Geology ReportsSearch

Geology topics

Emily C. Wild

Publications and source records attributed to Emily C. Wild.

At least 19 recordsLinked to original sources

On-line access to geoscience bibliographic citations

On-line geoscience bibliographic citations and access points to citations are exponentially increasing as commercial, non-profit, and government agencies worldwide publish materials electronically. On-line bibliographic tools capture cited works, and open access content allows for freely obtained citations and documents. For this newsletter, citations from the numerous journals and books listed in the "Recent Papers" section of the EXPLORE newsletters from 2008-2011 were used to provide freely-accessible web sites to determine the availability of bibliographic information.

EXPLORE: Newsletter for the Association of Applied

Review and interpretation of previous work and new data on the hydrogeology of the Schwartzwalder Uranium Mine and vicinity, Jefferson County, Colorado

The Schwartzwalder deposit is the largest known vein type uranium deposit in the United States. Located about eight miles northwest of Golden, Colorado it occurs in Proterozoic metamorphic rocks and was formed by hydrothermal fluid flow, mineralization, and deformation during the Laramide Orogeny. A complex brittle fault zone hosts the deposit comprising locally brecciated carbonate, oxide, and sulfide minerals. Mining of pitchblende, the primary ore mineral, began in 1953 and an extensive network of underground workings was developed. Mine dewatering, treatment of the effluent and its discharge into the adjacent Ralston Creek was done under State permit from about 1990 through about 2008. Mining and dewatering ceased in 2000 and natural groundwater rebound has filled the mine workings to a current elevation that is above Ralston Creek but that is still below the lowest ground level adit. Water in the 'mine pool' has concentrations of dissolved uranium in excess of 1,000 times the U.S. Environmental Protection Agency drinking-water standard of 30 milligrams per liter. Other dissolved constituents such as molybdenum, radium, and sulfate are also present in anomalously high concentrations. Ralston Creek flows in a narrow valley containing Quaternary alluvium predominantly derived from weathering of crystalline bedrock including local mineralized rock. Just upstream of the mine site, two capped and unsaturated waste rock piles with high radioactivity sit on an alluvial terrace. As Ralston Creek flows past the mine site, a host of dissolved metal concentrations increase. Ralston Creek eventually discharges into Ralston Reservoir about 2.5 miles downstream. Because of highly elevated uranium concentrations, the State of Colorado issued an enforcement action against the mine permit holder requiring renewed collection and treatment of alluvial groundwater. As part of planned mine reclamation, abundant data were collected and compiled into a report by Wyman and Effner (2007), which was to be used as a basis for eventual mine site closure. In 2010 the U.S. Geological Survey was asked by the State of Colorado to provide an objective and independent review of the Wyman and Effner (2007) report and to identify gaps in knowledge regarding the hydrogeology of the mine site. Key findings from the U.S. Geological Survey assessment include geological structural analysis indicating that although the primary uranium-hosting fault likely does not cross under Ralston Creek, many complex subsidiary faults do cross under Ralston Creek. It is unknown if any of these faults act as conduits for mine pool water to enter Ralston Creek. Reported bedrock permeabilities are low, but local hydraulic gradients are sufficient to potentially drive groundwater flow from the mine pool to the creek. Estimated average linear velocities for the full range of reported hydraulic conductivities indicate groundwater transit times from the mine pool to the creek on the order of a few months to about 3,800 years or 11 to 65 years using mean reported input values. These estimates do not account for geochemical reactions along any given flow path that may differentially enhance or retard movement of individual dissolved constituents. New reconnaissance data including 34S isotope and 234U/238U isotopic activity ratios show potentially distinctive signatures for the mine pool compared to local groundwater and Ralston Creek water above the mine site. Although the mine pool may be near an equilibrium elevation, evidence for groundwater recharge transients indicates inflow to the workings that are greater than outflow. There is not enough hydraulic head data adjacent to the mine workings to adequately constrain a final equilibrium elevation or to predict how several wet years in succession might affect variations in mine pool elevation. Although ground level adits are sealed with bulkheads, if the mine pool elevation were to rise slightly to the elevation of or abo

Open-File Report

Estimated water use and availability in the Pawtuxet and Quinebaug River basins, Rhode Island, 1995-99

Water availability became a concern in Rhode Island during a drought in 1999, and an investigation was needed to assess demands on the hydrologic system from withdrawals during periods of little to no precipitation. The low water levels during the drought prompted the U.S. Geological Survey and the Rhode Island Water Resources Board to begin a series of studies on water use and availability in each drainage area in Rhode Island for 1995–99. The study area for this report, which includes the Pawtuxet River Basin in central Rhode Island (231.6 square miles) and the Quinebaug River Basin in western Rhode Island (60.97 square miles), was delineated as the surface-water drainage areas of these basins. During the study period from 1995 through 1999, two major water suppliers withdrew an average of 71.86 million gallons per day (Mgal/d) from the Pawtuxet River Basin; of this amount, about 35.98 Mgal/d of potable water were exported to other basins in Rhode Island. The estimated water withdrawals from minor water suppliers were 0.026 Mgal/d in the Pawtuxet River Basin and 0.003 Mgal/d in the Quinebaug River Basin. Total self-supply withdrawals were 2.173 Mgal/d in the Pawtuxet River Basin and 0.360 Mgal/d in the Quinebaug River Basin, which has no public water supply. Total water use averaged 18.07 Mgal/d in the Pawtuxet River Basin and 0.363 Mgal/d in the Quinebaug River Basin. Total return flow in the Pawtuxet River Basin was 30.64 Mgal/d, which included about 12.28 Mgal/d that were imported from other basins in Rhode Island. Total return flow was 0.283 Mgal/d in the Quinebaug River Basin. During times of little to no recharge in the form of precipitation, the surface- and ground-water flows are from storage primarily in the stratified sand and gravel deposits; water also flows through the till deposits, but at a slower rate. The ground water discharging to the streams during times of little to no recharge from precipitation is referred to as base flow. The PART program, a computerized hydrograph-separation application, was used to analyze the data collected at two selected index stream-gaging stations to determine water availability on the basis of the 75th, 50th, and 25th percentiles of the total base flow; the base flow for the 7-day, 10-year low-flow scenario; and the base flow for the Aquatic Base Flow scenario for both stations. The index stream-gaging stations used in the analysis were the Branch River at Forestdale, Rhode Island (period of record 1957–1999) and the Nooseneck River at Nooseneck, Rhode Island (period of record 1964–1980). A regression equation was used to estimate unknown base-flow contributions from sand and gravel deposits at the two stations. The base-flow contributions from sand and gravel deposits and till deposits at the index stations were computed for June, July, August, and September within the periods of record, and divided by the area of each type of surficial deposit at each index station. These months were selected because they define a period when there is usually an increased demand for water and little to no precipitation. The base flows at the stream-gaging station Branch River at Forestdale, Rhode Island were lowest in August at the 75th, 50th, and 25th percentiles (29.67, 21.48, and 13.30 Mgal/d, respectively). The base flows at the stream-gaging station Nooseneck River at Nooseneck, Rhode Island were lowest in September at the 75th percentile (3.551 Mgal/d) and lowest in August at the 50th and 25th percentiles (2.554 and 1.811 Mgal/d). The base flows per unit area for the index stations were multiplied by the areas of sand and gravel and till in the studyarea subbasins to determine the amount of available water for each scenario. The water availability in the Pawtuxet River Basin at the 50th percentile ranged from 126.5 Mgal/d in August to 204.7 Mgal/d in June, and the total gross water availability for the 7-day, 10-year low-flow scenario at the 50th percentile ranged from 112.2 Mgal/d in August to 190.4 Mgal/d in June. The Scituate Reservoir safe yield was 83 Mgal/d in all scenarios. Water availability in the Quinebaug River Basin ranged from 13.94 Mgal/d in August to 30.53 Mgal/d in June at the 50th percentile. The total gross water availability for the 7-day, 10-year low-flow scenario at the 50th percentile ranged from 14.26 Mgal/d in August to 42.69 Mgal/d in June. Because water withdrawals and use are greater during the summer than other times of the year, water availability in June, July, August, and September was compared to water withdrawals in the basin and subbasins. The ratios of water withdrawn to water available were calculated for the 75th, 50th, and 25th percentiles for the subbasins; the closer the ratio is to 1, the closer the withdrawals are to the estimated water available, and the less net water is available. Withdrawals in July were higher than in the other summer months in both basins. In the Pawtuxet River Basin, the ratios were close to 1 in July for the estimated gross yield (from sand and gravel and from till and from the Scituate Reservoir safe yield), 7-day, 10-year low-flow scenario, and Aquatic Base Flow scenario at the 75th percentile and in August for all three scenarios at the 50th and 25th percentiles. In the Quinebaug River Basin, the ratios were close to 1 in August for the estimated gross yield; 7-day, 10-year low-flow scenario; and Aquatic Base Flow scenario. A long-term water budget was calculated for 1941 through 1999 to identify and assess the basin and subbasin inflow and outflows for the Pawtuxet and Quinebaug River Basins. The water withdrawals and return flows used in the budget were from 1995 through 1999. Inflow was assumed to be equal to outflow; total inflows and outflows were 574.9 Mgal/d in the Pawtuxet River Basin and 148.4 Mgal/d in the Quinebaug River Basin. Precipitation and return flow were 95 and 5 percent of the estimated inflows to the Pawtuxet River Basin, respectively. Precipitation was 100 percent of the estimated inflow to the Quinebaug River Basin; return flow was less than 1 percent of the inflow. Evapotranspiration, streamflow, and water withdrawals were 46, 41, and 13 percent, respectively, of the estimated outflows in the Pawtuxet River Basin. Evapotranspiration and streamflow were 49 and 51 percent, respectively, of the estimated outflows in the Quinebaug River Basin. Water withdrawals were less than 1 percent of outflows in the Quinebaug River Basin.

Rhode Island

Estimated water use and availability in the East Narragansett Bay study area, Rhode Island, 1995-99

Water availability became a concern in Rhode Island during a drought in 1999, and further investigation was needed to assess the current demands on the hydrologic system from withdrawals during periods of little to no precipitation. The low ground-water levels and streamflows measured in Rhode Island prompted initiation of a series of studies on water use and availability in each major drainage area in Rhode Island for the period 1995–99. The investigation of the East Narragansett Bay area is the last of these studies. The East Narragansett Bay study area (130.9 square miles) includes small sections of the Ten Mile and Westport River Basins in Rhode Island. The area was divided into three regions (islands and contiguous land areas separated by the bay) within each of which the freshwater water use and availability were assessed. During the study period from 1995 through 1999, three major public water suppliers in the study area withdrew 7.601 million gallons per day (Mgal/d) from ground-water and surface-water reservoirs. The estimated water withdrawals by minor public water suppliers during the study period were 0.063 Mgal/d. Total self-supply domestic, industrial, commercial, and agricultural withdrawals from the study area averaged 1.891 Mgal/d. Total water use in the study area averaged 16.48 Mgal/d, of which about 8.750 Mgal/d was imported from other basins. The average return flow to freshwater within the basin was 2.591 Mgal/d, which included effluent from permitted facilities and septic systems. The average return flow to saltwater (Narragansett Bay) outside of the basin was about 45.21 Mgal/d and included discharges by permitted facilities (wastewater-treatment plants and Rhode Island Pollutant Discharge Elimination Systems). The PART program, a computerized hydrographseparation application, was used for the data collected at two selected index stream-gaging stations in the East Narragansett Bay study area to determine water availability on the basis of the 75th, 50th, and 25th percentiles of the total base flow; the base flow for the 7-day, 10-year low-flow scenario; and the base flow for the Aquatic Base Flow scenario for both stations. Base flows in the study area were lowest in September for the 75th, 50th, and 25th percentiles. The safe yields determined for the surface-water reservoirs (14.10 Mgal/d) were added to the estimated available ground water (gross yield) in the Southeastern Narragansett and East Narragansett Islands regions to give the total available water. The water availability in the study area at the 50th percentile ranged from 33.18 Mgal/d in September to 94.62 Mgal/d in June, water availability for the 7-day, 10-year low-flow scenario at the 50th percentile ranged from 21.87 Mgal/d in September to 83.03 Mgal/d in June, and water availability for the Aquatic Base Flow scenario at the 50th percentile ranged from 14.10 Mgal/d in August and September to 65.48 Mgal/d in June. Because water withdrawals and use are greater during the summer than at other times of the year, water availability in June, July, August, and September was compared to water withdrawals in the three regions. For the study period, the withdrawals in July were higher than in the other summer months. For the 50th percentile, the ratios of water withdrawn to water available were close to one in August for the estimated basic and Aquatic Base Flow scenarios and in September for the estimated 7-day, 10-year low-flow scenario. For the 25th percentile, the ratios were close to one in August for the estimated basic and for the 7-day, 10-year low-flow scenario, and were close to one in July for the estimated Aquatic Base Flow scenario. A long-term water budget was calculated for the East Narragansett Bay study area to identify and assess inflows and outflows by region. The water withdrawals and return flows used in the budget were from 1995 through 1999. Total inflow and outflow were calculated separately for each region. Inflow was assumed to equal outflow; the total water budget was 292.1 Mgal/d for the study area. Precipitation and return flow were 99 and less than 1 percent of the total estimated inflow to the study area, respectively. Evapotranspiration, streamflow, and water withdrawals were 47, 49, and 3 percent of the total outflow from the study area, respectively.

Rhode Island

Water use and availability in the West Narragansett Bay area, coastal Rhode Island, 1995-99

During the 1999 drought in Rhode Island, belowaverage precipitation caused a drop in ground-water levels and streamflow was below long-term averages. The low water levels prompted the U. S. Geological Survey and the Rhode Island Water Resources Board to conduct a series of cooperative water-use studies. The purpose of these studies is to collect and analyze water-use and water-availability data in each drainage area in the State of Rhode Island. The West Narragansett Bay study area, which covers 118 square miles in part or all of 14 towns in coastal Rhode Island, is one of nine areas investigated as part of this effort. The study area includes the western part of Narragansett Bay and Conanicut Island, which is the town of Jamestown. The area was divided into six subbasins for the assessment of water-use data. In the calculation of hydrologic budget and water availability, the Hunt, Annaquatucket, and Pettaquamscutt River Basins were combined into one subbasin because they are hydraulically connected. Eleven major water suppliers served customers in the study area, and they supplied an average of 19.301 million gallons per day during 1995–99. The withdrawals from the only minor supplier, which was in the town of East Greenwich in the Hunt River Basin, averaged 0.002 million gallons per day. The remaining withdrawals were estimated as 1.186 million gallons per day from self-supplied domestic, commercial, industrial, and agricultural users. Return flows from self-disposed water (individual sewage-disposal systems) and permitted discharges accounted for 5.623 million gallons per day. Most publicly disposed water (13.711 million gallons per day) was collected by the Rhode Island Economic Development Corporation, and by the East Greenwich, Fields Point, Jamestown, Narragansett, and Scarborough wastewater-treatment facilities. This wastewater was disposed in Narragansett Bay outside of the study area. The PART program, a computerized hydrograph-separation application, was used to determine water availability in the study area on the basis of low flows measured at a nearby index station, the Pawcatuck River at Wood River Junction, Rhode Island. Water availability was defined as the 75th, 50th, and 25th percentiles of the total base flow; the base flow minus the 7-day, 10-year flow; and the base flow minus the Aquatic Base Flow at the index station. The base-flow contributions per unit area of sand and gravel deposits and of till were computed for June, July, August, and September for the index station and multiplied by the areas of sand and gravel and till in the subbasins. The calculated base flows at the index station were lowest in August at the 75th, 50th, and 25th percentiles for total base flow and for two additional low-flow scenarios. Because water withdrawals and use are greater during June, July, August, and September than at other times of the year, water availability was compared to water withdrawals in the subbasins for these summer months. Ratios were calculated by dividing the summer withdrawals by the water availability at the 75th, 50th, and 25th percentiles, and these percentiles of the base flow minus the two low flows for each subbasin. The closer this ratio is to one, the closer the withdrawals are to the estimated water available. These ratios allow comparisons of the use of water to the available water from one subbasin to another. The ratios were highest in July for the 50th percentile of the estimated gross yield minus the Aquatic Base Flow. The ratios ranged from 0.01 in the Providence and Seekonk subbasin to 0.38 in the Hunt-Annaquatucket-Pettaquamscutt subbasin for the 50th percentile of the gross yield minus the 7Q10 for August. A long-term (1941–2000) water budget was calculated for the study area to assess the basin inflows and outflows. The water withdrawals and return flows used in the budget were from 1995 through 1999. Inflow was assumed to equal outflow. The total water budget was 146.29 million gallons per day for the combined Hunt-Annaquatucket-Pettaquamscutt subbasin, 48.71 million gallons per day for the Greenwich Bay subbasin, 238.98 million gallons per day for the Providence and Seekonk Rivers subbasin, and 21.32 million gallons per day for the Conanicut Island subbasin. The estimated inflows from precipitation, streamflow from upstream basins, and wastewater return flow for the entire study area were 59.3, 38.5, and 2.2 percent, respectively. The estimated outflows for the study area from evapotranspiration, streamflow, and water withdrawals were 24.9, 73.9, and 1.2 percent, respectively.

Rhode Island

Estimated water use and availability in the South Coastal Drainage Basin, southern Rhode Island, 1995-99

The South Coastal Drainage Basin includes approximately 59.14 square miles in southern Rhode Island. The basin was divided into three subbasins to assess the water use and availability: the Saugatucket, Point Judith Pond, and the Southwestern Coastal Drainage subbasins. Because there is limited information on the ground-water system in this basin, the water use and availability evaluations for these subbasins were derived from delineated surface-water drainage areas. An assessment was completed to estimate water withdrawals, use, and return flow over a 5-year study period from 1995 through 1999 in the basin. During the study period, one major water supplier in the basin withdrew an average of 0.389 million gallons per day from the sand and gravel deposits. Most of the potable water is imported (about 2.152 million gallons per day) from the adjacent Pawcatuck Basin to the northwest. The estimated water withdrawals from the minor water suppliers, which are all in Charlestown, during the study period were 0.064 million gallons per day. The self-supplied domestic, industrial, commercial, and agricultural withdrawals from the basin were 0.574 million gallons per day. Water use in the basin was 2.874 million gallons per day. The average return flow in the basin was 1.190 million gallons per day, which was entirely from self-disposed water users. In this basin, wastewater from service collection areas was exported (about 1.139 million gallons per day) to the Narragansett Bay Drainage Basin for treatment and discharge. During times of little to no recharge, in the form of precipitation, the surface- and ground-water system flows are from storage primarily in the stratified sand and gravel deposits, although there is flow moving through the till deposits at a slower rate. The ground water discharging to the streams, during times of little to no precipitation, is referred to as base flow. The PART program, a computerized hydrograph-separation application, was used at the selected index stream-gaging station to determine water availability based on the 75th, 50th, and 25th percentiles of the total base flow, the base flow minus the 7-day, 10-year flow criteria, and the base flow minus the Aquatic Base Flow criteria at the index station. The base flow calculated at the selected index station was subdivided into two rates on the basis of the percent contributions from sandand-gravel and till deposits. There has been no long-term collection of surface-water data in this study area and therefore an index stream-gaging station in the Pawcatuck Basin was used for the South Coastal Drainage Basin. The Pawcatuck River at Wood River Junction was chosen as the index station for the South Coastal Drainage Basin because the station is representative of the basin on the basis of the percentage of sand and gravel deposits and the average extent of thickness of the sand and gravel deposits. The baseflow contributions from sand and gravel deposits at the index station were computed for June, July, August, and September, and applied to the percentage of surficial deposits at the index station. The base-flow contributions were converted to a per unit area at the station for the till, and for the sand and gravel deposits and applied to the South Coastal Drainage Basin to determine the water availability. The results from the index station, the Pawcatuck River at Wood River Junction streamgaging station, were lowest for the summer in September. To determine water availability in the South Coastal Drainage Basin, the per unit area of the estimated base flows from sand and gravel deposits and till deposits at the index station was applied to the subbasin areas, and the resultant flows were lowest in September. The base flow at the 75th percentile in the basin was 56.95 million gallons per day in June; 32.78 million gallons per day in July; 30.22 million gallons per day in August; and 23.94 million gallons per day in September. The base flow at the 50th percentile in the basin was 44.59 million gallons per day in June; 25.31 million gallons per day in July; 20.75 million gallons per day in August; and 17.01 million gallons per day in September. The base flow at the 25th percentile in the basin was 35.52 million gallons per day in June; 20.40 million gallons per day in July; 14.94 million gallons per day in August; and 12.00 million gallons per day in September. There are some limitations in the application of this method along the coast, because saltwater intrusion can change the amount of fresh ground-water discharge to the coastal saltwater ecosystem. A ground-water system analysis evaluating these variances would provide additional information to assess the water availability along the coast. Because water withdrawals and use are greater during the summer than other times of the year, water availability in June, July, August, and September was assessed and compared to water withdrawals in the basin. The ratios were calculated by dividing the water withdrawals by the water-availability flow scenarios at the 75th, 50th, and 25th percentiles for the basin, which are based on total water available from base-flow contributions from till and sand and gravel deposits in the basin. The closer the ratio is to one, the closer the withdrawals are to the estimated water available, and the net water available decreases. For the study period, the withdrawals in July were higher than the other summer months. The ratios in the basin for the base-flow scenario, with no low-flow criteria removed, ranged from 0.029 to 0.046 in June; 0.059 to 0.094 in July; 0.050 to 0.100 in August; and 0.040 to 0.079 in September. A long-term hydrologic budget (60 years) was calculated for the South Coastal Drainage Basin to identify and assess the basin and subbasin inflow and outflows. This coastal basin is different than other study areas because all three of the subbasins drain into salt water, Point Judith Point, Long Island Sound, and Rhode Island Sound towards the Atlantic Ocean, or internally within the subbasin to the salt ponds. The hydrologic budgets, therefore, were compiled by subbasin. The basin hydrologic budget is the sum of the three subbasin budgets. Unlike a river subbasin drainage system, however, the estimated streamflows out of the subbasins were also considered outflows from the basin. The water withdrawals and return flows used in the budget were from 1995 through 1999. For the hydrologic budget, it was assumed that inflow equals outflow, where the estimated inflows were from precipitation and wastewater-return flow, and the estimated outflows were from evapotranspiration, streamflow, and water withdrawals.

Rhode Island

Water use and availability in the Woonasquatucket and Moshassuck River basins, north-central Rhode Island

The Woonasquatucket River Basin includes 51.0 square miles, and the Moshassuck River Basin includes 23.8 square miles in north-central Rhode Island. The study area comprises these two basins. The two basins border each other with the Moshassuck River Basin to the northeast of the Woonasquatucket River Basin. Seven towns are in the Woonasquatucket River Basin, and six towns are in the Moshassuck River Basin. To determine the water use and availability in the study area, water supply and discharge data were collected for these river basins for the 1995–99 period, and compared to estimated long-term water available. The study area is unique in the State of Rhode Island, because no withdrawals from major public suppliers were made during the study period. Withdrawals were, therefore, limited to self-supplied domestic use, two minor suppliers, and one self-supplied industrial user. Because no metered data were available, the summer water withdrawals were assumed to be the same as the estimates for the rest of the year. Seven major water suppliers distribute an average of 17.564 million gallons per day for use in the study area from sources outside of the study area. The withdrawals from minor water suppliers were 0.017 million gallons per day in the study area, all in the town of Smithfield in the Woonasquatucket River Basin. The remaining withdrawals in the study area were estimated to be 0.731 million gallons per day by self-supplied domestic, commercial, industrial, and agricultural users. Return flows in the study area included self-disposed water and disposal from permitted dischargers, including the Smithfield Sewage Treatment Plant. Return flows accounted for 4.116 million gallons per day in the study area. Most public-disposed water (15.195 million gallons per day) is collected by the Narragansett Bay Commission and is disposed outside of the basin in Narragansett Bay. The PART program, a computerized hydrograph-separation application, was used at one index stream-gaging station to determine water availability based on the 75th, 50th, and 25th percentiles of the total base flow, the base flow minus the 7-day, 10-year flow criteria, and the base flow minus the Aquatic Base Flow criteria. The index station selected was the Branch River at Forestdale, which is close to the study area and has a similar percentage of sand and gravel area. Water availability was estimated on the basis of baseflow contributions from sand and gravel deposits and till deposits at the index station. Flows were computed for June, July, August, and September 1957–2000, and a percentage of the total flow was determined to come from either sand and gravel deposits, or till, by using a regression equation. The base-flow contributions were converted to a flow per unit area at the station for the till and for the sand and gravel deposits and then applied to the deposits in the study area basins. These values were used to estimate the gross yield of base flow, as well as to subtract the two low flows (7-day, 10-year flow, and Aquatic Base Flow criteria). The results from the Branch River stream-gaging station were lowest in August at the 75th, 50th, and 25th percentile for total flow with either flow criteria subtracted. The estimated August gross yield at the 50th percentile from the Woonasquatucket River Basin was 12.94 million gallons per day, and 5.91 million gallons per day from the Moshassuck River Basin. A ratio was calculated that is equal to total withdrawals divided by water availability. Water-availability flow scenarios at the 75th, 50th, and 25th percentiles for the basins, which are based on total water available from base-flow contributions from till and sand and gravel deposits in the basins, were assessed. The ratios were the highest in July for the 50th percentile estimated gross yield minus Aquatic Base Flow (ABF) flow criteria, where withdrawals are close to the available water. Ratios are not presented if the available water is less than the flow criteria. The ratio of withdrawals to the July gross yield at the 50th percentile minus Aquatic Base Flow was 0.796 for the Woonasquatucket and 0.275 for the Moshassuck River Basin. A long-term hydrologic budget was calculated for the period of 1956–2000 for the Woonasquatucket River Basin and the period of 1964–2000 for the Moshassuck River Basin. The water withdrawals and return flows used in the budget were from 1995 through 1999. For the hydrologic budget, inflow was assumed to equal outflow and was about 120 million gallons per day in the Woonasquatucket River Basin and 56 million gallons per day in the Moshassuck River Basin. The estimated inflows from precipitation and water return flow were 97.3 and 2.7 percent, respectively, in the Woonasquatucket River Basin, and 98.3 and 1.7 percent, respectively, in the Moshassuck River Basin. The estimated outflows from evapotranspiration, streamflow, and water withdrawals were 43.4, 56.1, and 0.5 percent, respectively, in the Woonasquatucket River Basin, and 49.8, 50, and 0.2 percent, respectively, in the Moshassuck River Basin.

Rhode Island

Estimated water use and availability in the Pawcatuck Basin, southern Rhode Island and southeastern Connecticut, 1995-99

In 1988, the Pawcatuck Basin (302.4 square miles) in southern Rhode Island (245.3 square miles) and southeastern Connecticut (57.12 square miles) was defined as a sole-source aquifer for 14 towns in southern Rhode Island and 4 towns in southeastern Connecticut. To determine water use and availability, the six subbasins in the Pawcatuck Basin were delineated on the basis of the surface- and ground-water system drainage areas. From 1995 through 1999, five major water suppliers in the basin withdrew an average of 6.768 million gallons per day from the aquifers. The estimated water withdrawals from minor water suppliers during the study period were 0.099 million gallons per day. Self-supplied domestic, industrial, commercial, and agricultural withdrawals from the basin averaged 4.386 million gallons per day. Water use in the basin averaged 7.401 million gallons per day. The average return flow in the basin was 7.855 million gallons per day, which included effluent from permitted facilities and self-disposed water users. The PART program, a computerized hydrographseparation application, was used for five selected index streamgaging stations to determine water availability on the basis of the 75th, 50th, and 25th percentiles of the total base flow, the base flow minus the 7-day, 10-year flow criteria, and the base flow minus the Aquatic Base Flow criteria at the index stations. The differences in the surface- and ground-water system drainage areas in the summer were applied to the water availability calculated at the index stations and subbasins. The base-flow contributions from sand and gravel deposits at the index stations were computed for June, July, August, and September, and applied to the percentage of surficial deposits at each index station. The base-flow contributions were converted to a per unit area at the station for the till, and for the sand and gravel deposits, and applied to the subbasins. The statistics used to estimate the gross yield of base flow, as well as subtracting out the two low-flow criteria, resulted in various wateravailability values at each index station, which were present in the subbasin after applying the per unit area rates from the index station. The results from the Chipuxet and Arcadia streamgaging stations were lowest in September at the 75th and 25th percentiles, and August flows were lowest for the summer at the 50th percentile. For the other three index stations, September flows were the lowest for the summer. Because water withdrawals and use are greater during the summer than other times of the year, water availability in June, July, August, and September was assessed and compared to water withdrawals in the basin and subbasins. The ratios were calculated by using the water-availability flow scenarios at the 75th, 50th, and 25th percentiles for the subbasins, which are based on total water available from base-flow contributions from till deposits and sand and gravel deposits in the subbasins. For the study period, the withdrawals in August were higher than the other summer months. The ratios were close to one in August for the estimated gross yield and 7-day, 10-year flow criterion, and were close to one in September for the estimated Aquatic Base Flow criterion water-availability scenarios in the Pawcatuck Basin. The closer the ratio is to one, the closer the withdrawals are to the estimated water available, and the net water available decreases. To determine the effects of streamflow depletion from continuous water withdrawals, the program STRMDEPL was used to simulate public wells and well fields at a constant pumping rate based on the 1999 summer average for each withdrawal, over a period of 180 days. The streamflow depletion was 86, 95, 93, 96, and 98 percent at 30 days for Kingston wells 1 and 2, Westerly well fields 1 and 2, and well 3, respectively. A long-term hydrologic budget was calculated for the Pawcatuck Basin to identify and assess the basin and subbasin inflow and outflows. The water withdrawals and return flows used in the budget were from 1995 through 1999. For the hydrologic budget, it was assumed that inflow equals outflow, which resulted in 723.1 million gallons per day in the basin. The estimated inflows from precipitation and water return flow were 99 and 1 percent in the basin, respectively. The estimated outflows from evapotranspiration, streamflow, and water withdrawals were 43, 56, and 1 percent, respectively.

Connecticut, Rhode Island

Bibliography on the occurrence and intrusion of saltwater in aquifers along the Atlantic Coast of the United States

Freshwater aquifers along the Atlantic coast of the United States are vulnerable to the intrusion of saltwater from saline waters that bound the aquifers along their seaward margins. Incidences of saltwater intrusion have been documented along the Atlantic coast for more than 100 years. This report provides a bibliography of published literature relating to the occurrence and intrusion of saltwater along the Atlantic coast of the United States, including all of the coastal States from Maine to Florida (including the coast of Florida along the Gulf of Mexico). The bibliography contains 549 references that date from 1896 to 2001. The bibliography contains references to books, journal articles, and government and other technical reports and maps that could be readily obtained through a scientific library. Conference papers and abstracts, unpublished manuscripts, publications in press, newspaper articles, consulting reports, and reports prepared by local or regional water companies or water districts are omitted from the bibliography.

Connecticut, Delaware, Florida, Georgia, Maine, Ma

Online bibliographic sources in hydrology

Traditional commercial bibliographic databases and indexes provide some access to hydrology materials produced by the government; however, these sources do not provide comprehensive coverage of relevant hydrologic publications. This paper discusses bibliographic information available from the federal government and state geological surveys, water resources agencies, and depositories. In addition to information in these databases, the paper describes the scope, styles of citing, subject terminology, and the ways these information sources are currently being searched, formally and informally, by hydrologists. Information available from the federal and state agencies and from the state depositories might be missed by limiting searches to commercially distributed databases.

Science and Technology Libraries

Level II scour analysis for Bridge 17 (NEWHTH00200017) on Town Highway 20, crossing Little Otter Creek, New Haven, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NEWHTH00200017 on Town Highway 20 crossing Little Otter Creek, New Haven, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Champlain section of the St. Lawrence Valley physiographic province in west-central Vermont. The 10.8-mi 2 drainage area is in a predominantly rural and wetland basin. In the vicinity of the study site, the surface cover is shrubland on the downstream right overbank. The surface cover of the downstream left overbank, the upstream right overbank and the upstream left overbank is wetland and pasture. In the study area, Little Otter Creek has a meandering channel with a slope of approximately 0.0007 ft/ft, an average channel top width of 97 ft and an average bank height of 5 ft. The channel bed material ranges from silt and clay to cobble. Medium sized silt and clay is the channel material upstream of the approach cross-section and downstream of the exit cross-section. The median grain size (D 50 ) of the silt and clay channel bed material is 1.52 mm (0.005 ft), which was used for contraction and abutment scour computations. From the approach cross-section, under the bridge, and to the exit cross-section, stone fill is the channel bed material. The median grain size (D 50 ) of the stone fill channel bed material is 95.7 mm (0.314 ft). The stone fill median grain size was used solely for armoring computations. The geomorphic assessment at the time of the Level I and Level II site visit on June 11, 1996, indicated that the reach was stable. The Town Highway 20 crossing of Little Otter Creek is a 32-ft-long, two-lane bridge consisting of a 28-ft steel-beam span (Vermont Agency of Transportation, written communication, December 15, 1995). The opening length of the structure parallel to the bridge face is 24.9 ft. The bridge is supported by almost vertical, concrete abutments. The channel is skewed approximately 15 degrees to the opening while the opening-skew-toroadway is zero degrees. The scour countermeasures at the site consisted of type-1 stone fill (less than 12 inches diameter) along the left and right abutments, as well as along the upstream left and right banks. Type-2 stone fill (less than 36 inches diameter) was present along the downstream right bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 9.7 to 13.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 6.9 to 7.9 ft. Right abutment scour ranged from 10.5 to 11.8 ft. The worst-case left and right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 27 (WSTOTH00070027) on Town Highway 7, crossing Jenny Coolidge Brook, Weston, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WSTOTH00070027 on Town Highway 7 crossing Jenny Coolidge Brook, Weston, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in southwestern Vermont. The 2.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture downstream of the bridge while upstream of the bridge is forested. In the study area, the Jenny Coolidge Brook has an incised, sinuous channel with a slope of approximately 0.04 ft/ft, an average channel top width of 51 ft and an average bank height of 6 ft. The channel bed material ranges from sand to boulders with a median grain size (D 50 ) of 122 mm (0.339 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 20, 1996, indicated that the reach was stable. The Town Highway 7 crossing of the Jenny Coolidge Brook is a 52-ft-long, two-lane bridge consisting of a 50-foot steel-beam span (Vermont Agency of Transportation, written communication, April 7, 1995). The opening length of the structure parallel to the bridge face is 49.2 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the computed opening-skew-to-roadway is 15 degrees. The legs of the skeleton-type right abutment were exposed approximately 2 feet (vertically) and approximately 2 feet (horizontally) during the Level I assessment. Scour protection measures at the site include type-1 stone fill (less than 12 inches diameter) along the downstream right wingwall, and type-2 stone fill (less than 36 inches diameter) along the upstream banks, upstream left wingwall, left abutment, downstream left wingwall and downstream left bank. A stone wall levee extends along the downstream right bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was zero ft. Abutment scour ranged from 3.0 to 4.1 ft. The worst-case left abutment scour occurred at the 100-year discharge. The worst-case right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 13 (LINCTH00010013) on Town Highway 1, crossing Cota Brook, Lincoln, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure LINCTH00010013 on Town Highway 1 crossing Cota Brook, Lincoln, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 3.0-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest along the upstream right bank and brushland along the upstream left bank. Downstream of the bridge, the surface cover is pasture along the left and right banks. In the study area, Cota Brook has an sinuous channel with a slope of approximately 0.01 ft/ ft, an average channel top width of 30 ft and an average bank height of 2 ft. The channel bed material ranges from sand to cobble with a median grain size (D50) of 34.7 mm (0.114 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 10, 1996, indicated that the reach was laterally unstable due to cut-banks and wide, vegetated point bars upstream and downstream of the bridge. The Town Highway 1 crossing of Cota Brook is a 38-ft-long, two-lane bridge consisting of a 36-foot steel-stringer span (Vermont Agency of Transportation, written communication, December 14, 1995). The opening length of the structure parallel to the bridge face is 34.4 ft. The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 2.0 ft deeper than the mean thalweg depth was observed along the upstream right bank during the Level I assessment. Along the right abutment, it is 0.25 ft deeper than the mean thalweg depth. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream right bank and type-2 stone fill (less than 36 inches diameter) along the left and right abutments and along the downstream left bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.7 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 9.1 to 11.3 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 46 (LINCTH00060046) on Town Highway 6, crossing the New Haven River, Lincoln, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure LINCTH00060046 on Town Highway 6 crossing the New Haven River, Lincoln, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 45.9-mi 2 drainage area is in a predominantly suburban and forested basin. In the vicinity of the study site, the surface cover is forest upstream of the bridge. The downstream right overbank near the bridge is suburban with buildings, homes, lawns, and pavement (less than fifty percent). The downstream left overbank is brushland while the immediate banks have dense woody vegetation. In the study area, the New Haven River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 95 ft and an average bank height of 7 ft. The channel bed material ranges from sand to bedrock with a median grain size (D 50 ) of 120.7 mm (0.396 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 13, 1996, indicated that the reach was stable. The Town Highway 34 crossing of the New Haven River is a 85-ft-long, two-lane bridge consisting of an 80-foot steel arch truss (Vermont Agency of Transportation, written communication, December 14, 1995). The opening length of the structure parallel to the bridge face is 69 feet. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 5 degrees. A scour hole 2.0 ft deeper than the mean thalweg depth was observed in the downstream channel during the Level I assessment. Protection measures at the site include type-1 stone fill (less than 12 inches diameter) at the upstream left wingwall, type-2 stone fill (less than 36 inches diameter) at the downstream end of the downstream left wingwall, and type-3 stone fill (less than 48 inches diameter) at the upstream right wingwall and the downstream end of the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.7 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge. Left abutment scour ranged from 12.9 to 17.8 ft. Right abutment scour ranged from 5.9 to 11.9 ft. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 32 (FERRTH00190032) on Town Highway 19, crossing the South Slang Little Otter Creek, Ferrisburgh, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FERRTH00190032 on Town Highway 19 crossing the South Slang Little Otter Creek (Hawkins Slang Brook), Ferrisburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Champlain section of the St. Lawrence Valley physiographic province in west-central Vermont. The 8.00-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of wetlands upstream and downstream of the bridge with trees and pasture on the wide flood plains. In the study area, the South Slang Little Otter Creek has a meandering channel with essentially no channel slope, an average channel top width of 932 ft and an average bank height of 6 ft. The channel bed material ranges from clay to sand. Sieve analysis indicates that greater than 50% of the sample is coarse silt and clay and thus a medium grain size by use of sieve analysis was indeterminate. The median grain size was assumed to be a course silt with a size (D 50 ) of 0.061mm (0.0002 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 2, 1996, indicated that the reach was stable. The Town Highway 19 crossing of the South Slang Little Otter Creek is a 45-ft-long, twolane bridge consisting of one 42-foot concrete box-beam span (Vermont Agency of Transportation, written communication, December 11, 1995). The opening length of the structure parallel to the bridge face is 41.8 ft. The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 3.5 ft deeper than the mean thalweg depth was observed in the upstream channel. Also a scour hole 2.0 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. The scour protection measures at the site are type-1 stone fill (less than 12 inches diameter) around the left and right abutments, along the upstream and downstream road embankments, and across the entire upstream and downstream bridge face. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 14.0 to 20.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.2 to 8.3 ft. The worst-case abutment scour occurred at the 500-year discharge. The predicted scour is well above the pile bottom elevations. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 33 (WWINTH00300033) on Town Highway 30, crossing Mill Brook, West Windsor, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WWINTH00300033 on Town Highway 30 crossing Mill Brook, West Windsor, Vermont (Figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 24.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream of the bridge while the immediate banks have dense woody vegetation. Downstream of the bridge is forested. In the study area, Mill Brook has an incised, sinuous channel with a slope of approximately 0.004 ft/ft, an average channel top width of 58 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 65.7 mm (0.215 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 5, 1996, indicated that the reach was stable. The Town Highway 30 crossing of the Mill Brook is a 46-ft-long, one-lane covered bridge consisting of a 40-foot wood-beam span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 36.3 ft. The bridge is supported by vertical, concrete capped laid-up stone abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream right bank, the upstream right wingwall, the right abutment and the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was analyzed since it had the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.0 to 16.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 42 (NEWFTH00350042) on Town Highway 35, crossing Stratton Hill Brook, Newfane, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NEWFTH00350042 on Town Highway 35 crossing Stratton Hill Brook, Newfane, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 1.16-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forested. In the study area, Stratton Hill Brook has an incised, striaght channel with a slope of approximately 0.1 ft/ft, an average channel top width of 36 ft and an average bank height of 8 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 121 mm (0.396 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 20, 1996, indicated that the reach was stable. The Town Highway 34 crossing of Stratton Hill Brook is a 34-ft-long, one-lane bridge consisting of a 32-foot steel-beam span (Vermont Agency of Transportation, written communication, April 6, 1995). The opening length of the structure parallel to the bridge face is 30.8 ft. The bridge is supported by vertical, concrete abutments with upstream wingwalls. The channel is skewed approximately 20 degrees to the opening while the computed opening-skew-to-roadway is 15 degrees. During the Level I assessment, it was observed that the right abutment footing was exposed 1.5 feet. The only scour protection measure at the site was type-1 stone fill (less than 12 inches diameter) along the downstream left bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was zero ft. Abutment scour ranged from 2.3 to 3.3 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 46 (FFIETH00470046) on Town Highway 47, crossing Black Creek, Fairfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00470046 on Town Highway 47 crossing Black Creek, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gathered from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 37.8 mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Black Creek has a meandering channel with a slope of approximately 0.0005 ft/ft, an average channel top width of 51 ft and an average bank height of 6 ft. The channel bed material ranges from sand to bedrock with a median grain size (D 50 ) of 0.189 mm (0.00062 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 12, 1995, indicated that the reach was stable. The Town Highway 47 crossing of Black Creek is a 35-ft-long, one-lane bridge consisting of one 31-ft steel-stringer span (Vermont Agency of Transportation, written communication, March 8, 1995). The opening length of the structure parallel to the bridge face is 28.0 ft. The bridge is supported by vertical, laid-up stone abutments with wingwalls. The channel is skewed approximately zero degrees to the opening and the opening-skew-toroadway is zero degrees. A scour hole 6.0 ft deeper than the mean thalweg depth was observed just downstream of the bridge during the Level I assessment. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the left abutment. Type-2 stone fill (less than 36 inches diameter) extended along the upstream left and right banks, the upstream left and right wingwalls, the downstream left wingwall, and the downstream left bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.4 to 8.2 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 5.8 to 15.6 ft. At the left abutment, the worst-case abutment scour occurred at the 100-year discharge, and at the right abutment the worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results.” Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont