Geochemistry of mercury and other constituents in subsurface sediment—Analyses from 2011 and 2012 coring campaigns, Cache Creek Settling Basin, Yolo County, California

Cache Creek Settling Basin was constructed in 1937 to trap sediment from Cache Creek before delivery to the Yolo Bypass, a flood conveyance for the Sacramento River system that is tributary to the Sacramento–San Joaquin Delta. Sediment management options being considered by stakeholders in the Cache Creek Settling Basin include sediment excavation; however, that could expose sediments containing elevated mercury concentrations from historical mercury mining in the watershed. In cooperation with the California Department of Water Resources, the U.S. Geological Survey undertook sediment coring campaigns in 2011–12 (1) to describe lateral and vertical distributions of mercury concentrations in deposits of sediment in the Cache Creek Settling Basin and (2) to improve constraint of estimates of the rate of sediment deposition in the basin. Sediment cores were collected in the Cache Creek Settling Basin, Yolo County, California, during October 2011 at 10 locations and during August 2012 at 5 other locations. Total core depths ranged from approximately 4.6 to 13.7 meters (15 to 45 feet), with penetration to about 9.1 meters (30 feet) at most locations. Unsplit cores were logged for two geophysical parameters (gamma bulk density and magnetic susceptibility); then, selected cores were split lengthwise. One half of each core was then photographed and archived, and the other half was subsampled. Initial subsamples from the cores (20-centimeter composite samples from five predetermined depths in each profile) were analyzed for total mercury, methylmercury, total reduced sulfur, iron speciation, organic content (as the percentage of weight loss on ignition), and grain-size distribution. Detailed follow-up subsampling (3-centimeter intervals) was done at six locations along an east-west transect in the southern part of the Cache Creek Settling Basin and at one location in the northern part of the basin for analyses of total mercury; organic content; and cesium-137, which was used for dating. This report documents site characteristics; field and laboratory methods; and results of the analyses of each core section and subsample of these sediment cores, including associated quality-assurance and quality-control data.

California

Estimation and uncertainty of recent carbon accumulation and vertical accretion in drained and undrained forested peatlands of the southeastern USA

The purpose of this study was to determine how drainage impacts carbon densities and recent rates (past 50 years) of vertical accretion and carbon accumulation in southeastern forested peatlands. We compared these parameters in drained maple-gum (MAPL), Atlantic white cedar (CDR), and pocosin (POC) communities in the Great Dismal Swamp National Wildlife Refuge (GDS) of Virginia/North Carolina and in an intact (undrained) CDR swamp in the Alligator River National Wildlife Refuge (AR) of North Carolina. Peat cores were analyzed for bulk density, percent organic carbon, and 137 Cs and 210 Pb. An uncertainty analysis of both 137 Cs and 210 Pb approaches was used to constrain error at least partially related to mobility of both radioisotopes. GDS peats had lower porosities (89.6% (SD = 1.71) versus 95.3% (0.18)) and higher carbon densities (0.082 (0.021) versus 0.037 (0.009) g C cm −3 ) than AR. Vertical accretion rates (0.10–0.56 cm yr −1 ) were used to estimate a time period of ~84–362 years for reestablishment of peat lost during the 2011 Lateral West fire at the GDS. Carbon accumulation rates ranged from 51 to 389 g C m −2 yr −1 for all sites. In the drained (GDS) versus intact (AR) CDR sites, carbon accumulation rates were similar with 137 Cs (87 GDS versus 92 AR g C m −2 yr −1 ) and somewhat less at the GDS than AR as determined with 210 Pb (111 GDS versus 159 AR g C m −2 yr −1 ). Heightened productivity and high polyphenol content of peat may be responsible for similar rates of carbon accumulation in both drained and intact CDR peatlands.

Alligator Rivers National Wildlife Refuge, Great D