperatures.

Maine↗

Changes in the magnitude of annual and monthly streamflows in New England, 1902-2002

Selected annual and monthly streamflow statistics for 27 streamflow-gaging stations in New England were computed and tested for changes over time. These 27 stations were considered to be free of substantial human influences such as regulation, diversion, and land use-changes and have an average of 71 years of record. The longest streamflow record extended from 1902 to 2002. March mean streamflows increased significantly over time (Mann-Kendall test, p < 0.1) at 14 streamflow-gaging stations in northern New England, primarily in northern or mountainous sections of Maine, New Hampshire, and Vermont. March mean flows increased by 76 to 185 percent at the seven stations with the longest continuous records in areas of New England with the largest seasonal snowpack depths. These streamflow-gaging stations had continuous records from the late 1920's and the early 1930s through 2002. May mean streamflows significantly decreased at 10 stations in northern or mountainous sections of Maine and New Hampshire. May mean flows decreased by 9 to 46 percent at the seven stations with the longest continuous records. Despite the fact that March percentage increases were much larger than May percentage decreases, March streamflow increases (in cubic feet per second) were smaller than May decreases, except at one streamflow-gaging station. Increased March and April air temperatures over time may have caused earlier snowmelt and thus increased streamflows in March and decreased streamflows in May. There were no significant changes over time in annual mean streamflows at the 27 stations; however, there were significant increases over time in various annual percentile streamflows (minimum, 25th percentile, median, 75th percentile, or maximum flows) at 22 of the stations. This indicates that flows increased over time at many streams in New England, but the increase was not enough to have caused significant changes in annual mean flows. October mean streamflows increased significantly at five stations in western New England. December minimum streamflows increased significantly at 13 stations in northern and southern New England.

Connecticut, Maine, Massachusetts, New Hampshire, ↗

Estimating monthly, annual, and low 7-day, 10-year streamflows for ungaged rivers in Maine

Regression equations to estimate monthly, annual, and low 7-day, 10-year (7Q10) streamflows were derived for rivers in Maine. The derived regression equations for estimating mean monthly, mean annual, median monthly, median annual, and low 7Q10 streamflows for ungaged rivers in Maine presented in this report supersede those derived in previous studies. Twenty-six U.S. Geological Survey streamflow-gaging stations on unregulated, rural rivers in Maine with 10 years or more of recorded streamflow were used to develop the regression equations. Ordinary least squares (OLS) regression techniques were used to select the explanatory variables (basin and climatic characteristics) that would appear in the final regression equations. OLS regression of all possible subsets was done with 62 explanatory variables for each of 27 response variables. Five explanatory variables were chosen for the final regression equations: drainage basin area, areal fraction of the drainage basin underlain by sand and gravel aquifers, distance from the coast to the drainage basin centroid, mean drainage basin annual precipitation, and mean drainage basin winter precipitation (the sum of mean monthly precipitation for December, January, and February). Generalized least-squares regression techniques were used to derive the final coefficients and measures of uncertainty for the regression equations. The forms of many of the derived regression equations indicate some physical, mechanistic processes. Drainage basin area is the most statistically important explanatory variable and appears in all derived regression equations. Monthly streamflows are related inversely to the distance from the coast to the drainage basin centroid during December, January, February, and March; that is, the closer a river basin is to the coast, the higher monthly streamflows are per unit drainage basin area during the winter. The relation reverses in May when higher streamflows are attributed to basins farther from the coast. These relations are consistent with colder, inland drainage basins storing more water in snowpack during the winter and releasing it in the spring. The monthly streamflows (and low 7Q10) during July, August, September, and October are related positively to areal fraction of the drainage basin underlain by sand and gravel aquifers. In general, sand and gravel aquifers underlying Maine river basins have excellent water-yielding characteristics and can provide water to streams during low-flow conditions in the summer and early fall.

Maine↗

Hydraulic-geometry relations for rivers in coastal and central Maine

Hydraulic-geometry relations (curves) were derived for 15 sites on 12 rivers in coastal and central Maine on the basis of site-specific (at-a-station) hydraulic-geometry relations and hydraulic models. At-a-station hydraulic-geometry curves, expressed as well-established power functions, describe the relations between channel geometry, velocity, and flow at a given point on a river. The derived at-a-station hydraulic-geometry curves indicate that, on average, a given increase in flow at a given river cross section in the study area will be nearly equally conveyed by increases in velocity and channel cross-sectional area. Regional curves describing the bankfull streamflow and associated channel geometry as functions of drainage area were derived for use in stream-channel assessment and restoration projects specific to coastal and central Maine. Regional hydraulic-geometry curves were derived by combining hydraulic-geometry information for 15 river cross sections using bankfull flow as the common reference streamflow. The exponents of the derived regional hydraulic-geometry relations indicate that, in the downstream direction, most of the conveyance of increasing contribution of flow is accommodated by an increase in cross-sectional area?with about 50 percent of the increase in flow accommodated by an increase in channel width, and 32 percent by an increase in depth. The remaining 18 percent is accommodated by an increase in streamflow velocity. On an annual-peak-series basis, results of this study indicate that the occurrence of bankfull streamflow for rivers in Maine is more frequent than the 1.5-year streamflow. On a flow-duration basis, bankfull streamflow for rivers in coastal and central Maine is equaled or exceeded approximately 8.1 percent of the time on mean?or about 30 days a year. Bankfull streamflow is roughly three times that of the mean annual streamflow for the sites investigated in this study. Regional climate, snowmelt hydrology, and glacial geology may play important roles in dictating the magnitude and frequency of occurrence of bankfull streamflows observed for rivers in coastal and central Maine.

Maine↗

Water budget for Lake Auburn, Maine, May 1, 2000 through April 30, 2003

Annual water budgets were developed for Lake Auburn in southwestern Maine for three water-budget years, May 1, 2000 through April 30, 2003. The measured inflow components of the water budget are direct precipitation to the surface of the lake and surface-water inflow. Mean annual inflow (precipitation and surface water) to Lake Auburn during water-budget years 2001-03 was 816 million cubic feet. The measured outflow components of the water budget are evaporation from the surface of the lake, municipal water-supply withdrawals by the Auburn and Lewiston Water Districts, and surface-water outflow. Mean annual outflow (evaporation, withdrawals, and surface water) during water-budget years 2001-03 was 834 million cubic feet. The two largest components of the water budget are the surface-water inflow and municipal withdrawals. Surface-water inflow was about 62 percent of the mean annual inflow budget and municipal withdrawals were about 47 percent of the mean annual outflow budget. Changes in lake storage also were included in the water budget. Dry conditions were present in Maine from 1999 to 2002, with a severe drought occurring in 2001 and 2002. On February 20, 2002, Auburn Water District recorded Lake Auburn?s lowest recorded water level, 256.7 ft, during the period of record from April 1, 1940 to June 20, 2003. The total inflow and outflow volumes, adjusted for changes in lake storage, nearly balance for each water year. Any non-zero remainder volume for a given water-budget year is the residual. The mean annual residual for the three water-budget years is -1.06 million cubic feet (-7.93 million gallons). The changing sign of the computed residual from water-budget year to water-budget year during the 3-year study period indicates that no systematic errors were made in estimating inflows to or outflows from Lake Auburn. Because ground-water flow is unaccounted for in this water budget, any net ground-water flow is assumed to be contained in the residual term.

Maine↗