Geology Reports⌕ Search

Geology topics

Michael A. Ivanoff

Publications and source records attributed to Michael A. Ivanoff.

At least 55 records · Page 3Linked to original sources

Level II scour analysis for Bridge 4 (RYEGTH00050004) on Town Highway 5, crossing the Wells River, Ryegate, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RYEGTH00050004 on Town Highway 5 crossing the Wells River, Ryegate, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in eastern Vermont. The 84.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover includes shrubs and brush on the upstream left bank and downstream right bank of the bridge. The upstream right bank and downstream left bank of the bridge is forested. In the study area, the Wells River has an incised, sinuous channel with a slope of approximately 0.008 ft/ft, an average channel top width of 107 ft and an average bank height of 11 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 67.4 mm (0.221 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 21, 1995, indicated that the reach was laterally unstable with mass wasting along the upstream right bank. The Town Highway 5 crossing of the Wells River is a 108-ft-long, two-lane bridge consisting of a 100-foot steel-beam span (Vermont Agency of Transportation, written communication, March 27, 1995). The opening length of the structure parallel to the bridge face is 93.4 ft. The bridge is supported by vertical, stone block abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the opening-skew-toroadway is 45 degrees. The scour protection counter-measures at the site included type-1 stone fill (less than 12 inches diameter) along the downstream left road embankment. Also, type-2 stone fill (less than 36 inches diameter) along the upstream right wingwall, extending 30 feet upstream along the right bank, along the downstream end of the downstream right wingwall, along the downstream right road embankment, and along the downstream left bank below the old railroad bed. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.8 to 2.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 10.2 to 22.6 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 46 (BRNETH00610046) on Town Highway 61, crossing East Peacham Brook, Barnet, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRNETH00610046 on Town Highway 61 crossing East Peacham Brook, Barnet, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 15.8-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest. In the study area, East Peacham Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 59 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 121 mm (0.397 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 23, 1995, indicated that the reach was laterally unstable with cut banks both upstream and downstream of the bridge. The Town Highway 61 crossing of East Peacham Brook is a 28-ft-long, one-lane bridge consisting of one 26-foot steel-beam span (Vermont Agency of Transportation, written communication, March 24, 1995). The opening length of the structure parallel to the bridge face is 24.5 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the opening-skew-toroadway is zero degrees. A scour hole 0.7 ft deeper than the mean thalweg depth was observed along the upstream left wingwall extending along the left abutment during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) at the upstream end of the upstream left wingwall extending along the upstream left bank and along the entire base of the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0 to 1.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 10.4 to 13.9 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 22 (WALDTH00180022) on Town Highway 18, crossing Coles Brook, Walden, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WALDTH00180022 on Town Highway 18 crossing Coles Brook also known as Joes Brook, Walden, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 12.5-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is predominantly forested while the downstream left bank is shrub and brushland. In the study area, the Coles Brook has an incised, sinuous channel with a slope of approximately 0.004 ft/ft, an average channel top width of 54 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to bedrock with a median grain size (D50) of 124.1 mm (0.407 ft). The D 50 was taken from a pebble count in the downstream channel, because the upstream channel is primarily bedrock. The geomorphic assessment at the time of the Level I and Level II site visit on August 8, 1995, indicated that the reach was stable. The Town Highway 18 crossing of the Coles Brook is a 46-ft-long, one-lane bridge consisting of one 44-foot steel-beam span with a wooden deck (Vermont Agency of Transportation, written communication, April 5, 1995). The opening length of the structure parallel to the bridge face is 41.4 ft. The bridge is supported by a vertical, concrete abutment with wingwalls on the left and by a vertical, stone abutment with stone wingwalls with a concrete cap on the right. The channel is skewed approximately 5 degrees to the opening while the computed opening-skew-to-roadway is 10 degrees. The only scour protection measure at the site was a stone wall along the upstream left bank and type-2 stone fill (less than 36 inches diameter) along the entire base length of the upstream left wingwall, left abutment, and downstream left wing wall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100-year and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was 0.0 ft. Abutment scour ranged from 6.4 to 7.9 ft at the left abutment and from 11.8 to 14.9 ft at the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 8 (WELLTH00020008) on Town Highway 2, crossing Wells Brook, Wells, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WELLTH00020008 on Town Highway 2 crossing the Wells Brook, Wells, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Taconic section of the New England physiographic province in southwestern Vermont. The 14.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover on the right overbanks is predominantly suburban while the immediate banks are vegetated with trees and brush. The left bank upstream and downstream is predominantly pasture. In the study area, the Wells Brook has an incised, straight channel with a slope of approximately 0.005 ft/ft, an average channel top width of 51 ft and an average bank height of 7 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 48.6 mm (0.159 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 19, 1995, indicated that the reach was stable. The Town Highway 2 crossing of the Wells Brook is a 35-ft-long, two-lane bridge consisting of one 32-foot concrete span (Vermont Agency of Transportation, written communication, March 22, 1995). The opening length of the structure parallel to the bridge face is 31.7 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-toroadway is 5 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the left bank upstream, and type-5 (placed stone wall) at the upstream end of the upstream left wingwall, at the downstream end of the downstream left wingwall, and along the downstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 5.6 to 10.0 ft at the left abutment and from 3.1 to 4.2 ft at the right abutment. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge at the left abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 27 (STJOTH00080027) on Town Highway 8, crossing the Sleepers River, St. Johnsbury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STJOTH00080027 on Town Highway 8 crossing the Sleepers River, St. Johnsbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 40.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream right bank with some pasture on the upstream left bank. The downstream right overbank cover is comprised of cut grass, trees and shrubs while the immediate banks have dense woody vegetation. The downstream left bank is forested with some pasture. In the study area, the Sleepers River has an incised, sinuous channel with a slope of approximately 0.007 ft/ft, an average channel top width of 72 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to cobble with a median grain size (D 50 ) of 48.5 mm (0.159 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 10, 1995, indicated that the reach was stable. The Town Highway 8 crossing of the Sleepers River is a 74-ft-long, two-lane bridge consisting of one 71-foot steel-beam span (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 68 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the computed openingskew-to-roadway is 45 degrees. The VTAOT database states the opening-skew-to-roadway as 30 degrees. A scour hole 2.5 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. There is also a three to four foot deep scour hole in the channel adjacent to the upstream right wingwall. The scour protection at the site included type-3 stone fill (less than 48 inches diameter) at the upstream end of the upstream left wingwall, at the downstream end of the downstream right wingwall, and along the downstream left bank. There was also type-2 stone fill (less than 36 inches diameter) at the downstream end of the downstream left wingwall, along the upstream left bank, and along the downstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour computed for all modelled flows was zero ft. Abutment scour ranged from 6.2 to 9.7 ft. The worst-case abutment scour occurred at the 100-year discharge at the right abutment and at the 500-year discharge at the left abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 39 (STOWTH00160039) on Town Highway 16, crossing Moss Glen Brook, Stowe, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STOWTH00160039 on Town Highway 16 crossing Moss Glen Brook, Stowe, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 4.75-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream and on the right bank downstream. The downstream left bank is pasture while the immediate bank has dense woody vegetation. In the study area, Moss Glen Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 52 ft and an average bank height of 7 ft. The channel bed material ranges from sand to cobble with a median grain size (D 50 ) of 56.5 mm (0.185 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 10, 1996, indicated that the reach was stable. The Town Highway 16 crossing of Moss Glen Brook is a 22-ft-long galvanized plate arch culvert with an opening span width of 21 ft (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the culvert face is 20.6 ft. The culvert is supported by vertical, concrete abutments with no wingwalls. The channel is skewed approximately zero degrees to the opening. The opening skew-to-roadway value from the VTAOT database is 5 degrees while zero degrees was computed from surveyed points. The only scour counter measure at the site was type-3 stone fill (less than 48 inches diameter) at the upstream and downstream ends of the left and right abutments and extending along the banks upstream and downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 12.6 to 16.2 ft. Right abutment scour ranged from 12.1 to 14.3 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 21 (WALDTH00450021) on Town Highway 45, crossing Joes Brook, Walden, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WALDTH00450021 on Town Highway 45 crossing Joes Brook, Walden, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The VTAOT files state that the stream is Coles Brook, both the USGS and the VTAOT maps state that it is Joes Brook. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 18.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Joes Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 76 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 75.4 mm (0.247 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 27, 1995, indicated that the reach was stable. The Town Highway 45 crossing of Joes Brook is a 35-ft-long, one-lane bridge consisting of one 29-foot steel-beam span with a wooden deck (Vermont Agency of Transportation, written communication, April 5, 1995). The opening length of the structure parallel to the bridge face is 26.2 ft. The bridge is supported by vertical, “laid-up” concrete block abutments with no wingwalls. The channel is skewed approximately zero degrees to the opening while the computed opening-skew-to-roadway is 5 degrees. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream left bank and along the entire base length of the left abutment. There is also type-2 stone fill (less than 36 inches diameter) along the entire base length of the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 12.4 to 24.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 81 (MARSUS00020081) on U.S. Highway 2, crossing the Winooski River, Marshfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure MARSUS00020081 on U.S. Highway 2 crossing the Winooski River, Marshfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 50.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream of the bridge while the immediate banks have dense woody vegetation. Downstream of the bridge is forested with buildings near the bridge on the right bank. In the study area, the Winooski River has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 83 ft and an average bank height of 10 ft. The channel bed material ranges from cobble to boulder with a median grain size (D 50 ) of 64.0 mm (0.210 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 23, 1996, indicated that the reach was stable. The U.S. Highway 2 crossing of the Winooski River is a 49-ft-long, two-lane bridge consisting of one 47-foot concrete T-beam span (Vermont Agency of Transportation, written communication, November 1, 1995). The opening length of the structure parallel to the bridge face is 44.9 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1 ft deeper than the mean thalweg depth was observed near the upstream left wingwall during the Level I assessment. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) at the upstream end of the upstream left and right wingwall, the downstream end of the downstream left wingwall, and along the upstream left and right banks. There was also type-3 stone fill (less than 48 inches diameter) at the downstream left bank and type-2 stone fill (less than 36 inches diameter) along the downstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 2.1 to 4.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 14.3 to 14.4 ft. The worst-case left abutment scour occurred at the incipient roadwayovertopping and 500-year discharge. Right abutment scour ranged from 15.3 to 18.5 ft. The worst-case right abutment scour occurred at the 100-year and the incipient roadwayovertopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) give “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 38 (BETHTH00070038) on Town Highway 007, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00070038 on town highway 7 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 8.83-mi 2 drainage area is predominantly rural and forested. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, Gilead Brook is an incised, straight channel with a slope of approximately 0.028 ft/ft, an average channel top width of 46 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel (D 50 is 43.9 mm or 0.144 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 18, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Level II scour analysis for Bridge 33 (BETHTH00310033) on Town Highway 031, crossing Lilliesville Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00310033 on town highway 31 crossing the Lilliesville Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 6.85-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left banks have shrub and brush, and the right banks are forested. In the study area, Lilliesville Brook has an incised, straight channel with a slope of approximately 0.02 ft/ft, an average channel top width of 37 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobble (D 50 is 66.8 mm or 0.219 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 13 and 14, 1994, indicated that the reach was stable. The town highway 31 crossing of Lilliesville Brook is a 41-ft-long, one-lane bridge consisting of one 39-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 35 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Scour protection measures in place at the site were type-1 stone fill (less than 12 inches diameter) at the downstream left wingwall, left abutment, and upstream and downstream sides of the left road embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Level II scour analysis for Bridge 32 (BETHTH00380032) on Town Highway 038, crossing Camp Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00380032 on town highway 38 crossing Camp Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files were compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 7.57-mi 2 drainage area is predominantly rural and forested. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, Camp Brook is an incised, mildly sinuous channel with a slope of approximately 0.018 ft/ft, an average channel top width of 50 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobble (D 50 is 66.4 mm or 0.218 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 29, 1994, indicated that the reach was stable. The town highway 38 crossing of Camp Brook is a 32-ft-long, one-lane bridge consisting of one 29-foot span steel beam with timber deck (Vermont Agency of Transportation, written commun., August 23, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. The scour protection measures at the site include type-1 stone fill (less than 12 inches) at both of the US wingwalls, type-2 stone fill (less than 36 inches) at the US and DS right and DS left road approaches. The US right bank is protected by an artificial levee with a mix of stone fill. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Level II scour analysis for Bridge 39 (RANDTH00730039) on Town Highway 73, crossing the Second Branch White River, Randolph, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RANDTH00730039 on town highway 73 crossing the Second Branch White River, Randolph, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Randolph. The 53.7-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the overbanks are covered by pasture except for the upstream right bank which is covered by brush. In the study area, the Second Branch White River has a meandering channel with a slope of approximately 0.001 ft/ft, an average channel top width of 44 ft and an average channel depth of 6 ft. The predominant channel bed material is sand with median grain size (D 50 ) of 0.884 mm (0.0029 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 12, 1994, indicated that the reach was laterally unstable. This is because of severe cut-banks both upstream and downstream where mass wasting and block failure of bank material is evident. Furthermore, minimal erosion protection is provided by bank vegetation since woody vegetation cover is sparse. The town highway 73 crossing of the Second Branch White Riveris a 42-ft-long, one-lane bridge consisting of one 40-foot span (Vermont Agency of Transportation, written communication, August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The ends of the upstream left wingwall and the downstream right wingwall are protected by stone fill. However, this stone fill is slumping according to the Level I field inspection. The channel is skewed approximately 30 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term aggradation or degradation; 2) contraction scour (due to reduction in flow area caused by a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute scour depths for contraction and local scour and a summary of the results follows. Contraction scour for all modelled flows ranged from 1.9 ft to 4.6 ft and the worst-case contraction scour occurred at the incipient overtopping discharge. Abutment scour ranged from 4.0 ft to 22.5 ft and the worst-case abutment scour occurred at the 500-year discharge. Scour depths and depths to armoring are summarized on p. 14 in the section titled “Scour Results”. Scour elevations, based on the calculated depths are presented in tables 1 and 2; a graph of the scour elevations is presented in figure 8 Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. For all scour presented in this report, “the scour depths adopted [by VTAOT] may differ from the equation values based on engineering judgement” (Richardson and others, 1993, p. 21, 27). It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results.

Vermont↗

Level II scour analysis for Bridge 51 (BRIDTH00460051) on Town Highway 46, crossing Ottauquechee River, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00460051 on town highway 46 crossing the Ottauquechee River, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Bridgewater. The 103-mi 2 drainage area is a predominantly rural basin. In the vicinity of the study site, the immediate left and right banks are covered by trees and brush with residences beyond. In the study area, the Ottauquechee River has a straight channel with a slope of approximately 0.008 ft/ft, an average channel top width of 150 ft and an average channel depth of 6 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 81.8 mm (0.268 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 24, 1994, indicated that the reach was stable. The town highway 46 crossing of the Ottauquechee Riveris a 135-ft-long, two-lane bridge consisting of two 66-ft steel-beam spans, supported by vertical, concrete abutments with upstream wingwalls and one concrete pier (Vermont Agency of Transportation, written commun., August 24, 1994). Type-2 stone fill (less than 36 inches diameter) has been placed along the left abutment and both upstream wingwalls. The upstream side of both road embankments are also protected by type-2 stone fill. Abutments of a previous bridge still exist at the downstream side of the present structure’s abutments. The channel is skewed 10 degrees to the bridge face; the opening-skew-to-roadway is 0 degrees. There are remains of a breached dam 160 feet upstream of the bridge which deflect flow toward the left bank. Additional details describing conditions at the site are included in the Level II Summary, Appendix D, and Appendix E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 2.6 to 5.4 ft. The worst-case contraction scour occurred at the incipient overtopping discharge, which was between the 100- and 500-year discharges. Pier scour ranged from 9.9 to 10.9 ft with the worst-case scenario also occurring at the incipient roadway overtopping discharge. Abutment scour ranged from 25.3 to 33.6 ft. with the worst-case occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont↗

Level II scour analysis for Bridge 29 (BRIDTH00360029) on Town Highway 36, crossing North Branch Ottauquechee River, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00360029 on town highway 36 crossing the North Branch Ottauquechee River, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Bridgewater. The 27.1-mi 2 drainage area is a predominantly rural basin. In the vicinity of the study site, the left and right banks are covered by pasture and (or) fields with the immediate stream banks covered by woody vegetation. The left bank of North Branch Ottauquechee River is adjacent to Bridgewater town highway 001. In the study area, the North Branch Ottauquechee River has a sinuous channel with a slope of approximately 0.008 ft/ft, an average channel top width of 73 ft and an average bank height of 6 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 61.0 mm (0.200 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 26, 1994, indicated that the reach was stable. The town highway 36 crossing of the North Branch Ottauquechee Riveris a 46-ft-long, one-lane bridge consisting of one 43-foot steel-beam span (Vermont Agency of Transportation, written communication, August 25, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. Type-2 (less than 36 inches) stone fill protects the upstream and downstream wingwalls. Sparse type-2 stone fill was also observed along the right abutment. The channel approach to the bridge is not skewed, however, the measured opening skew-to-roadway is five degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.4 to 2.8 ft. The worst-case contraction scour occurred at the incipient overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 7.3 to 13.2 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont↗

Level II scour analysis for Bridge 49 (BETHTH00790049) on Town Highway 79, crossing Locust Creek, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00790049 on town highway 79 crossing Locust Creek, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 24.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks are forested. In the study area, Locust Creek has an incised, sinuous channel with a slope of approximately 0.015 ft/ft, an average channel top width of 74 ft and an average channel depth of 6 ft. The predominant channel bed material is gravel and cobble (D 50 is 124 mm or 0.407 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 21 & 26, 1994, respectively, with a check on 12/15/94, indicated that the reach was stable. The town Highway 79 crossing of Locust Creek is a 55-ft-long, one-lane bridge consisting of one 50-foot concrete span (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the opening-skew-toroadway is 45 degrees. Scour protection measures in place at the site were type-1 stone fill (less than 12 inches diameter) at the upstream right and downstream left road embankment, type-2 stone fill (less than 36 inches diameter) at the upstream left bank, upstream wingwalls, and downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of these computed results follow. Contraction scour for all modelled flows ranged from 0.0 ft to 1.0 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 10.3 ft to 13.3 ft. with the worst-case abutment scour also occurring at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated depths, are presented in tables 1 and 2. A cross-section of the computed scour at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 22). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont↗

Level II scour analysis for Bridge 35 (BRNATH00680035) on Town Highway 68, crossing Locust Creek, Barnard, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRNATH00680035 on town highway 68 crossing Locust Creek, Barnard, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Barnard. The 24.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have woody vegetation coverage. In the study area, Locust Creek has an incised sinuous channel with a slope of approximately 0.0133 ft/ft, an average channel top width of 58 ft and an average channel depth of 5 ft. The predominant channel bed material is cobble (D 50 is 135 mm or 0.443 ft). The geomorphic assessment at the time of the Level I and Level II site visits on September 21 and 27, respectively, with a check on December 15, 1994, indicated that the reach was stable. The town highway 68 crossing of Locust Creek is a 30-ft-long, one-lane bridge consisting of one 28-foot concrete slab type superstructure (Vermont Agency of Transportation, written commun., August 23, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is not skewed to the opening and the opening-skew-to-roadway is zero degrees. A scour hole 0.5 ft deeper than the mean thalweg depth was observed along the right abutment and downstream right wingwall during the Level I assessment. The only scour protection measure in place at the site was type-2 stone fill (less than 36 inches diameter) at the left abutment and wingwalls except the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 3.4 ft. The worst-case contraction scour occurred at the incipient overtopping discharge, which was between the 100- and 500-year discharges. Abutment scour ranged from 11.5 to 25.7 ft. with the worst-case scenario occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled "Scour Results". Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives "excessively conservative estimates of scour depths" (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement. and E.

Vermont↗

Level II scour analysis for Bridge 43 (BETHTH00070043) on Town Highway 07, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00070043 on town highway 7 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 6.81-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have dense woody vegetation coverage except for the downstream right bank near the bridge, which is grass covered. In the study area, Gilead Brook has an incised, slightly sinuous channel with a slope of approximately 0.0181 ft/ft, an average channel top width of 36 ft and an average channel depth of 4.0 ft. The predominant channel bed material is cobble (D 50 is 79.6 mm or 0.261 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 19, 1994, indicated that the reach was stable. The town highway 7 crossing of Gilead Brook is a 31-ft-long, two-lane bridge consisting of one 27-foot concrete slab type superstructure (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 30 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 0.5 ft deeper than the mean thalweg depth was observed at the right side of the downstream bridge face during the Level I assessment. The scour protection measures in place at the site were type-1 stone fill (less than 12 inches diameter) along the right abutment and both downstream banks, type-2 stone fill (less than 36 inches diameter) on all of the road approach embankments, both upstream banks, and along the entire base length of the wingwalls. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.4 ft. The worst-case contraction scour occurred at the incipient overtopping discharge, which was between the 100- and 500-year discharges. Abutment scour ranged from 6.6 to 11.0 ft. with the worst-case scenario occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont↗