Fourth progress report on the cooperative investigation of springs and streamflow in the Tecolote Tunnel area of Santa Barbara County, California

This is a continuation of annual progress reports giving the results of discharge measurements made in the Santa Ynez Mountains between Refugio Canyon on the west to San Marcos Pass and the Painted Cave area on the east. This portion of Santa Barbara County has been designated as the "Tecolote Tunnel Area" because a tunnel by that name, now being built by the Bureau of Reclamation, passes through it. The purpose of this tunnel is to divert flood runoff from the Santa Ynez River, stored in Cachuma Reservoir, to the city of Santa Barbara and adjacent areas. During the construction of this tunnel, the seepage from the south portal has averaged 6.4 second-feet for the year ending April 30, 1952, the average being 8.7 second-feet for the last 6 months of that period. Both of these values exceed the average total discharge prior to April 30, 1951, for more than 120 springs measured in the Tecolote Tunnel Area. As, it was not known what effect the seepage from this tunnel might have on the flow of springs and streams in the immediate vicinity, the Santa Barbara County Water Agency requested the U. S. Geological Survey to institute an observational program. This program was started in 1948—about 2 years before work was started on the tunnel. The area covered by the observational program was made sufficiently large to include all the springs that could possibly be affected, as well as certain border springs believed to be outside the zone of influence. The purpose of this, the fourth progress report, is to make available factual data obtained during the year ending April 30, 1952. This program is operated under a cooperative agreement between the U. S. Geological Survey and the Santa Barbara County Water Agency whereby each pays half the cost of the investigation.

California↗

Second progress report on the cooperative investigation of springs and stream flow in the Tecolote Tunnel area of Santa Barbara County, California

This report represents the second of a series of progress reports giving the results of discharge measurements made at more than 100 locations in the Santa Ynez Mountains from the Refugio Canyon on the west to the San Marcos Pass and Painted Cave area on the east. The flow in all the developed springs and headwater streams within this area, here designated as the Tecolote Tunnel Area of the purpose of this report, is generally measured monthly. The primary purpose of this second progress report is to make available to the public all factual data regarding the flow at these locations obtained since the preparation of the first progress report, issued in May 1949. Near the mid-point of this area the Bureau of Reclamation and the Santa Barbara County Water Agency proposed a tunnel, known as Tecolote Tunnel, for the purpose of diverting a portion of the runoff of the Santa Ynez River drainage area into water-deficient Santa Barbara and the coastal areas to the east and west, Because the water users of the mountain springs in the Tecolote Tunnel Area are somewhat apprehensive as to the influence this tunnel may have on their present water supply, the Santa Barbara Water Agency has requested the Geological Survey to obtain records of flow in their springs at frequent and regular intervals. During the current fiscal year these observations have been made as a result of a cooperative agreement between the Geological Survey and the Santa Barbara County Water Agency whereby each paid half the cost of the investigation. During the previous fiscal year all the costs to the Geological Survey in obtaining these observations were completely reimbursed by the Bureau of Reclamation.

California↗