Geology ReportsSearch

Geology topics

Gary L. Rutz

Publications and source records attributed to Gary L. Rutz.

3 recordsLinked to original sources

Investigation of methods for successful installation and operation of Juvenile Salmon Acoustic Telemetry System (JSATS) hydrophones in the Willamette River, Oregon, 2012

Acoustic telemetry equipment was installed at three sites in the Willamette River during October 2012 to test the effectiveness of using the Juvenile Salmon Acoustic Telemetry System to monitor the movements of fish in a high-flow, high-velocity riverine environment. Hydrophones installed on concrete blocks were placed on the bottom of the river, and data cables were run from the hydrophones to shore where they were attached to anchor points. Under relatively low-flow conditions (less than approximately 10,000 cubic feet per second) the monitoring system remained in place and could be used to detect tagged fish as they traveled downstream during their seaward migration. At river discharge over approximately 10,000 cubic feet per second, the hydrophones were damaged and cables were lost because of the large volume of woody debris in the river and the increase in water velocity. Damage at two of the sites was sufficient to prevent data collection. A limited amount of data was collected from the equipment at the third site. Site selection and deployment strategies were re-evaluated, and an alternate deployment methodology was designed for implementation in 2013.

Oregon

Minimizing effects of over-water docks on federally listed fish stocks in McNary Reservoir: A literature review for criteria

McNary Lock and Dam were completed in 1953, creating McNary Reservoir, or Lake Wallula. The shoreline of the reservoir is federally owned and as a result the U.S. Army Corps of Engineers (USACE) has certain land and fish habitat management responsibilities to balance with other multipurpose benefits. The Endangered Species Act (ESA) listing of Columbia and Snake River salmon stocks has changed the management of salmon harvest, hydropower operations, hatchery practices, and habitat management in recent years. There are 12 salmon Oncorhynchus spp., steelhead Oncorhynchus mykiss, and bull trout Salvelinus confluentus evolutionarily significant units (ESU‘s) that use this reach of the Columbia River at one or more stages in their life history. Of those 12, 8 are listed as threatened or endangered under the federal Endangered Species Act. The entire portion of the Columbia River in the Hanford Reach and McNary Reservoir is designated critical habitat for seven ESA-listed salmon species. The USACE is in the process of updating the 1983 McNary Lakeshore Management Plan. The updated Shoreline Plan provides criteria for private use of the federal shoreline of McNary Reservoir, specifically the permitting of private docks, over-water structures, and modifications to shoreline vegetation by adjacent land owners. The previous Shoreline Plan was written prior to the federal listing of salmon species. At the request of the USACE, the purpose of this report is to review information from the literature and determine the extent to which the criteria proposed by USACE for the docks and over-water structures are supported by the current body of scientific knowledge.

Oregon, Washington

Survival and migration behavior of juvenile salmonids at McNary Dam, 2005: Final report of research

During 2005, we used radio-telemetry at McNary Dam to estimate passage and survival parameters of juvenile salmonids. During the spring migration period, two treatments were implemented: 1) 12-h spill operations with spill occurring between 1800 hours and 0600 hours, and 2) 24-h spill with spill occurring 24 hours per day. Treatments were not implemented during the summer migration period. However, a court-order was issued by Judge James Redden, U.S. 9th District Court, mandating a maximum powerhouse discharge of 50 kcfs with the remaining discharge to be spilled over the 24-h diel cycle between 1 July and 31 August 2005. Consequently, our study was conducted during two distinct periods: 1) a short period of involuntary spill for 24-h per day that occurred between 22 June and 30 June 2005, and 2) the period of court-ordered spill that was implemented after 1 July 2005.

Oregon, Washington