Geology Reports⌕ Search

Geology topics

C. Dang

Publications and source records attributed to C. Dang.

2 recordsLinked to original sources

Debris flows resulting from glacial-lake outburst floods in tibet, China

During the last 70 years of general climatic amelioration, 18 glacial-lake outburst floods (GLOFs) and related debris flows have occurred from 15 moraine-dammed lakes in Tibet, China. Catastrophic loss of life and property has occurred because of the following factors: the large volumes of water discharged, the steep gradients of the U-shaped channels, and the amount and texture of the downstream channel bed and bank material. The peak discharge of each GLOF exceeded 1000 m3/s. These flood discharges transformed to non-cohesive debris flows if the channels contained sufficient loose sediment for entrainment (bulking) and if their gradients were >1%. We focus on this key element, transformation, and suggest that it be included in evaluating future GLOF-related risk, the probability of transformation to debris flow and hyperconcentrated flow. The general, sequential evolution of the flows can be described as from proximal GLOFs, to sedimentladen streamflow, to hyperconcentrated flow, to non-cohesive debris flow (viscous or cohesive debris flow only if sufficient fine sediment is present), and then, distally, back to hyperconcentrated flow and sediment-laden streamflow as sediment is progressively deposited. Most of the Tibet examples transformed only to non-cohesive debris flows. The important lesson for future hazard assessment and mitigation planning is that, as a GLOF entrains (bulks) enough sediment to become a debris flow, the flow volume must increase by at least three times (the "bulking factor"). In fact, the transforming flow waves overrun and mix with downstream streamflow, in addition to adding the entrained sediment (and thus enabling addition of yet more sediment and a bulking factor in excess of three times). To effectively reduce the risk of GLOF debris flows, reducing the level of a potentially dangerous lake with a siphon or excavated spillway or installing gabions in combination with a downstream debris dam are the primary approaches.

Physical Geography↗

Landslide-dammed lake at Tangjiashan, Sichuan province, China (triggered by the Wenchuan Earthquake, May 12, 2008): Risk assessment, mitigation strategy, and lessons learned

Landslides and rock avalanches triggered by the 2008 Wenchuan Earthquake produced 257 landslide dams, mainly situated along the eastern boundary of the Qinghai-Tibet Plateau where rivers descend approximately 3,000 m into the Sichuan Basin. The largest of these dams blocked the Tongkou River (a tributary of the Fujiang River) at Tangjiashan. The blockage, consisting of 2.04 × 10 7 m 3 of landslide debris, impounded a lake with a projected maximum volume of 3.15 × 10 8 m 3 , potentially inundating 8.92 km 2 of terrain. Its creation during the rainy season and the possibility of an uncontrolled release posed a serious, impending threat to at least 1.3 million people downstream that could add substantially to the total of 69,200 individuals directly killed by the earthquake. Risk assessment of the blockage indicated that it was unlikely to collapse suddenly, and that eventual overtopping could be mitigated by notching the structure in order to create an engineered breach and achieve safe drainage of the lake. In addition to the installation of monitoring and warning instrumentation, for emergency planning we estimated several outburst scenarios equivalent to 20, 25, 33, and 50% of the dam failing suddenly, creating, respectively, 3.35, 3.84, 4.22, and 4.65 km 2 of flooded area, and overbank water depths of 4.6, 5.1, 5.7, and 6.2 m, respectively, in Mianyang, the second largest city in Sichuan Province, 48 km downstream from the blockage. Based on these scenarios, recommendations and plans for excavating a sluiceway, draining the lake, and downstream evacuation were proposed and later were implemented successfully, with the blockage breached by overtopping on June 10, less than a month after dam emplacement. The peak discharge of the release only slightly exceeded the flood of record at Mianyang City. No lives were lost, and significant property damage was avoided. Post-breaching evaluation reveals how future similar mitigation can be improved. Although initial breach erosion was slow, later erosion was judged uncontrollably rapid; increased slope of the engineered channel and adoption of a compound, trapezoid–triangular cross-section can be considered, as can other measures to control the rate of breach incision. Evacuees from Mianyang City spent an unnecessarily long time (12 days) in temporary settlements; more precise risk management planning can reduce this time in the future.

Sichuan Province↗