Geology Reports⌕ Search

Geology topics

H.H. Stevens

Publications and source records attributed to H.H. Stevens.

14 recordsLinked to original sources

Strategies and equipment for sampling suspended sediment and associated toxic chemicals in large rivers - with emphasis on the Mississippi River

A Lagrangian strategy for sampling large rivers, which was developed and tested in the Orinoco and Amazon Rivers of South America during the early 1980s, is now being applied to the study of toxic chemicals in the Mississippi River. A series of 15-20 cross-sections of the Mississippi mainstem and its principal tributaries is sampled by boat in downstream sequence, beginning upriver of St. Louis and concluding downriver of New Orleans 3 weeks later. The timing of the downstream sampling sequence approximates the travel time of the river water. Samples at each cross-section are discharge-weighted to provide concentrations of dissolved and suspended constituents that are converted to fluxes. Water-sediment mixtures are collected from 10-40 equally spaced points across the river width by sequential depth integration at a uniform vertical transit rate. Essential equipment includes (i) a hydraulic winch, for sensitive control of vertical transit rates, and (ii) a collapsible-bag sampler, which allows integrated samples to be collected at all depths in the river. A section is usually sampled in 4-8 h, for a total sample recovery of 100-120 l. Sampled concentrations of suspended silt and clay are reproducible within 3%.

Conference Paper↗

Laboratory data on coarse-sediment transport for bedload-sampler calibrations

A unique facility capable of recirculating and continuously measuring the transport rates of sediment particles ranging in size from about 1 to 75 millimeters in diameter was designed and used in an extensive program involving the calibration of bedload samplers. The facility consisted of a 9-footwide by 6-foot-deep by 272-foot-long rectangular channel that incorporated seven automated collection pans and a sedimentreturn system. The collection pans accumulated, weighed, and periodically dumped bedload falling through a slot in the channel floor. Variations of the Helley-Smith bedload sampler, an Arnhem sampler, and two VUV-type samplers were used to obtain transport rates for comparison with rates measured at the bedload slot (trap). Tests were conducted under 20 different hydraulic and sedimentologic conditions (runs) with 3 uniform-size bed materials and a bed-material mixture. Hydraulic and sedimentologic data collected concurrently with the calibration measurements are described and, in part, summarized in tabular and graphic form. Tables indicate the extent of the data, which are available on magnetic media. The information includes sediment-transport rates; particle-size distributions; water discharges, depths, and slopes; longitudinal profiles of streambed-surface elevations; and temporal records of streambed-surface elevations at fixed locations.

Water Supply Paper↗

Computer programs for computing particle-size statistics of fluvial sediments

Two versions of computer programs for inputing data and computing particle-size statistics of fluvial sediments are presented. The FORTRAN 77 language versions are for use on the Prime computer, and the BASIC language versions are for use on microcomputers. The size-statistics program compute Inman, Trask , and Folk statistical parameters from phi values and sizes determined for 10 specified percent-finer values from inputed size and percent-finer data. The program also determines the percentage gravel, sand, silt, and clay, and the Meyer-Peter effective diameter. Documentation and listings for both versions of the programs are included. (Author 's abstract)

Water-Resources Investigations Report↗

New approach to calibrating bed load samplers

Cyclic variations in bed load discharge at a point, which are an inherent part of the process of bed load movement, complicate calibration of bed load samplers and preclude the use of average rates to define sampling efficiencies. Calibration curves, rather than efficiencies, are derived by two independent methods using data collected with prototype versions of the Helley‐Smith sampler in a large calibration facility capable of continuously measuring transport rates across a 9 ft (2.7 m) width. Results from both methods agree. Composite calibration curves, based on matching probability distribution functions of samples and measured rates from different hydraulic conditions (runs), are obtained for six different versions of the sampler. Sampled rates corrected by the calibration curves agree with measured rates for individual runs.

Journal of Hydraulic Engineering↗

Computer program for the computation of total sediment discharge by the modified Einstein procedure

Two versions of a computer program to compute total sediment discharge by the modified Einstein procedure are presented. The FORTRAN 77 language version is for use on the PRIME computer, and the BASIC language version is for use on most microcomputers. The program contains built-in limitations and input-output options that closely follow the original modified Einstein procedure. Program documentation and listings of both versions of the program are included. (USGS)

Water-Resources Investigations Report↗

Radionuclides in transport in the Columbia River from Pasco to Vancouver, Washington

The radionuclide discharges in the cooling-water effluent of the reactors on the U.S. Atomic Energy Reservation at Hanford, Wash., were formed by neutron activation of: (1) impurities in the Columbia River water used to cool the reactors, (2) corrosion products from the reactor components, and (3) chemicals used in the water-treatment process. Until all the eight reactors that were cooled by once-through flow were shut down, their cooling-water effluents were the main source of dissolved and particulate radionuclides in the Columbia River. Concentrations and discharges of 13 dissolved and particulate radionuclides were observed at Pasco and Vancouver, Wash., for all or parts of the period from January 1964 to September 1966, and at Umatilla, Oreg., from May 1965 to September 1966.

Washington↗