Geology Reports⌕ Search

Geology topics

Michael Schmidt

Publications and source records attributed to Michael Schmidt.

2 recordsLinked to original sources

From exploration to production: Understanding the development dynamics of lithium mining projects

Recently, there has been considerable recent controversy whether current and new lithium mines will be able to supply the rapidly growing needs of the electromobility transition. Mineral exploration projects are typically active for many years, and only some become operational mines. From exploration to production, the projects go through several stages of characterisation and evaluation. At each stage, decisions are made by companies and stakeholders to advance, continue or stop the project. This is a complex process, and even projects with very similar geological and technical characteristics may take very different trajectories, depending on external factors such as global market conditions and local regulatory environments. The present study investigates the dynamics of this process for lithium exploration projects. A global database of 397 lithium projects was compiled, covering their progression through major development stages between 2004 and 2022. Ordinal logistic regression was used for the statistical analysis of this data. Different explanatory variables were tested, including economic, geological, technical, and geographic factors, to identify the best predictors for project progress at each development stage. The results suggest an essential role for lithium carbonate prices, and a variable role for other factors at each stage. Critically, the already elapsed lead time and project economics, which are traditionally considered important for the prediction of the start-up of individual mines, do not appear to be relevant in all cases. The results provide important insights into the dynamics of lithium supply and may eventually allow more realistic forecasts to be made for future lithium market dynamics.

Resources Policy↗

Landsat 9 cross calibration under-fly of Landsat 8: Planning, and execution

During the early post-launch phase of the Landsat 9 mission, the Landsat 8 and 9 mission teams conducted a successful under-fly of Landsat 8 by Landsat 9, allowing for the near-simultaneous data collection of common Earth targets by the on-board sensors for cross-calibration. This effort, coordinated by the Landsat Calibration and Validation team, required contributions from various entities across National Aeronautics and Space Administration and U.S. Geological Survey such as Flight Dynamics, Systems, Mission Planning, and Flight Operations teams, beginning about 18 months prior to launch. Plans existed to allow this under-fly for any possible launch date of Landsat 9. This included 16 ascent plans and 16 data acquisition plans, one for every day of the Landsat orbital repeat period, with a minimum of 5 days of useful coverage overlap between the sensors. After the Landsat 9 launch, the plan executed, and led to the acquisition of over 2000 partial to full overlapping scene pairs. Although containing less than the expected number of scenes, this dataset was larger than previous Landsat mission under-fly efforts and more than sufficient for performing cross-calibration of the Landsat 8 and Landsat 9 sensors. The details of the planning process and execution of this under-fly are presented.

Remote Sensing↗