Geology ReportsSearch

Geology topics

Lara B. Hedrick

Publications and source records attributed to Lara B. Hedrick.

5 recordsLinked to original sources

Fishes of the Blackwater River Drainage, Tucker County, West Virginia

The Blackwater River, a tributary of the upper Cheat River of the Monongahela River, hosts a modest fish fauna. This relatively low diversity of fish species is partly explained by its drainage history. The Blackwater was once part of the prehistoric, northeasterly flowing St. Lawrence River. During the Pleistocene Epoch, the fauna was significantly affected by glacial advance and by proglacial lakes and their associated overflows. After the last glacial retreat, overflow channels, deposits, and scouring altered drainage courses and connected some of the tributaries of the ancient Teays and Pittsburgh drainages. These major alterations allowed the invasion of fishes from North America's more species-rich southern waters. Here we review fish distributions based on 67 surveys at 34 sites within the Blackwater River drainage, and discuss the origin and status of 37 species. Within the Blackwater River watershed, 30 species (20 native, 10 introduced) have been reported from upstream of Blackwater Falls, whereas 29 (26 native, 3 introduced) have been documented below the Falls. Acid mine drainage, historic lumbering, and human encroachment have impacted the Blackwater's ichthyofauna. The fishes that have been most affected are Salvelinus fontinalis (Brook Trout), Clinostomus elongatus (Redside Dace), Nocomis micropogon (River Chub), Hypentelium nigricans (Northern Hog Sucker), Etheostoma flabellare (Fantail Darter), and Percina maculata (Blackside Darter). The first two species incurred range reductions, whereas the latter four were probably extirpated. In the 1990s, acid remediation dramatically improved the water quality of the river below Davis. Recent surveys in the lower drainage revealed 15 fishes where none had been observed since at least the 1940s; seven of these ( Cyprinella spiloptera [Spotfin Shiner], Luxilus chrysocephalus [Striped Shiner], Notropis photogenis [Silver Shiner], N. rubellus [Rosyface Shiner]; Micropterus dolomieu [Smallmouth Bass]; and Etheostoma camurum [Bluebreast Darter] and E. variatum [Variegate Darter]) represent additions to the faunal list of the Blackwater River.

West Virginia

Response of benthic macroinvertebrate communities to highway construction in an Appalachian watershed

Highway construction in mountainous areas can result in sedimentation of streams, negatively impacting stream habitat, water quality, and biotic communities. We assessed the impacts of construction of a segment of Corridor H, a four-lane highway, in the Lost River watershed, West Virginia, by monitoring benthic macroinvertebrate communities and water quality, before, during, and after highway construction and prior to highway use at upstream and downstream sites from 1997 through 2007. Data analysis of temporal impacts of highway construction followed a Before-After-Control-Impact (BACI) study design. Highway construction impacts included an increase in stream sedimentation during the construction phase. This was indicated by an increase in turbidity and total suspended solids. Benthic macroinvertebrate metrics indicated a community more tolerant during and after construction than in the period before construction. The percent of Chironomidae and the Hilsenhoff Biotic Index (HBI) increased, while percent of Ephemeroptera, Plecoptera, and Trichoptera (EPT) decreased. Our 10-year study addressed short-term impacts of highway construction and found that impacts were relatively minimal. A recovery of the number of EPT taxa collected after construction indicated that the benthic macroinvertebrate community may be recovering from impacts of highway construction. However, this study only addressed a period of 3 years before, 3 years during, and 4 years post construction. Inferences cannot be made concerning the long-term impacts of the highway, highway traffic, runoff, and other factors associated with highway use. Continual monitoring of the watershed is necessary to determine if the highway has a continual impact on stream habitat, water quality, and biotic integrity. ?? 2010 Springer Science+Business Media B.V.

Hydrobiologia

Influences of high-flow events on a stream channel altered by construction of a highway bridge: A case study

Impacts of highway construction on streams in the central Appalachians are a growing concern as new roads are created to promote tourism and economic development in the area. Alterations to the streambed of a first-order stream, Sauerkraut Run, Hardy County, WV, during construction of a highway overpass included placement and removal of a temporary culvert, straightening and regrading of a section of stream channel, and armourment of a bank with a reinforced gravel berm. We surveyed longitudinal profiles and cross sections in a reference reach and the altered reach of Sauerkraut Run from 2003 through 2007 to measure physical changes in the streambed. During the four-year period, three high-flow events changed the streambed downstream of construction including channel widening and aggradation and then degradation of the streambed. Upstream of construction, at a reinforced gravel berm, bank erosion was documented. The reference section remained relatively unchanged. Knowledge gained by documenting channel changes in response to natural and anthropogenic variables can be useful for managers and engineers involved in highway construction projects.

West Virginia

Effects of highway construction on stream water quality and macroinvertebrate condition in a mid-Atlantic highlands watershed, USA

Refining best management practices (BMPs) for future highway construction depends on a comprehensive understanding of environmental impacts from current construction methods. Based on a before-after-control impact (BACI) experimental design, long-term stream monitoring (1997–2006) was conducted at upstream (as control, n = 3) and downstream (as impact, n = 6) sites in the Lost River watershed of the Mid-Atlantic Highlands region, West Virginia. Monitoring data were analyzed to assess impacts of during and after highway construction on 15 water quality parameters and macroinvertebrate condition using the West Virginia stream condition index (WVSCI). Principal components analysis (PCA) identified regional primary water quality variances, and paired t tests and time series analysis detected seven highway construction-impacted water quality parameters which were mainly associated with the second principal component. In particular, impacts on turbidity, total suspended solids, and total iron during construction, impacts on chloride and sulfate during and after construction, and impacts on acidity and nitrate after construction were observed at the downstream sites. The construction had statistically significant impacts on macroinvertebrate index scores (i.e., WVSCI) after construction, but did not change the overall good biological condition. Implementing BMPs that address those construction-impacted water quality parameters can be an effective mitigation strategy for future highway construction in this highlands region.

West Virginia

A new sampler design for measuring sedimentation in streams

Sedimentation alters aquatic habitats and negatively affects fish and invertebrate communities but is difficult to quantify. To monitor bed load sedimentation, we designed a sampler with a 10.16-cm polyvinyl chloride coupling and removable sediment trap. We conducted a trial study of our samplers in riffle and pool habitats upstream and downstream of highway construction on a first-order Appalachian stream. Sediment samples were collected over three 6-week intervals, dried, and separated into five size-classes by means of nested sieves (U.S. standard sieve numbers 4, 8, 14, and 20). Downstream sediment accumulated in size-classes 1 and 2, and the total amount accumulated was significantly greater during all three sampling periods. Size-classes 3 and 4 had significantly greater amounts of sediment for the first two sampling periods at the downstream site. Differences between upstream and downstream sites narrowed during the 5-month sampling period. This probably reflects changes in site conditions, including the addition of more effective sediment control measures after the first 6-week period of the study. The sediment sampler design allowed for long-term placement of traps without continual disturbance of the streambed and was successful at providing repeat measures of sediment at paired sites. ?? Copyright by the American Fisheries Society 2005.

North American Journal of Fisheries Management